Large-scale infrastructure projects. Application of rock mechanics in geotechnical engineering to avoid delays in constrution time and increases of costs—case studies
By W. Wittke
SUMMARY: Geotechnical problems often lead to an increase of construction time and costs for large highway and railway projects. Some reasons, which have led to failures and thus to a delay of construc
Jan 1, 2003
-
Practices And Initiatives To Transfer Simrac Developed Technologies To Its Stakeholders And Other Parties
By P. van der Heever
The genesis of Simrac?s technology transfer practices and future initiatives are discussed in this report. Simrac produces a relatively large volume of research-based health and safety outputs that mu
Jan 1, 2002
-
Intelligent Gearing System - Solution To Understand And Correct Operational Conditions That Reduce he Fatigue Life Of A Girth Gear
By David Brown, Dirk van Dyk
Horizontal rotating mills are being used all over the world associated with different mineral and power generation industries. David Brown South Africa, with over 140 years of experience in gear manuf
Jan 1, 2007
-
Evaluation of some physical and mechanical properties of rocks using ultrasonic pulse technique and presenting equations between dynamic and static elastic constants
By A. Fahimifar, H. Soroush
Abstract: In order to develop non-destructive methods in studying physical and mechanical properties of rock and replacing them with difficult and expensive static methods, several ultrasonic tests we
Jan 1, 2003
-
High-Wall Control At Anglo Gold Ashanti, Navachab Mine (2dbbeb3c-3655-4c5f-9dba-7c00ed466556)
By André de Jager, Henk Ludik
Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blastin
Jan 1, 2006
-
Approaches To Improve Safety And Recover Lost Productivities In Vertical Shaft Sinking By Making Use Of Industrial Engineering And Risk Driven 3-D Modelling Techniques - 1. Synopsis
By T. E. Wakefield
Over several decades in Southern Africa the advance rates when sinking vertical shafts have declined significantly. The upside has been a substantial improvement in shaft bottom conditions and a comm
Jan 1, 2009
-
Research In Pyrometallurgy At The University Of Pretoria, 1980-2005
Keywords: Pyrometallurgy, Pretoria University Substantial research in pyrometallurgy at the University of Pretoria started in 1980 with the appointment of Rian Dippenaar to the Iscor Chair, a posi
Jan 1, 2006
-
The Impact Of The Draft Mineral And Petroleum Resources Royalty Bill On Gold Mine Reserves (7126a81e-7d07-4922-8a31-925a1ca29865)
The latest Draft MPRRB was released for public comment in October 2006. The main purpose of the Bill is to collect royalties at mines developed in terms of new-order mineral rights granted through th
Jan 1, 2007
-
Manufacturing Of Anhydrous Zirconium Tetrafluoride In A Batch Reactor From Plasma-Dissociated Zircon And Ammonium Bifluoride - Synopsis
By M. M. Makhofane
Anhydrous zirconium tetrafluoride can be used as a precursor for the manufacturing of nuclear-grade zirconium metal. This can be done by fluorinating plasma-dissociated zircon with ammonium bifluoride
Jan 1, 2012
-
Kinetics And Thermodynamic Parameters For The Manufacturing Of Anhydrous Zirconium Tetrafluoride With Ammonium Acid Fluoride As Fluorinating Agent ? Synopsis
By C. J. Pretorius
More than 30 percent of the global demand for zircon (ZrSi04) is supplied by South Africa. A significant amount of the zircon is exported, and beneficiated products are then imported for industrial ap
Jan 1, 2012
-
Development, Installation, and Operation of a Full-Copper, Deep-Cooled Slag Tapblock for a Six-in-Line Copper Matte Settling Electric Furnace
By T. Mwanza, B. N. Belford, P. Conradie
"Metix has introduced a three-piece ’deep-cooled’ copper slag tapblock into a six in-line copper matte settling electric furnace. The tapblock was designed without any internal refractory; it relies p
Jun 1, 2019
-
Mechanical–transport processes in salt: consequences for abandonment of underground exploitations
By M. Ghoreychi, X. Daupley
ABSTRACT: The paper is devoted to two major aspects related to the abandonment of salt mines: 1)- Long-term risk associated with the mechanical instability of surface and its consequences for public s
Jan 1, 2003
-
The Corrosivity Regions Of Southern Africa ? Long Term Trends And Implications For Materials Selection - 1. Introduction
By John E. Leitch
The cost of corrosion as measured by such cost components as the renovation or replacement of coated steel, or the use of expensive coating systems on steel, is considerable. Extrapolating from figur
Jan 1, 2006
-
PlanIt–OPTIM: An optimal mine planning system for large underground mining corporations
By F. Terblanche, M. Holton, A. Kruger
The paper presents an optimal mine planning system designed to simultaneously optimize all the underground mines of large South African gold and platinum mining corporations. The system, code name
Jan 1, 2003
-
DOHEMS®?technology to improve risk assessments and early detection - Synopsis
By C. J. Badenhorst
The scope of this project was to research, develop and eventually produce a personal occupational hygiene and safety exposure monitor system to assist in recording and analysing various stress factors
Jan 1, 2010
-
Mineralogical Solutions For Pyrometallurgical Problems
By L. Andrews
Keywords: mineralogy, phase-chemical, chemical-looping combustion, XRD, SEM, EDS, QEMSCAN, PGM, slag, matte, ilmenite Mineralogy, traditionally associated with concentrator studies, is being incre
Jan 1, 2011
-
A Review Of Undergraduate Teaching And Postgraduate Research In Pyrometallurgy At The University Of Stellenbosch
Keywords: Stellenbosch, university, teaching, research The pyrometallurgical activities at Stellenbosch University are reviewed in this paper. The history of the activities, both in teaching and r
Jan 1, 2006
-
Production Reconciliation of a Multivariate Uniform Conditioning Technique for Mineral Resource Modelling of a Porphyry Copper Gold Deposit
The paper provides a brief review of a multivariate uniform conditioning and a localized multivariate uniform conditioning (LMUC) technique, and presents a production reconciliation case study based o
Jan 1, 2014
-
New Developments On Mine Planning And Grade Control At Sishen Iron Ore Mine
By D. J. Steynfaard
Sishen Iron Ore Mine is situated 280 km north-west of Kimberley in the Northern Cape Province of South Africa. The mine produces and sells high quality iron ore of various specifications to various na
Jan 1, 2003
-
Annual Mine Planning And Execution Buffering - A Safety Imperative ? Synopsis
By R. C. D. Phillis
The annual mine planning process is one of the most important tactical/operational steps towards achieving strategic goals. These tactical plans are part of a very comprehensive Mineral Resource Manag