Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A guide to maximising ball mill circuit classification system efficiency (CSE), for operators and equipment designersBy O Arafat, R E. McIvor, K M. Bartholomew
It is well known in the industry that good classification system performance is vital to efficient ball mill circuit performance. But what is meant by good classification system performance, and how i
Aug 29, 2018
-
Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, PortugalBy M Byrne, P Newman, M Lindqvist
SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss
Jan 1, 1998
-
Geotechnical Centrifuge Technology for Characterising the Interaction of Tailings and Pore Water over Decadal Time PeriodsBy D Anderson, W Timms
"A geotechnical centrifuge can characterise and model the interaction of tailings and fluids over very long time periods by accelerating drainage and consolidation processes. This technology can be co
Jul 27, 2015
-
Raising Sangdong – A Staged Approach to the Redevelopment of an Old OperationBy C Lutherborrow
The Sangdong Tungsten/Molybdenum Deposit is located in the Republic of Korea and was discovered in 1916. At this time Korea was a colony of Japan. It was mined for two years after discovery closing in
Aug 22, 2011
-
Paper No. 122. The Employment if Unskilled Labour in Mines And The Necessity For Training to The Miner's Occupation.The subject of my paper is one which, I am certain, has exercised the mind of every man on whom depends the safe and economical conduct of mining operations; particularly in this district where the en
Jan 1, 1903
-
Use of On-Belt Analysers for Improved Process Control of Conveyed MaterialsBy M Edwards
The paper outlines the successful application of some of the on-belt technologies available from Scantech International Pty Ltd and how these have provided benefits in a number of mining and mineral p
Jan 1, 2008
-
The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, CanadaBy L Smith, R Beckie
Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten
Jan 1, 2003
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile SettlementsBy D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015
-
-
Sampling Quality Assurance and Quality Control Requirements for Mining ProjectsThe creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl
Mar 1, 2010
-
Characterisation of Gold Ore from the Nick O’Time Shoot (Tarnagulla, Australia) Using High Resolution X-ray Computed TomographyBy I M. Platten, Y Xie, B W. Cuffley, S C. Dominy
"Geometallurgical programs require the collection of representative samples for geochemical, mineralogical and metallurgical test work. Such protocols must be designed to suit the style of orebody in
Jun 15, 2016
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
The impact of ventilation on demand on impeller fatigue lifeBy L Salvestro
Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating
Oct 12, 2022
-
Moisture/particle interactions under oscillatory motion – model developmentBy K Williams, A Lavrinec, V Gurung, D Ilic
The moisture content of iron ore during handling can range from the dust extinction moisture at the point of arrival at the port to the transportable moisture limit at the point of loading ships for m
Sep 18, 2023
-
A Review of the Kapit Orebody, Lihir Island Group, Papua New GuineaBy J R. Robinson
Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio
Jan 1, 2004
-
Operational Management of Underground In-Seam Drilling SitesBy ZáWang, F Hungerford, T Ren
Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov
Jul 1, 2013
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Reply to Contributed Discussion (this issue) by John Shepher and L. Keith RixonBy ALAN J. HARGRAVES
It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec
Jan 1, 1983
-
Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to productionBy H Wright
Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp
Mar 29, 2023
-
Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek ProjectBy J Edman, RáBeamish, G Cambourn, B Beamish
Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola
Jul 1, 2013