Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary

    By Roy A. Bell

    A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet

    Jan 1, 1997

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994

  • DFI
    Underpinning The Existing No. 1 Subway Line At The World Trade Center

    By Richard Crockford

    The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne

    Jan 1, 2008

  • DFI
    A Tale of Two Dams: Performance of Deep Cutoff Walls

    By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders

    "This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv

    Jan 1, 2017

  • DFI
    The Advantages Of Arbitration - I. Arbitration Defined

    By John B. Tieder

    Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir

    Jan 1, 1988

  • DFI
    Drilled Shaft Difficulties and a Micropile Solution

    By Jeff Jackson, Paul Axtell, David Graham

    The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were

    Jan 1, 2018

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • DFI
    Overcoming the Challenges Endured by the Quality Assurance and Quality Control Teams during the Construction of a Deep Cutoff Wall in East Alton, Illinois

    By Raffaella Granata, Wesley Schmutzler, Matteo Bertoni

    "The Lower Wood River Levee system, at the confluence of the Wood River Creek and the Mississippi River, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation wa

    Jan 1, 2017

  • DFI
    Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary

    By William D. Spielvogel

    The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t

    Jan 1, 1994

  • DFI
    Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?

    By Bernard Hertlein

    ¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser

    Jan 1, 2001

  • DFI
    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018

  • DFI
    Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis

    By H. Meseck

    Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr

    Jan 1, 2010

  • DFI
    Pore Water Pressure Response and Effect on Installation Torque of Large Diameter Helical Piles in Soft Soils

    By Howard A. Perko, M. Mae Benvenga, Heather H. Trantham

    Displacement of soil and groundwater during helical pile installation can produce excess pore water pressures (PWP) in fine-grained soils. Pore water pressure reduces effective stress in the soil imme

    Jan 1, 2018

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • DFI
  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    Compressive Behaviour of Hollow Core Micropiles in Cohesive Soil

    By M. Hesham El Naggar, Osama F. E. Drbe

    "Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio

    Jan 1, 2014

  • DFI
    Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, Alaska

    By Mohammed Sakr

    The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development

    Jan 1, 2009