Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Research Into the Revegetation of Concentrator Tailings Dams at Mount ISABy Whiteman P. C, Stacey G. S, Hunter G. D
Processing of lead-zinc and copper ores by Mount Isa Mines Limited produces large quantit- ies of concentrator tailings waste which is pumped as a slurry to special dams where the solids are allowed
Jan 1, 1974
-
In-Pit Crushing and Conveying Bench OperationsBy T Atchison
In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v
Jul 11, 2011
-
Starter dyke optimisation with Muk3D and GoldSimBy C A. Cooper, G A. Suter
The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai
Jul 23, 2018
-
Integrated Communications for Surface and Open Pit ApplicationsBy G Booth
Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope
Jan 1, 2008
-
Cooling Pathways for Deep Australian Longwall Coal Mines of the FutureBy B Belle, M Biffi
Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu
Jul 1, 2013
-
Recent Process Developments at the Phu Kham Copper-Gold Concentrator, LaosBy P Walker, I Crnkovic, D Bennett
The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex
Oct 29, 2012
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014
-
Controlled Blasting for Civil Construction in an Urban EnvironmentBy R Domotor
Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r
Nov 8, 2011
-
Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not ComplianceBy A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon
Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant
Jul 10, 2012
-
In-Pit Crushing and ConveyingBy I Lourel
In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t
Jan 1, 2009
-
REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaningBy E Bouchard March, F Lavoie, B Legare, K Bourassa
Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca
Nov 8, 2021
-
Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head GradeBy K Jupp, T J. Howard
Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled
Jan 1, 2009
-
The Use OF Synthetic Polymer As A Drying Aid In Pelletizing (5a431b5e-3741-4ee5-b8f2-2d3b5f851251)A new watersoluble binder for mineral ore pellets has been developed by the sulfonation of bituminous materials. A highly effective binder for iron ore pellet making is obtainable from bituminous mate
Jan 1, 1974
-
Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and ConstructionBy A Hughes, S G. Rosin
This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the
Sep 17, 2014
-
Variability of Gravity Recoverable Gold Values in Relation to Test Sample SizeBy S C. Dominy
The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti
Sep 29, 2013
-
Controls on the Hydrology of Large Volcanically Hosted Geothermal Systems : Implication for Exploration for Epithermal Mineral DepositsBy Lawless JV
Recent exploration for gold on the Pacific Rim has utilised similarities between active hydrothermal systems and epithermal gold deposits. The major control over formation of such deposits is the
Jan 1, 1987
-
Process Amenability Studies on Goethite-abundant Iron Ore FinesBy T Raynlyn, S Hapugoda, V Nunna
The predominant phase in most Marra Mamba, channel iron deposits and detrital iron ore deposits is goethite. Goethite abundant iron ore fines tend to have complex mineralogical associations and fine d
Jul 13, 2015
-
The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore OperationsBy A L. Wills
Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus
Jul 11, 2011
-
Precast Concrete Segmental Tunnel Linings – The State-of-the-artBy A Harding, M Chappell
Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig
Sep 17, 2014
-
Prognostic models for electroslag remelting process and slag engineeringBy D Stepanenko, G Stovpchenko, L Lisova, D Togobitskaya, L Medovar
Classical electroslag remelting of consumable electrodes is a drop-by-drop melt feeding through a slag layer into a renewing molten metal bath, slowly solidifying into a homogeneous, dense, defectfree
Aug 21, 2024