Pile Construction And Related Problems ? SynopsisBy K. Fujita
In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,
Jan 1, 2010
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008
-
Comparison of Non-Destructive Integrity Tests on Experimental Drilled ShaftsBy Armin W. Stuedlein, Jim Zammataro, Bernie Hertlein, Daniel Belardo, Qiang Li, Antonio Marinucci
"An experimental program focusing on four drilled shafts was conducted to determine the effect of high strength steel reinforcement bars on lateral resistance, steel casing on axial and lateral resist
Jan 1, 2016
-
Hammer-Grout Piles At The Bronx-Whitestone BridgeBy Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special ApplicationBy Andhra Pradesh, Nagarajkumar B. V
As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad
Sep 1, 2022
-
Performance Of Drilled Displacement Piles In The Midwestern United StatesBy W. Morgan NeSmith
Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp
Jan 1, 2009
-
Ultimate Lateral Load of a Pile in Cohesive Soil under Static LoadingBy Dileej M. Dewaikar, Poonam A. Patil
"In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met
Jan 1, 2005
-
Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a WetlandBy Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian
"Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2
Jan 1, 2017
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung
"Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt
Jan 1, 2017
-
Helical Piles Performance In Golestan Loess Deposits Via Fullscale And Physical Modeling TestingsBy Abolfazl Eslami, Fatemeh Rostami, Sara Heidarie Golafzani, Mohammad Arabameri
Collapsible loess is classified as problematic soil found in most continents. The loess immediately collapses under stresses induced by axial compressive loading or the soil weight when exposed to moi
Oct 1, 2022
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Slope Stabilization of Mill Creek Landslide Using Steel H-PilesBy Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Preliminary Assessment of Reliability and Sampling Requirements for Deep Mixing Method (DMM) Foundations for LNG Processing Facility and Storage Tank (52fd79c3-58e2-4970-9b21-5f8e12930105)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Attasit Korchaiyapruk, Edward C. Clukey
"A deep mixing method (DMM) foundation was selected by the Project Team for a very large LNG facility in West Africa. As described in a companion paper, this foundation consists of a large number of c
Jan 1, 2017
-
Sheet Piling Bridge AbutmentsBy Robert J. Carle
This paper reviews a variety of highway structures which have been built using steel sheet piling as the permanent structural elements of bridge piers, abutments and wingwalls. Those structures built
Jan 1, 1989
-
Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground FloorsBy Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo
Jan 1, 2002
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket DesignBy S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff ClaysBy Alexander Scheuermann, Martin D. Larisch, David J. Williams
"Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den
Jan 1, 1900
-
The Effects Of Heating And Cooling Energy Piles Under Working Load At Lambeth College, UKBy Tony Amis
There is very limited information relating to the potential impact of temperature cycles, outside the variation that occurs naturally, on the behaviour of foundation piles. Such thermal loading occurs
Jan 1, 2008