Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience

    Transport Canada (Federal Government) constructed the Halifax International Airport (HIA) near Halifax, Nova Scotia, Canada in the late-1950s. Site location criteria were primarily; direct access to t

    Jan 1, 2003

  • AUSIMM
    Productivity Improvement Case Study: Use of True TQM in Developing Australia's Largest Underground Coal Mine

    It is no longer adequate when starting a new mine to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency which requires systematic inv

    Jan 1, 1995

  • AUSIMM
    Productivity Improvement Case Study: Use of True TQM in Developing Australia's Largest Underground Coal Mine (eeca4b36-17c2-4559-b89b-8ed25f573d4c)

    It is no longer adequate when starting a new mine to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency which requires systematic in

    Jan 1, 1995

  • AUSIMM
    Mechanics of Rock/Tool Interaction in Disc Rock Cutting

    By M Hood, X S. L, W J. T Daniel, H Gurgenci

    It is believed that disc cutter shape affects rock fracture and therefore cutter performance and cutter life. However, the current generation of disc cutters is made of hardened steel and these cutter

    Jan 1, 1998

  • AUSIMM
    Mine Close-Out Criteria - Present Guidelines and Future Trends in Australia

    By McQuade C. V

    Mining is an activity which has, in the past, been regarded as often leaving land in a condition unfit for further use. As the need for development that is both economic and ecologically sustainable

    Jan 1, 1994

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Improved iron ore processing through digitalising conveyed ore flowsusing representative real time multi-elemental analysis

    By H Kurth

    High specification Prompt Gamma Neutron Activation Analysis (PGNAA) has been successfully applied to conveyed flows at iron ore operations since 2002 to representatively measure ore quality for improv

    Sep 18, 2023

  • AUSIMM
    Measuring the Redistribution of Stresses Resulting from New Excavations with Ambient Seismic Noise Correlations

    By F Brenguier, R A. Lynch, G Olivier

    The seismic velocities of intact rock are dependent on the applied stress. Unfortunately, the low susceptibility of seismic velocity to stress changes mean that changes in seismic velocity have to be

    May 9, 2016

  • AUSIMM
    Excavation of the Gjovik Olympic Mountain Hall - The World's Largest Rock Cavern for Public Use

    The Gj0vik Olympic Mountain Hall is the world's largest underground cavern for public use and was created primarily to facilitate the ice hockey tournaments for the 1994 winter Olympics in Norw

    Jan 1, 1995

  • AUSIMM
    Port Hedland Harbour Tunnel

    By A Bennett, A Peck

    BHP has recently constructed a Hot Briquetted Iron Plant at Port Hedland in the Pilbara region of Western Australia. Supply of iron ore fines to the plant is by conveyor from the companyÆs existing Ne

    Jan 1, 1999

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Reoxidation of Al-killed ultra-low C steel by FetO in CaO-Al2O3-MgOsat.- FetO slag representing RH slag by experiment and kinetic modelling

    By Y-B Kang, W-Y Cha, Y-M Cho

    Molten slag used in the secondary refining process (RH process) for the production of Ultra-Low C (ULC) steel is typically composed of CaO-Al2O3-MgOsat.-FetO with minor constituents. FetO in the RH sl

    Jun 19, 2024

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    Sustaining Minerals Education in Developing Countries – Lessons from Southeast Asia

    By D Laurence

    Australians are at the forefront of exporting their mining expertise in a number of areas. Minerals education is just one example. The growing economies of Southeast Asia host some of the most prospec

    Nov 22, 2011

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    The Integration of a Due Diligence Process into a Mining Operation

    A mining operation can be identified as demonstrating prudent management when a number of vital characteristics are evident.All risks and opportunities that are critical to the on-going success of the

    Jan 1, 1998

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020