Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Development of the Aircore Sampling SystemBy J M. Wallis
Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre
Oct 5, 2011
-
A Revolution in Raise Boring – The Development of the RBR900VFBy R J. Wood
Raise drilling (or raise boring) is not a new technology or methodology. The first raise drilling machine was developed by The Robbins Company (TRC) of the USA in 1962. TRC manufactured the first tunn
Mar 24, 2014
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South AfricaBy M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau
Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec
Nov 5, 2014
-
The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel ProjectBy C Czerny, T Elkington, L Lorenzen
The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha
Sep 29, 2013
-
Staying in the Game – the Importance of Engineering-based DecisionsBy P J. Fairfield
This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses
Jun 22, 2016
-
Recommended Design Methods and Serviceability Limits for Permanent Rock BoltsBy D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
Underground rock bolt detectionBy B Liu, W J. Zhang, S Saydam, B Li
Rock bolts are commonly used to reinforce ground in underground mining and civil tunnel environments. Rock bolts serve two main functions: i) they suspend large, loose blocks of ground, and ii) provid
Nov 29, 2022
-
Development of a Toxicity Approach to Evaluate Free Cyanide and Metal Cyanide Complexes in Waters Associated with Gold and Other MiningBy H Sichani-Teimouri, B N. Noller, J C. Ng, R N. Alsaadi, P L. Breuer, S Shini
Cyanide has been used for over a century worldwide for gold extraction. However, the presence of several metals and metalloids in ore requires greater amount of cyanide for an efficient gold recovery
Jul 16, 2014
-
Designing User Interfaces for the Mines of the Future – User Centred ApproachBy E Widzyk-Capehart
The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed
Nov 22, 2011
-
Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical ClimateBy A M. Barrett, P J. Chapman
As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b
Jul 27, 2015
-
Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater EffectsBy S France
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an
Mar 8, 2011
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case studyBy P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
Automated Mineralogy for Ore Characterisation and Plant OptimisationBy Y Gu, R Fandrich
Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat
Jan 1, 2007
-
Analysis of dust behaviour in the face zone utilising- CFD modelling toolsBy O Joneydi, J Viljoen, R Funnell
Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.
Oct 12, 2022
-
Productivity improvement through collaborative shift planning and trackingBy E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century MineBy R Wynn, N Stoitis, R A. Lauten, H Liang
At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a
Sep 1, 2014
-
The practicalities of effective stress measurement in rockBy I Gray
This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass
Nov 30, 2018
-
Tailings governanceBy T Alexieva
Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana
Jul 23, 2018