Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Life Cycle Assessment of Process Options for Copper ProductionBy Y Zhuang, S La Brooy
The selection of the optimum process route for a new project has traditionally consisted of investigating existing options and ranking them in terms of cost, technical risk and environmental acceptabi
Jan 1, 2002
-
Broken Hill Vughs-Occurrence and Some Probable CausesAlthough these subterranean cavities are common to the Broken Hill big lode, yet the Broken Hill Proprietary is the most prolific in their occurrence, loud they have been found of various dimensions a
-
Avoiding Unnecessary DrillingThe extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian
Jan 1, 1975
-
Development and Validation of Ore Characterisation Test and its Use in Variability Campaigns of Comminution CircuitsDevelopment and Validation of Ore Characterisation Test and its Use in Variability Campaigns of Comminution Circuits Impact testing was developed by assessing the fragmentation characteristics of ore
Sep 13, 2010
-
Use of Helicopters in Mineral Exploration to Minimise Environmental Impact, Mount Painter Area South AustraliaDuring a mineral exploration program in an environmentally sensitive area nearMount Painter in South Australia, a helicopter was used to position, construct and service drilling rigs in order to avoid
Jan 1, 1995
-
A geometallurgical perspective on a high-grade iron ore deposit at Kiirunavaara, northern SwedenBy K Niiranen
Luossavaara-Kiirunavaara AB (LKAB) operates one iron ore mine, three concentration plants and three pelletising plants in Kiruna, Sweden. The current methods of separation at the beneficiation plants
Jul 24, 2017
-
The-Application of Optimal Control to Open-Pit PlanningPreliminary work being undertaken on the optimisation of decision strategies for an open-pit metalliferous deposit is presented. The Optimal Control method has been selected rather than the easier to
Jan 1, 1984
-
Post-Mine Leaching of Galena and Marmatite at Broken Hill (ea61d7ab-2e88-4fdc-9bea-cd90f66cb557)By Blanchard R
The discussion submitted by Drs. Stillwell and Edwards is at once helpful and gratifying to the authors. Their contribution deals with two phases of the problem-(I) an additional suggestion for the re
Jan 1, 1943
-
Opportunities and Future Directions for Aluminium Smelting TechnologyThe 115-year history of the Hall-Heroult process for production of aluminium has been characterised by a sustained technology-driven improvement in costs and productivity. In the past decade the indus
Jan 1, 2000
-
Notes on SamplingThis paper is intended partly as a summary of the conclusions that have been arrived at by various authorities on this matter, and also with a view to initiate some discussion on the subject, especial
Jan 1, 1904
-
Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem DatabaseBy J R. Goff, R Carver, D S. Sheppard
The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma
Jan 1, 2006
-
The Resource Management Act 1991, Where to From Now?By J Morton
The Resource Management Act 1991 represented an innovative and unique piece of planning and environmental legislation when it was introduced. Since the Act was passed into law in 1991 it has been subj
Jan 1, 2004
-
DML Resources Limited - Mining Division Alluvial Gold Mining on the West CoastDML Resources Limited - Mining Division produced over 50 000 oz of alluvial gold in the 1995 - 1996 year from five operations located in the West Coast and Otago Regions on the South Island of New Zea
Jan 1, 1996
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessmentBy A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
Geometallurgical Challenges of Namakwa Sands û A South African Titanium-Zirconium Heavy Minerals MineBy A Rozendaal
Namakwa Sands, a heavy minerals beneficiation business situated along the west coast of South Africa, is a major producer of titanium slag, pig iron, ceramics quality zircon and rutile concentrate to
Jan 1, 2008
-
Alluvial Platinum in the Howard Valley, Nelson Lakes Area û Origin and Comparison with Some Other New Zealand Platinum OccurrencesBy K Palmer
Alluvial platinum was recovered during gold mining operations in Maud Creek, a tributary of the Howard River. Average electron probe analyses give Pt 88.75, Fe 5.27, Ir 0.70, Os 1.06, Pd 0.34, Ru 0.14
Jan 1, 1987
-
The Application of Geological Control in Coal MiningBy McKenzie P
The techniques of geological control developed by the Coal Geology Sections of the Broken Hill Proprietary Company Limited and Australian Iron and Steel Proprietary Limited in providing geological ser
Jan 1, 1963
-
Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) CircuitsComparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits With increased emphasis on reducing costs and carbon emissions in mineral processing, it is becoming essential to
Sep 13, 2010
-
Geometallurgical sampling protocol validation by bulk sampling in a sheeted vein gold depositBy Y Xie, L O’Connor, S C. Dominy
Sheeted vein gold deposits are characterised by multiple subparallel veins and often free milling gold. Variability in gold grade and recovery parameters are enhanced by poorly designed sampling and t
May 9, 2017
-
Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, SpainBy M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena
The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,
Jan 1, 2008