Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984

  • SME-ICGCM
    Application in Design for Close Proximity Multi-Seem Mining

    Virtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl

    Jan 1, 1987

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    Estimating Coal Pillar Strength for Low Coal Seam

    By Andre Cezar Zingano

    "The objective of this paper is to estimate the coal seam strength and the pillar safety factor for low coal seams using back analysis and rock mass characterization. The coal seam strength is very im

    Jan 1, 2015

  • SME-ICGCM
    An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data

    By Pinnaduwa H. S. W. Kulatilake, Biao Shu

    The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes

    Jan 1, 2015

  • SME-ICGCM
    Study on the Modified Model of Probability Integra Method

    By Zhang Hongzhen

    The fast convergence of boundary is a major problem of probability integral method, especially for the prediction of mining under thick alluvium, abandoned mine goaf, etc. To solve this problem and im

    Jan 1, 2014

  • SME-ICGCM
    Three?Dimensional Ground Stability Study Around a Mine Tunnel in a Highly Discontinuous Rock Mass under Significant in Situ Stress

    By Pinnaduwa H. S. W. Kulatilake

    To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior of the rockmass surrounding the underground mine excavation. The aim of

    Jan 1, 2013

  • SME-ICGCM
    Research on Abutment Pressure Distribution for Longwall Face Mining Through Abandoned Gateroads

    By Peng Cao, Jimin Su, Yang Li

    "Abutment pressure distribution is different when a longwall panel is passing through the abandoned gateroads in a damaged coal seam. According to the geological conditon of panel E13103 in Cuijiazhai

    Jan 1, 2018

  • SME-ICGCM
    Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle Sandstone

    By Michael Murphy

    A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.

    Jan 1, 2014

  • SME-ICGCM
    Improving Roof Control At A South African Coal Mine

    By Alan Bugden

    Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and

    Jan 1, 2001

  • SME-ICGCM
    Headgate Rehabilitation through Roof Fall Reconsolidation at Broadmeadow Mine

    By Robert J. Coutts, Dan A. Payne

    "The Broadmeadow mine is a punch longwall mine owned and operated by BHP Billiton Mitsubishi Alliance (BMA) in the Bowen Basin of Queensland, Australia. In 1999, an exploratory adit was driven as part

    Jan 1, 2010

  • SME-ICGCM
    Monitoring Consolidation Settlement Deformation in Deep Borehole of Unconsolidated Strata USing Fiber Bragg Grating Sensing

    By Liang Dong, Jinxuan Liu, Biao Qiu, Jing Chai

    "The Cenozoic unconsolidated strata in the east area of China are composed of clay, sandy clay, fine sand, hardpan, etc. Numerous shafts of the coal mines in these areas have been damaged in various d

    Jan 1, 2010

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SME-ICGCM
    Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its Influence

    By Wenbing Guo, Yi Tan, Erhu Bai

    "It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn

    Jan 1, 2016

  • SME-ICGCM
    The Relationship between Ultrasonic Velocities and Mechanical Damage in Sandstone under Cyclic Loading

    By Hongwei Zhang, Sen Yang, Shimin Liu

    "This laboratory study investigates the damage evolution of sandstone specimens under two types of cyclic loading conditions through monitoring and analyzing the variations of elastic moduli and ultra

    Jan 1, 2017

  • SME-ICGCM
    Establishment and Application of Deformation Monitoring System of Roadway Based on the Three?Dimensional Model Experiment

    By Yongping Wu

    Roadway deformation and stress migration occur with uncertainty and randomness because of geology, tunneling and mining influence. In order to study the surrounding rock deformation and failure mechan

    Jan 1, 2013

  • SME-ICGCM
    Determination of Effective Column Lengths for Resin-Grouted Roof Bolts

    By W. A. Cincilla

    The use of resin-grouted rock anchors continues to gain popularity in underground wall mines in the United States. It is estimated that during 1985, more than 30% and as many as 35% of all roof bolts

    Jan 1, 1986

  • SME-ICGCM
    Roof Bolting in Low Seam Mining with Thick "Stack Rock" Roof under High Horizontal Stress

    By Peter Zhang, Gary Deemer, Rod Lawrence, Scott Peterson, Scott Wade, Mike Mishra, Rick Smith, Robert Bottegal, Ed Zeglen

    "Thinly-laminated silty shale that falls like ""stack rock"" is always difficult to support in underground coal mines. With thin laminations of 2.5 to 52 mm (0.1 to 2 in) thick and weak bonding betwee

    Jan 1, 2010

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018