Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Identification Of Factors Affecting Horizontal Displacement In Subsidence Process

    By Yi Luo

    In the study of the topographical effects on surface movement due to underground longwall mining, the factors that affect the incremental horizontal displacements are identified using 10 collected cas

    Jan 1, 1996

  • SME-ICGCM
    Effects of Transverse Isotropy on Vertical Stresses When Multi?Seam Mining under Supercritical Longwall Panels

    By Anastasia M. Suchowerska

    The design of effective ground support requires a sound understanding of the pre-mining state of stress in the stratum to be mined. Irregularities in the stress field encountered during multiseam mini

    Jan 1, 2012

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Field Monitoring of Rock Bolting Performance in Weak Roof Strata

    By Tingkan Lu

    To understand the reinforcing mechanisms of the fully grouted resin bolt and clarify its performance in weak roof strata, the field monitoring investigation using instrumented bolts has been conducted

    Jan 1, 1998

  • SME-ICGCM
    Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study

    By Sandin E. Phillipson

    The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area

    Jan 1, 2012

  • SME-ICGCM
    Physical Simulation of Overburden Movement and Stability of Aquiclude in Shallow Seam Mining

    By Qingxiang Huang

    Shallow seam coal field has the largest coal reserve in China. Mining in shallow depth causes serious problems. One of them is subsurface dewatering. In this paper, the physical simulating model was p

    Jan 1, 2006

  • SME-ICGCM
    A Case Study of Longwall Roof-Supports Interaction

    By Y. H. Wang

    During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research

    Jan 1, 1986

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    J?Crete: An Engineered Cementitious Composite Rock Coating

    By Alan A. Campoli

    The mining industry has long been searching for an effective structural application that prevents weathering and falls of loose rock, debris, and sediment. J-Crete is a fiber-reinforced, engineered, c

    Jan 1, 2012

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts

    By Michael Alber

    Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control

    Jan 1, 2006

  • SME-ICGCM
    Global Trends in Coal Mine Horizontal Stress Measurements

    By Christopher Mark

    Knowledge of in situ stresses is fundamental to many studies in earth sciences, and coal mine ground control is no exception. During the past 20 years, it has become clear that horizontal stress is

    Jan 1, 2008

  • SME-ICGCM
    Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem Simulation

    By D. Su

    This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline

    Jan 1, 1990

  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • SME-ICGCM
    A Simple Tool to Measure Stress in Mine Backfill

    By A. MacG. Robertson

    A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro

    Jan 1, 1986