Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    Influence of the Interaction of Open Pit and Underground Mining Blasting

    By Darío Innamorati, Jorge Oliva

    Cerro Vanguardia is a known gold and silver deposit located in the province of Santa Cruz, Argentina. The mine has been in operation since 1998 and is thought to be one of the most important mines in

    Jan 21, 2025

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    The Importance of Proper Seismometer Coupling

    By Randy Wheeler

    In recent years the issue of seismograph calibration and accuracy has been a major focal point of the ISEE Blast Vibration and Seismograph Section. In fact, questions concerning the consistency and re

    Jan 1, 2004

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Controlled Hard Rock Trench Blasting Close to a Buried Gas Pipeline under Pressure

    By M. Ganster

    Austria’s biggest supplier of oil and gas, transports gas through the West Austria Gasline for domestic consumption. In addition, the OMV also works as gas carrier and ensures the transit into neighbo

    Jan 1, 2010

  • ISEE
    Excavation of Rock by Non-Explosive Method at Queen Mary Hospital, Hong Kong

    By Guy Bridges

    Site formation works requiring excavation of rock at the Queen Mary Hospital redevelopment site was restricted due to extremely low ground vibration limits. Non-Explosive excavation method called Elec

    Feb 1, 2020

  • ISEE
    Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By Mick Lownds, Ruilin Yang

    The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a

    Jan 1, 2011

  • ISEE
    Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.

    By Ambrose Buchanan, Rob Farnfield, Charles Adcock

    Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev

    Jan 1, 2011

  • ISEE
    Shock Tube Detonator Shelf Life in Relation to Timing Accuracy

    By Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey

    Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used

    Jan 1, 2013

  • ISEE
    Initial Testing of a Speed of Sound Test Apparatus for Powdered Explosives

    By Barbara Rutter, Shonn Kevin McNeil

    "This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto

    Jan 1, 2017

  • ISEE
    Debris Directionality Comparison: Full Scale Tests to Q/D and QRA

    By Lon Santis, Bill Evans, John Tatom

    Debris data from the Department of Defense Explosives Safety Board’s Project ESKIMORE full-scale explosives event test program are compared to quantity-distance (Q/D) standards and quantitative risk a

    Jan 1, 2015

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013

  • ISEE
    The Smart Application of Explosives for Drill to Mill (D2M) Optimization

    By J. Silva, M. Kotraba, F. Pontanilla

    Blasting is the application of highly complex science that, in some cases, could be viewed as an art. Many variables are involved in a blast, including geology, pattern design, timing and firing seque

    Jan 1, 2024

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

    Feb 1, 2020