Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                     New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f) New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)By R. Bruce Patterson The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H Jan 1, 2004 
- 
                     Pile Load Tests Pile Load TestsCase I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri Jan 1, 1988 
- 
                     Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California Hillside Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California HillsideBy Patrick O. Shires, Harry W. Schnabel With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg Jan 1, 2018 
- 
                     Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili Jan 1, 2007 
- 
                     FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e Jan 1, 2018 
- 
                     Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading Behavior Of Step Tapered Bored Piles In Sand Under Axial LoadingBy Nabil F. Ismael The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al Jan 1, 2008 
- 
                     Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations. Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.By Theo. A. M. Salet The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a Jan 1, 2006 
- 
                     Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay Bridge Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay BridgeBy W. Robert Thompson Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc Jan 1, 2009 
- 
                     Resonance Test On Piles - Synopsis Resonance Test On Piles - SynopsisBy Y. Z. Xu This paper presents a new dynamic method called Resonant Pile Test (HPT) for evaluating bearing capacity of pile. The basic conception of RPT is given in brief and the measuring system is also introdu Jan 1, 2010 
- 
                     Practical Experiences On Pile Dynamic Measurement In Shanghai - Synopsis Practical Experiences On Pile Dynamic Measurement In Shanghai - SynopsisBy J. Pei The studies of dynamic measurements using stress wave theory has commenced in China. This paper introduces some practical experiences using "CASE method" in Shanghai showing applications of dynamic me Jan 1, 2010 
- 
                     Load Test On A Model Pile Driven Into Sand ? Summary Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand. Jan 1, 2010 
- 
                     Kinematic Response Characteristics of a Piled Raft Foundation Kinematic Response Characteristics of a Piled Raft FoundationBy Ramon Varghese, A. Boominathan, Subhadeep Banerjee Pile raft foundation system has been accepted as an economic foundation design for high rises and heavily loaded structures. Seismic response analysis of PR foundation systems involves complex pile-so Jan 1, 2018 
- 
                     New Technology of Force Monitoring of Post-Tensioning Ground Anchors New Technology of Force Monitoring of Post-Tensioning Ground AnchorsBy Shahid Islam, Lucian Bogdan There is a rapid expansion of world’s infrastructure and simultaneously existing infrastructure is aging. The maintenance of infrastructures has been of particular concern to the engineering community Jan 1, 2018 
- 
                     A New Approach To Estimate The Base Bearing Capacity Of Driven Piles Based On SPT Data A New Approach To Estimate The Base Bearing Capacity Of Driven Piles Based On SPT DataBy N. Shariatmadari In recent years, determining bearing capacity of piles from in-situ testing data as a complement of static and dynamic analysis has been used by geotechnical engineers. In this paper, different approa Jan 1, 2006 
- 
                     Drilled Piers With Base Preloading By Grouting - 1. Introduction Drilled Piers With Base Preloading By Grouting - 1. IntroductionBy Boleslaw A. Klosinski Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile Jan 1, 1995 
- 
                     Stub Pier Stabilization Performance Stub Pier Stabilization PerformanceBy Swaminathan Srinivasan, Jess A. Schroeder "Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer Jan 1, 2017 
- 
                     Development of Site-Specific Acceleration Response Spectra fora Liquefiable Bridge Site Development of Site-Specific Acceleration Response Spectra fora Liquefiable Bridge SiteBy S. Ali Bastani, Ashley Varni Design acceleration response spectra (ARS) are directly correlated with dynamic forces and estimated dynamic bridge displacements, which make them a critical aspect of dynamic bridge design. Nonlinear Jan 1, 2018 
- 
                     Bearing Capacity Of Piles Determined By Field Tests ? Synopsis Bearing Capacity Of Piles Determined By Field Tests ? SynopsisBy D. M. Milovic On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone Jan 1, 2010 
- 
                     Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part I: GEC, AUGEO & CFA Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part I: GEC, AUGEO & CFABy Ali Porbaha In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction. Jan 1, 2002 
- 
                     Design Approaches for Externally Supported Earth Retaining Systems – Details and Limitations Design Approaches for Externally Supported Earth Retaining Systems – Details and LimitationsBy Matteo Montesi Deep foundation elements are often used as discrete elements in externally supported earth retaining structures such as soldier piles and lagging walls, secant/tangent pile walls, anchored walls, etc. Jan 1, 2018 
