Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)By M P. Murphy, C M. D Barton
When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t
May 24, 2023
-
Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off VolumesBy A Woodley, N C. Kunz
A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate
Nov 26, 2013
-
Experiments on Rock Burst and its ControlBy L R. Sousa, M He
Rock burst is common in deep underground excavations and is characterised by a violent ejection of block rocks from excavation walls. It is critical to understand the phenomenon of rock burst and part
Nov 5, 2014
-
Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated LandformsBy T Leidich, M Van Zyl, H Lacy
Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof
Jul 16, 2014
-
Comparison of Acid Production From Pyrite and JarositeBy M Berndt
Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt
Jan 1, 2003
-
Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South AfricaBy R Moller
Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt
Jan 1, 2005
-
Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control SystemBy J Knoblauch, D, P J. J Strobos, C Foggo
The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding
Jan 1, 2006
-
The Evolution of Wall Control Programs at Kidston Gold MinesBy A Marton
Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega
Jan 1, 2001
-
Blasting Near Mine Surface InfrastructureBy A J. Moore
Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established
Nov 8, 2011
-
REGCHEM Database Developments and Analysis of Stream Sediment Geochemical Data for OtagoBy R L. Brathwaite, R Carver
The REGCHEM (Regional Exploration Geochemistry) database of open file mining company data, managed by GNS Science, has recently been upgraded with the compilation of additional data, especially for th
Jan 1, 2007
-
Innovative Beneficiation of Iron Ore Fines with allflux® Two-Stage Fluidised Bed Classifiers and gaustec® Wet High Intensity Magnetic SeparatorsBy A Horn
Mineral processing is characterised by a constant adaptation to changing raw materials and market conditions. It is the link between the mined raw material and a marketable product. As a lot of high-g
Jul 11, 2011
-
Dilution optimisation in sublevel open stoping operationsBy A Vakili
Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk
Mar 29, 2023
-
The Introduction of Axis at Black Star Open CutBy M Gabbitus, B Young, T Lukins, M Slater
This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ
Sep 18, 2012
-
Optimisation of Length of Retreat Longwall FacesBy Misra A
After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o
Jan 1, 1995
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
How are Indian mills changing their feedstock in order to address decarbonisation goals?By D Goel
India, the second-largest steel manufacturer globally, achieved crude steel production of around 126 million tonnes (Mt) in the last financial year of April 2022 to March 2023 (FY23), against an insta
Sep 18, 2023
-
Sustainable Development and the Minerals Sector ù Leaving a Lasting LegacyBy L Chaffey, M Buckland
The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil
Jan 1, 2006
-
Geometallurgy and Ore Processing of the Hibbing Taconite Lake Superior-Type Magnetite Taconite Deposit, Mesabi Iron Range, Minnesota, USABy J D. Lubben
Hibbing Taconite is a Lake Superior-type granular magnetite taconite deposit occurring within the Biwabik Iron Formation along Minnesota’s central Mesabi Iron Range. The deposit is situated on the nor
Jul 11, 2011
-
Using SAP Business Objects to Deliver Actionable Information for Operators to ManagementReal-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo
Sep 26, 2011
-
Guidelines for Economic Evaluation of ProjectsBy P Card
“Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should
Aug 8, 2011