Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Economic Exploitation of Deep Coal Seams by Opencast Methods

    By Brown N. R

    This paper attempts to highlight some of the problems encountered in the economic exploitation of the deeper coal seams by opencast mining methods. The major cost elements of three methods of over

    Jan 1, 1986

  • AUSIMM
    Developments in Tube Bundle Gas Monitoring

    By M Watkinson

    Tube bundle monitoring systems have come a long way from their first introduction to coal mining in the late 1960s/1970s. Early developments in the United Kingdom (UK) commenced with single gas analys

    Aug 31, 2015

  • AUSIMM
    Positive influence of WHIMS concentrate on the sintering performance of Roy Hill fines

    By S Hapugoda, J R. Manuel, X Cao, B D. McDonald, N A. Ware, L Lu

    Roy Hill is a large iron ore mining, processing, railing and port operation in the Pilbara region of Western Australia. Since delivering its first shipments to customers in December 2015, Roy Hill has

    Nov 8, 2021

  • AUSIMM
    Zero Liquid Discharge in Coal Mining Operations

    By A Dal-Corobbo, R Zick

    The coal mining industry is now faced with new regulatory requirements that limit the discharge of chlorides into receiving streams. To meet these new regulatory standards for treated mine water, a ze

    Nov 26, 2013

  • AUSIMM
    Low Shock Energy Emulsion Based Wet Hole Explosives

    By Moxon N. T

    A series of low shock energy water resistant emlulsion based explosives have been developed by combining inert materials, such as Perlite P500, into the formulation. The material handling, water res

    Jan 1, 1990

  • AUSIMM
    Marketing Industrial Minerals

    'Nothing happens until something is sold' This statement is not original - it is a necessary orientation for marketing industrial minerals. The most important single philosophy of marketing

    Jan 1, 1978

  • AUSIMM
    Aluminothermic production of silicon using different raw materials

    By M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin

    Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development

    Jun 19, 2024

  • AUSIMM
    Services of the Mining Warden

    The preamble to the mining Act sets out that such Act is to provide for the encouragement and regulation of mining within the State of Queensland. This paper will attempt to follow the legislative pat

    Jan 1, 1986

  • AUSIMM
    Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific Rim (89cff146-d60b-4074-bb84-62f6785f9161)

    By Totterdell JM

    The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early

    Jan 1, 1995

  • AUSIMM
    Structural Control of Mineralisation at the Karangahake Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland

    The Karangahake epithermal Au-Ag mine consists of two main lodes, the Maria and the Welcome/Crown hosted in Miocene andesites. Mineralisation is strongly constrained to major structures and is genetic

    Jan 1, 2003

  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Towards integration of pyro- and hydrometallurgical unit operations for efficient recovery of battery metals from waste lithium-ion batteries

    By J Zhang, L Klemettinen, A Jokilaakso, J Biswas, J Partinen, H O’Brien, A Klemettinen

    Waste lithium-ion batteries (LIBs) are important secondary sources of many valuable materials, including Critical Raw Materials (CRMs) defined by the European Union (EU): lithium, cobalt, manganese, a

    Jun 19, 2024

  • AUSIMM
    Kalgoorlie Tailings Retreatment Project-'Kaltails'

    The Kaltails Project is situated close to the city of Kalgoorlie-Boulder in Western Australia. Located on the south-eastern fringe of the Golden Mile, Kaltails has been in operation since June 1989. T

    Jan 1, 1992

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • AUSIMM
    Regional structural control of selected Cu/Au occurrence in Papua New Guinea

    Intrusion related Cu/Au mineralisation is localised in Pacific Rim island arcs by arc parallel, termed accretionary structures; or arc normal, termed transfer structures. In Papua New Guinea, NE trend

    Jan 1, 1994

  • AUSIMM
    Developments in Explosive SupplierûCustomer Relationships

    The original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta

    Jan 1, 2004

  • AUSIMM
    Forecast Trends of Australian Mineral Production to the Year 2000

    By Huleatt M, Perkin D, McLeod I, Mock C, Pratt R, Gourlay A, Timoney E, Knight N, Ward J

    Generally speaking, Australia's reserves of its more important minerals (in terms of export earnings) are adequate to sustain forecast rates of production to the year 2000. The rate of foreca

    Jan 1, 1981

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994