Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Careful Blasting in Greenland A Case Story of 4 Major Blasting Projects 1986-88

    By Erik K. Lauritzen, Jorgen Schneider, Niels Madsen

    From 1986 to 1988 Kalaallit Tunisassiorfiat (KTU)/Gronlands Hjemmestyres Produktionsvirksomhed (the part of Greenland's own governing body which is in charge of production activities) has been respons

    Jan 1, 1989

  • ISEE
    Regulating the Velocity of Detonation of ANFO Utilizing Blends of Non-Explosive Materials

    By Michael E. Curtis

    This paper outlines a study performed to analyze the advantages of utilizing a blasting agent with a velocity of detonation that is 1.3 to 1.4 times the P-wave velocity of sedimentary shales and sands

    Jan 1, 1997

  • ISEE
    Data Flow Through the Blasting Process

    By Christoph Muller, Geoffrey Liggins, Mohan Hensman

    Modern commercial blasting is as much a technical process as it is a business one. As with most processes both aspects of blasting are driven by and generate new data. The time-critical nature of comm

    Jan 1, 2010

  • ISEE
    Blast Vibration Monitoring, Prediction and Control at Old Cliffe Hill Quarry

    By Rob Farnfield, Mark Pegden

    Old Cliffe Hill quarry produces between 4 and 5 million tonnes of crushed granite per year and is located in the county of Leicestershire in the East Midlands region of England. Blasting is carried ou

    Jan 1, 2010

  • ISEE
    "Journal: 100 Years / Keysone National Powder Company, Catalog 1912"

    By Robert Hopler

    THE KEYSTONE NATIONAL POWDER COMPANY is an Independent organization, incorporated under the laws of the State of Pennsylvania. It has three dynamite mills near Emporium, Pa., with a daily capacity of

    Jan 1, 2013

  • ISEE
    Contour Blasting in Tunneling: the Role of Drilling Precision

    By Mauro Fornaro, Marilena Cardu, Renato Mancini, Daniele Castano

    Tunneling by explosive blasting in civil works isn't merely intended to break somehow a way through the rock, rather to drive a permanent, constant cross section, lined way. The current mechanical exc

    Jan 1, 1992

  • ISEE
    The Effects of Stemming Consist on Retention in Blastholes

    By Jim Davis, Calvin J. Konya

    The methods used to confine the gases within a borehole can influence the amount of useful energy obtained from the explosive charge. Improper confinement not only wastes energy and raises cost but al

    Jan 1, 1978

  • ISEE
    A Mid-Town Crash

    By Virgil L. Lewis

    On September 7, 1994, a Burlington Northern coal train crashed into a parked train in the downtown Gillette, Wyoming rail yard. I would like to address two issues in regards to this accident. One, a s

    Jan 1, 1996

  • ISEE
    New Underground Drilling, Blasting and Mining Methods at the Manic-5 Additional-Power Hydro-Electric Project

    By M Sampara, W Comeau

    The introduction of large-diameter holes to underground mining has made possible the development of new mining methods such as the Vertical Crater Retreat (V.C.R.) method. It is not only the safest un

    Jan 1, 1981

  • ISEE
    Vertical Crater Retreat Mining. At the Luossavaara Research Mine

    By Bengt Niklasson

    "A test stope at the Luossavaara Research Mine in Kiruna, Sweden,was divided into four different modules in which various hole patterns and explosives were tested in order to evaluate:1. The optimum c

    Jan 1, 1985

  • ISEE
    Close-In Blasting at Cornell

    By Jeff Yaro, Steven P. Case, Carl Kish

    This project involved the construction of a new 4-story library on the campus of Cornell University in Ithaca, New York. The new building was constructed completely below grade, adjoining several of t

    Jan 1, 1992

  • ISEE
    Pinkerton Tunnel Open Cut Project

    By Dale L. Ramsey

    The Pinkerton Tunnel Open Cut Project is part of the National Gateway Clearance Initiative improvement project to achieve a minimum of 6.4 meters (21 feet) of vertical clearance along CSX Transportati

    Jan 1, 2014

  • ISEE
    Drill and Blast Digitalization

    By Ricardo Dr. Chavez, Mathieu Lachamp, Rob Dr. Farnfield

    Pueblo Viejo is an open pit gold mine in the Dominican Republic which is always looking forward to implement the newest technology in the industry to improve all processes. Focusing on one of the pill

    Jan 1, 2019

  • ISEE
    Detonation of Non-Electric Initiation Systems Across an Air Gap

    By B. Winterberg, C. Lewis, M. Starkel, C. Johnson

    Non-electric systems, specifically shock tube, have become the pyrotechnic detonator of choice over electric due to their safety regarding accidental initiation from stray radio signals. Typically, th

    Jan 1, 2024

  • ISEE
    An Unusual Accident Re-created

    By James Stuart

    A man died when the primed charge he was holding against his chest exploded. He was doing legitimate explosive work, and he was following all the safety procedures he had been taught. He and his colle

    Jan 1, 2007

  • ISEE
    Journal: Old South Pole Demolition

    By John Horgan, Ethan Marcoux

    Explosives have been used to demolish many unsafe structures around the world. However, it is unlikely any demolition job has ever involved destroying buildings already buried 40 feet (12 meters) into

    Jan 1, 2015

  • ISEE
    Traffic Tunnels in Rock - Guide Levels for Blast-Induced Vibrations

    By Sven-Erik Johansson, Gosta Rundqvist, Donald Jonson

    In Stockholm a new road traffic system called Södra Länken (Southern Link) will be in operation in late 2004. The total length of the road system is 6 kilometres of which 4,5 kilometres run through tu

    Jan 1, 2004

  • ISEE
    Limestone Fragmentation Case Study Using Regular Rhythmic Timing

    By Tristan Worsey, Jhon Silva

    The paper discusses a limestone quarry case study that looks at change in fragmentation due to using different charge sequences when using the regular rhythmic timing method.

    Feb 1, 2020

  • ISEE
    New Variables for Rock Fragmentation Management

    By Rafael Tadeu Pinto e Moura, Giorgio De Tomi, Jacopo Seccatore

    This paper describes a research and development project in an open-cast mine with the goal to achieve an average P80 of 300 mm (11,8”) in the run-of-mine (ROM) product without altering the existing bu

    Jan 1, 2015

  • ISEE
    The Science of Blasting

    By Andrew Ritter, Victor I. Montenyohl, Stephen R. Winzer

    Thirty-seven open pit production blasting operations have been monitored using high-speed cameras running between 500 and 7000 frames per second. Analysis of the resulting films reveals irregularities

    Jan 1, 1979