Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Volume and Structural Changes Occuring During the Isothermal and Non-Isothermal Reduction of High Grade Hematite Pellets

    By Morrison AL

    The volume changes occurring during the reduction by hydrogen of single, high-grade hematite pellets under isothermal and non- isothermal conditions were investigated using a time-lapse photographi

    Jan 1, 1980

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Maintaining the Benefit - How to Ensure Mine to Mill Continues to Work for You

    By D La Rosa, W Valery, A Jankovic, S Ese

    Metso Minerals Process Technology Asia-Pacific (MMPT-AP) has been working with many mining companies worldwide performing æMine to MillÆ or Process Integration and Optimisation (PIO) studies. MMPT-AP

    Jan 1, 2007

  • AUSIMM
    Thermal Processing of Petroleum Fly Ash for Vanadium Recovery

    Thermal Processing of Petroleum Fly Ash for Vanadium Recovery

    Sep 13, 2010

  • AUSIMM
    Design of Grade Control Sampling Programs for Underground Gold Mines

    By S C. Dominy

    Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s

    Aug 22, 2011

  • AUSIMM
    The Mining Industry and Career Opportunities from a Graduates Perspective

    The mining industry provides employment opportunities for individuals from a wide variety of disciplines. Solid Energy New Zealand Limited (Solid Energy) is New ZealandÆs largest coal mining company a

    Jan 1, 2007

  • AUSIMM
    Present Practices And Future Trends In World Dry Bulk Handling Operations

    Over a century ago the first ship designed solely for carrying a bulk cargo was launched. This vessel, the "John Bowes", with a deadweight of 660 tonnes was a single decked ship with machinery and

    Jan 1, 1973

  • AUSIMM
    Flotation of Hematite Using C6-C18 Saturated Fatty Acids

    The homologous series of saturated fatty acids investigated in this study generally show a steady gradation of properties with chain length. The solution pKa values were assumed constant at 4.9, howev

    Jan 1, 2005

  • AUSIMM
    "The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"

    By J L. Macdonald, G S. King

    "The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts

    Jun 15, 2016

  • AUSIMM
    Geology of the Leigh Creek Coalfield

    By Townsend IJ

    The Upper Triassic Leigh Creek Coal Measures which include a number of seams of sub-bituminous black coal are preserved in four small intramontane basins. The largest is Telford Basin, 1,000 m in

    Jan 1, 1975

  • AUSIMM
    Optimising Coal Dust Suppression Factors in a Laboratory Using a Three-Level Factorial Approach

    By Tien J. C

    Many factors (type of coal mined, water pump pressure, wetting agent concentration, etc) will affect the performance of a dust suppression system using a water spray in an underground coal mine. Whi

    Jan 1, 1994

  • AUSIMM
    Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.

    By Baczynski NR, Fagan MJ

    A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited

    Jan 1, 1987

  • AUSIMM
    Rise and Pillar Rill Stoping at Golden Crown Mine

    By Rogers M, Sullivan B

    Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15

    Jan 1, 1993

  • AUSIMM
    Characterisation of mineral flotation along industrial circuits using mineralogical analysis

    By J Cortinez, P Vallejos, J Yianatos, M Rodriguez

    Nowadays, one of the main problems in current flotation plants and new projects is the significant decrease in feed grades and changes in the mineral composition, which has an important effect on the

    Aug 24, 2022

  • AUSIMM
    Approaches to Reporting Grade Uncertainty in High-Nugget Gold Vein Projects

    By W B. Edgar, S C. Dominy

    High-nugget effect vein-gold systems are generally considered to be one of the most challenging of deposit types to evaluate and exploit. To potential investors and mining companies, they are viewed a

    May 24, 2012

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018