Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Metallurgical Testwork on Harmony Project Ore

    By K. Gie Tan, Frank Wright

    "Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res

    Jan 1, 2000

  • CIM
    Stabilité Géotechnique Des Ouvrages De Retenue Pour Les Résidus Miniers: Problèmes Persistants Et Méthodes De Contrôle

    By Michel Aubertin

    Les digues de retenue de résidus miniers devraient être conçues de façon à supporter les charges les plus défavorables qui puissent être anticipées. Les nombreux incidents survenus au cours des derniè

    Nov 1, 2002

  • CIM
    Numerical Modeling Simulations of Spray-On Liners Support Potential in Highly Stressed and Rockburst Prone Rock Conditions

    By A. P. E. Dirige

    Extensive field study has been performed to assess the capabilities of thin sprayon liners (TSLs) and conventional spray-on support systems for preventing rock and support material damage that often r

    May 1, 2009

  • CIM
    Multiparameter Petrophysical Characterization of an Orebody: An Exploration Case History

    By E. Bongajum

    We present results from petrophysical studies to characterize a Zn-Pb-Ag deposit in Nash Creek, New Brunswick. The measurements are part of an integrated study that includes geological and geophysical

    May 1, 2009

  • CIM
    Recovery of Uranium and the Lanthanides from Phosphate Rock

    By Fathi Habashi

    "A process is proposed for the treatment of phosphate rock for the recovery of uranium and the lanthanides. The process assures the production of phosphatic fertilizers without polluting the environme

    Jan 1, 1997

  • CIM
    Twelve Technology Tools to Design and Optimise the Production Chain from Resource to Product

    By Rob Morrison, Peter Cameron

    "Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are

    Jan 1, 2003

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    White Pass and Yukon Route

    By C. J. Brown

    "Access to the outside world is supplied by the Alaska Highway to continental Canada and the United States, the Haines Highway, and by the White Pass & Yukon Route to Skagway and Vancouver. Communitie

    Jan 1, 1973

  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975

  • CIM
    Mine Reclamation in a Changing Regulatory Environment

    By David H. Searle

    This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well

    May 1, 2006

  • CIM
    Frozen Lump Generation of Oil Sands ? Climatic Challenges and Solutions

    By Derek J. Cyr

    Climate has an immense impact on the properties of Athabasca oil sands and the ease or difficulty with which it is excavated and extracted. During the winter months, exposed oil sands surfaces freeze.

    May 1, 2004

  • CIM
    Beneficiation of Marine Sands from Les Iles-De-La-Madeleine

    By Alain Dorval

    "''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos

    Jan 1, 1994

  • CIM
    Effective Methods of Arsenic Removal from Gold Mine Wastes

    By J. Lee, R. G. Rosehart

    "The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a

    Jan 1, 1972

  • CIM
    A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery Process

    By I. G. Townsend, S. A. Buckley, C. I. House

    "SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff

    Jan 1, 1989

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    The Star Lake Mill a Low Cost Success Story

    By Doug Smith, Ross MacFarlane

    "The Star Lake Mill was commissioned by Cameco (formerly Saskatchewan Mining Development Corporation) in 1986 to process a small high grade gold deposit in a remote location of Northern Saskatchewan.

    Jan 1, 1989

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003