Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Life Cycle Assessment of Process Options for Copper Production

    By Y Zhuang, S La Brooy

    The selection of the optimum process route for a new project has traditionally consisted of investigating existing options and ranking them in terms of cost, technical risk and environmental acceptabi

    Jan 1, 2002

  • AUSIMM
    Broken Hill Vughs-Occurrence and Some Probable Causes

    Although these subterranean cavities are common to the Broken Hill big lode, yet the Broken Hill Proprietary is the most prolific in their occurrence, loud they have been found of various dimensions a

  • AUSIMM
    Avoiding Unnecessary Drilling

    The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian

    Jan 1, 1975

  • AUSIMM
    Development and Validation of Ore Characterisation Test and its Use in Variability Campaigns of Comminution Circuits

    Development and Validation of Ore Characterisation Test and its Use in Variability Campaigns of Comminution Circuits Impact testing was developed by assessing the fragmentation characteristics of ore

    Sep 13, 2010

  • AUSIMM
    Use of Helicopters in Mineral Exploration to Minimise Environmental Impact, Mount Painter Area South Australia

    During a mineral exploration program in an environmentally sensitive area nearMount Painter in South Australia, a helicopter was used to position, construct and service drilling rigs in order to avoid

    Jan 1, 1995

  • AUSIMM
    A geometallurgical perspective on a high-grade iron ore deposit at Kiirunavaara, northern Sweden

    By K Niiranen

    Luossavaara-Kiirunavaara AB (LKAB) operates one iron ore mine, three concentration plants and three pelletising plants in Kiruna, Sweden. The current methods of separation at the beneficiation plants

    Jul 24, 2017

  • AUSIMM
    The-Application of Optimal Control to Open-Pit Planning

    Preliminary work being undertaken on the optimisation of decision strategies for an open-pit metalliferous deposit is presented. The Optimal Control method has been selected rather than the easier to

    Jan 1, 1984

  • AUSIMM
    Post-Mine Leaching of Galena and Marmatite at Broken Hill (ea61d7ab-2e88-4fdc-9bea-cd90f66cb557)

    By Blanchard R

    The discussion submitted by Drs. Stillwell and Edwards is at once helpful and gratifying to the authors. Their contribution deals with two phases of the problem-(I) an additional suggestion for the re

    Jan 1, 1943

  • AUSIMM
    Opportunities and Future Directions for Aluminium Smelting Technology

    The 115-year history of the Hall-Heroult process for production of aluminium has been characterised by a sustained technology-driven improvement in costs and productivity. In the past decade the indus

    Jan 1, 2000

  • AUSIMM
    Notes on Sampling

    This paper is intended partly as a summary of the conclusions that have been arrived at by various authorities on this matter, and also with a view to initiate some discussion on the subject, especial

    Jan 1, 1904

  • AUSIMM
    Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem Database

    By J R. Goff, R Carver, D S. Sheppard

    The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma

    Jan 1, 2006

  • AUSIMM
    The Resource Management Act 1991, Where to From Now?

    By J Morton

    The Resource Management Act 1991 represented an innovative and unique piece of planning and environmental legislation when it was introduced. Since the Act was passed into law in 1991 it has been subj

    Jan 1, 2004

  • AUSIMM
    DML Resources Limited - Mining Division Alluvial Gold Mining on the West Coast

    DML Resources Limited - Mining Division produced over 50 000 oz of alluvial gold in the 1995 - 1996 year from five operations located in the West Coast and Otago Regions on the South Island of New Zea

    Jan 1, 1996

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AUSIMM
    Geometallurgical Challenges of Namakwa Sands û A South African Titanium-Zirconium Heavy Minerals Mine

    By A Rozendaal

    Namakwa Sands, a heavy minerals beneficiation business situated along the west coast of South Africa, is a major producer of titanium slag, pig iron, ceramics quality zircon and rutile concentrate to

    Jan 1, 2008

  • AUSIMM
    Alluvial Platinum in the Howard Valley, Nelson Lakes Area û Origin and Comparison with Some Other New Zealand Platinum Occurrences

    By K Palmer

    Alluvial platinum was recovered during gold mining operations in Maud Creek, a tributary of the Howard River. Average electron probe analyses give Pt 88.75, Fe 5.27, Ir 0.70, Os 1.06, Pd 0.34, Ru 0.14

    Jan 1, 1987

  • AUSIMM
    The Application of Geological Control in Coal Mining

    By McKenzie P

    The techniques of geological control developed by the Coal Geology Sections of the Broken Hill Proprietary Company Limited and Australian Iron and Steel Proprietary Limited in providing geological ser

    Jan 1, 1963

  • AUSIMM
    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits

    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits With increased emphasis on reducing costs and carbon emissions in mineral processing, it is becoming essential to

    Sep 13, 2010

  • AUSIMM
    Geometallurgical sampling protocol validation by bulk sampling in a sheeted vein gold deposit

    By Y Xie, L O’Connor, S C. Dominy

    Sheeted vein gold deposits are characterised by multiple subparallel veins and often free milling gold. Variability in gold grade and recovery parameters are enhanced by poorly designed sampling and t

    May 9, 2017

  • AUSIMM
    Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, Spain

    By M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena

    The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,

    Jan 1, 2008