Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

    By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu

    Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the

    Nov 30, 2018

  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • AUSIMM
    Underground Mining Methods at Mount Morgan, Queensland (4c024877-4266-4ad5-a39e-01b065af258e)

    By Sewell L. G, White H. S

    OWING to two large falls of ground which resulted in serious accidents occurring towards the end of 1908, it became evident that the "open chamber" system then in use was unsuitable for the

    Jan 1, 1911

  • AUSIMM
    Mining and Handling of Nauru Phosphate Rock

    Nauru Phosphate, which is one of the world's highest grade deposits discovered to date, contributed in 1969, 2.2 million tons of the total world production of 77.7 million tons. Phosphate produ

    Jan 1, 1971

  • AUSIMM
    Towards Improved Hydrocyclone Models - Contributions from Computational Fluid Dynamics

    Towards Improved Hydrocyclone Models - Contributions from Computational Fluid Dynamics

    Sep 13, 2010

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    The ABC of Mine to Mill and Metal Price Cycles

    By J Pease, P Cameron, D Drinkwater

    "In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.

    Oct 10, 2016

  • AUSIMM
    Envisioning the rehabilitation of assets through co-design and gamification

    By S Grant, S Emeric, P Baker, E Jones, D Clark

    As we strive for a sustainable and resilient future, repurposing assets has become a top priority. In Australia alone, we have a significant number of mineral projects in the pipeline, extensive exist

    Aug 2, 2023

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Multiphysics modelling and virtual motion simulation to optimise mining systems in extreme conditions – insights from Mars Science Laboratory (MSL) Curiosity Rover

    By S Padekar, C Tapia, D Likhachev, S Harlikar, D Sapkale

    In the quest to access valuable critical minerals, humankind is expanding the frontier into extreme environments like space and deep-sea mining. These ambitious enterprises involve considerable costs

    Sep 1, 2024

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    The Coolest Job There Ever Was

    I once read an æarticleÆ in FHM Magazine entitled æThe Coolest Jobs There Ever WasÆ. It was about a group of guys who were pursuing careers that any person on the planet would just kill for. I distinc

    Jan 1, 2005

  • AUSIMM
    Collaborative development of mine ready electric vehicle

    By H Guthrie, J Hodder, J Bain, S Durkin

    Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle

    Mar 15, 2021

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust Control

    By H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim

    An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi

    Aug 24, 2015

  • AUSIMM
    The Performance of Trial Covers Used for the Rehabilitation of Acid Generating Coal Reject Dumps in Northern Kwazulu-Natal, South Africa

    By N Bezuidenhout

    The performances of ten field-scale experimental final covers were evaluated over an eight-year period. The covers were evaluated as part of the rehabilitation of acid generating coarse coal reject du

    Jan 1, 2003

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availability

    By E Shilov, R Dixon, L Tovey

    BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit

    Nov 29, 2022