Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Economic and Environmental Case for Re-processing Gold Tailings in South AfricaBy James A. Brown, Marius Botha, Christopher A. Fleming
"The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig
Jan 1, 2010
-
Freeport McMoran El Paso Refinery Steam ControlBy Bradford C. Wesstrom, Ricardo Parra
The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at
Jan 1, 2019
-
Treatment of Gold Mill Effluents with Hydrogen Peroxide: Operating Experience and CostsBy A. Griffiths, G. Vickell
"INTRODUCTIONA successful cyanide destruction process has to ensure environmental compliance at reasonable cost. That this is possible with hydrogen peroxide is shown by the fact that over twenty gold
Jan 1, 1989
-
Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera EscondidaBy H. E. Urtubia, C. W. Bailey
"BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L
Jan 1, 2007
-
Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)By T. G. Joseph
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
Nov 1, 2011
-
Cut off Grade Optimizer Integrating Contaminant ConstraintsBy Sebastián H. Troncoso
Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block
Oct 1, 2009
-
The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport PipelinesBy D. Wolfe, K. Reid, T. Nunn
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug
Jan 1, 2014
-
A Plant-Wide Control System for Flotation Level ControlBy D. G. Hulbert, J. H. Schubert, R. G. D. Henning
"Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever
Jan 1, 1995
-
New Developments in Process Mineralogy of Platinum-Bearing OresBy Louis J. Cabri
"Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum
Jan 1, 2004
-
LNG Fuelling for Mine TrucksBy Brad E. Melanson
Because mine haul trucks consume considerable quantities of fuel, they are ideal candidates for the adoption of cleaner and cheaper fuels like natural gas. Impressive fuel cost savings will be realize
May 1, 2006
-
System Analysis and Simulation of Narrow Vein Mining Method with Underground Pre-concentrationBy Mario Morin
The application of underground pre-concentration technology to narrow vein mining has the potential to change the entire economics of bulk mining methods when used in narrow vein situations. The rejec
Oct 1, 2004
-
Estimation of liberationBy T. Yalcin
"This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,
Jan 1, 1985
-
Expert Systems Implementation at Peñoles Group ConcentratorsBy Ramón Alanís, Filiberto Orrante, Andrea Festa, Baldomero Gutiérrez, Fernando Cornejo
"SGS implemented two rules-based fuzzy logic expert applications on two grinding circuits operated by Peñoles Group in Mexico. Both expert systems are based on control strategies that push against pro
Jan 1, 2009
-
Concepts for Co-Mixing Waste Rock and TailingsConventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.
Nov 1, 2002
-
Factors Affecting the Dissolution of Gold from Refractory Flotation TailingsBy H. U. Ross
"INTRODUCTION Extensive studies have been carried on pure gold to determine the various factors that affect its dissolution in alkaline cyanide solutions. With the extension of milling to refractory o
Jan 1, 1973
-
Environmental Relevance of the Leachate Potential for Dry Storage of Delayed CokeBy Joseph L. Fournier
Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading
May 1, 2011
-
Engaging First Nations CommunitiesBy Glenn K. Nolan
"Today, more than any other time in recent history, aboriginal communities are looking for ways to be understood as more resource development companies continue to explore and develop Canada's vast re
Jan 1, 2008
-
Evaluation of Environmentally Friendly Collectors for Xanthate ReplacementBy J. Dong
"Xanthate is a sulfide collector that has been widely used in flotation for almost a century. It is inexpensive, easy to synthesize and apply, and produces good metallurgy in the right applications. H
Jan 1, 2011
-
Standardization of Data Formats as Basis for Future Efficient Mine ProductionBy Christoph Mueller
Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro
May 1, 2002
-
The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett
"Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M
Jan 1, 2003