Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing IndustryThe An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i
Jan 1, 2009
-
Calibration and Testing of a Geometallurgical Leaching Protocol for Determining Copper Mineralogical DeportmentBy N L. Turner, D J. Robinson, A J. McFarlane, N M. Chapman, L L. Kuhar, R L. Meakin, R Martin
A number of geometallurgical tests have been developed within the AMIRA P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project, an interdisciplinary collaborative research project involvin
Sep 29, 2013
-
Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual
Jun 1, 2010
-
Practical Implicit Geological ModellingBy H J. Ross, R K. Beatson, T J, W R. Fright
Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be
Jan 1, 2003
-
New Development of Cemented Fill in Various Chinese Metal Mines (9895d297-773f-45f4-91bd-48419c188988)By Cai S, Zhou C
The requirement of mineral resources is increasing as the economy is continually increasing in China. The mining practices of various complex sulphide deposits and precious metal deposits, and the t
Jan 1, 1998
-
Implementation of a management operating system at the Telfer Underground Gold MineBy M Franklin, C Puglisi, S Fitch
Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and
Mar 15, 2021
-
Paper No. 162. The Refining of Base Bullion at Port Pirie, and Treatment of By-Products.The article, as written, represents a short account of the treatment of the base bullion from the Broken Hill ores, as carried on at Port Pirie, for the recovery of lead, silver, and gold, and for the
Jan 1, 1907
-
Mining for Water - Partnering for Sustainable Water Use in Semi-Arid RegionsBy N Lefebvre, M Jakeman, R Aseervatham
Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr
Jan 1, 2006
-
Upgrading of Indonesia's Bauxite by Washing MethodUpgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40
Sep 13, 2010
-
Understanding What Constitutes the Mining Industry's 'Social Licence to Operate' in AustraliaSocietal expectations about how the industry operates and treats its people will be a key driver in the development of the Australian mining industry over the next 20 - 30 years (Moffat, Mason and Lit
Jun 1, 2010
-
Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving MinesBy G Pizarro, O Miranda, D Rosales
In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i
May 9, 2016
-
Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces MineBy R M. Arellano, D M. W Harney, M Makhuvha
Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous
Aug 18, 2014
-
The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel MineBy K Rees
In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow
Mar 26, 2012
-
Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west AustraliaBy A Grigg, L Hackett
Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging
Jul 16, 2014
-
Tectonics of Southern PacrimFour data sets are required to put constraints on the tectonic evolution of the southern rim of the Pacific Ocean basinI . data bearing on the dispersal of the major Gondwanaland continental fragments
Jan 1, 1990
-
Results of Radiometric Surveys in the Alligator River and Cobourg Peninsula Area of the Northern TerritoryThe Bureau of Mineral Resources has been engaged in regional geological and geophysical field work in the Alligator River and Cobourg Peninsula area since 1971, following the discovery of major ura
Jan 1, 1975
-
CAF Backfill of Primary Stopes at Callie Underground MineCallie underground gold mine is part of the Newmont Tanami Operations, and is now the primary provider of ore to the Granites processing Mill. The Callie underground mine has produced in excess of 7.6
Jan 1, 2005
-
Implementing condition-based wear surface managementBy P Velletri, N Gaylard
The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi
Nov 8, 2021
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Paper No. 197. Notes on Tin Sluicing in Tasmania.IN this paper an attempt is made to describe the sluicing operations on the tin fields of north-eastern Tasmania. No claim is made to completeness, for much of the ground has already been covered, and
Jan 1, 1911