Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Outotec Pressure Oxidation - More out of Sulfide Ore

    By J Tiihonen, J OÆCallaghan, T Haakana

    Outotec is today capable of providing technologies, process equipment and engineering for the construction of pressure oxidation leaching (POX) plants in any location in the world. Outotec works with

    Sep 26, 2013

  • AUSIMM
    Use of a Modified Comminution Index to Predict Bond Work Index and SMC A*b at the Antamina Mine, Peru

    By T Kojovic, S J. Windle, J Sullivan

    "The Geometallurgical Mapping and Mine Modelling (GeM) comminution index (CI) was developed as part of the AMIRA P843 GeMIII project. Drill core geochemistry samples were passed through a Boyd Crusher

    Jun 15, 2016

  • AUSIMM
    Lack of Alignment between Regulation of Surface Water Management in Coal Mining and Coal Seam Gas

    By E Coffison, M Gibbs, C Bennett

    The sustainable management of surface water associated with coal mining and coal seam gas projects is a considerable factor affecting the global competitiveness of these resource companies operating i

    Nov 26, 2013

  • AUSIMM
    Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in China

    By S Zheng, Y Zhang, Z Wen, S Ma

    Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause

    Jul 10, 2012

  • AUSIMM
    Treatment Plant Innovation at Garden Well

    By W T. C Kendall, H D. Ngo

    Garden Well is a shear-hosted Archaean orogenic gold deposit located 100 km north of Laverton, Western Australia. The Garden Well processing plant is designed for a nominal 491 t/h milling rate and an

    Sep 26, 2013

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines (81971fc4-4a86-4ab3-9271-1e5b157046a8)

    By Yucheng H, Baogui Y, Wenyong L

    High-water rapid-solidifying material, called 'high-water material', is a new material developed by the authors over many years. The material can solidify nine times its volume of water in

    Jan 1, 1998

  • AUSIMM
    Effect of liquefaction controlling components in carbon-free mould powder for the continuous casting of ultra-low carbon steels

    By N Gruber

    In the continuous casting of ultralow carbon (ULC) steels, free carbon is used to control the melting behaviour of mould powders. If the carbon is not completely removed during melting, it is enriched

    Jun 19, 2024

  • AUSIMM
    The Modernisation and Upgradeáof Concentrator Operations at the Chelopech Mine, Bulgaria - Design, Installation and Operation of the 250 tonnes per hour Comminution Circuit

    By K Evtiminova, G Jobson, M Nolte, S Meik

    Chelopech Mining EAD (CMEAD) is a wholly owned subsidiary of Dundee Precious Metals Inc (DPM) and operates the Chelopech underground mine and processing facility located in Bulgaria. The final product

    Oct 29, 2012

  • AUSIMM
    Cleaner circuit optimisation at Cadia Operations

    By J Seppelt, B Akerstrom, J Bubnich, D Seaman, T Waters

    The Cadia Hill concentrator at Newcrest’s Cadia Operations has undergone several modifications and upgrades to treat an increased throughput rate of harder ore from the Cadia East block cave mine.Subs

    Aug 29, 2018

  • AUSIMM
    Dilution rating system (DRS)

    By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers

    Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec

    Mar 15, 2021

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Discovery of the Johnston Range Gold Deposits by Reconnaisance Multi-Element Laterite Geochemistry

    By Brigden J. F, Birrell

    A regional geochemical exploration programme commenced in July 1983, based upon low-density sampling of lateritic duricrust over parts of the Yilgarn Block of Western Australia. This resulted in r

    Jan 1, 1988

  • AUSIMM
    Potential Future Ore Discovery At The Zinc Corporation Limited And New Broken Hill Consolidated Limited Mines At Broken Hill

    By Booth S. A, Milton D. W

    Stratabound/stratiform and remobilised mineralisation have been recognised as the two dominant styles of mineralisation which constitute the Broken Hill ore deposit. Recognition of prospective sit

    Jan 1, 1983

  • AUSIMM
    Diamonds Overview

    By Smith C. B

    Major diamond pipes discovered in Western Australia in the late-1970s exhibited a number of unique features that not only resulted in Australia becoming the largest diamond producer in the world in

    Jan 1, 1988

  • AUSIMM
    Deportment of Gold in Sulfide Ores and Implications for Gold Extraction

    By J Zhou

    Gold in sulfide ores is associated predominantly with sulfide minerals and occurs as both microscopic and submicroscopic particles. In non-refractory sulfide ores, gold occurs mainly as coarse- and me

    Sep 26, 2013

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Towards an understanding of production costs at Australia’s underground gold mines

    By A Trench, S Ulrich, S Hagemann

    A synthesis of reported All-In Sustaining Costs (AISC) for 57 Australian gold mines in the period 2014–2016 reveals for the first time the clear influence of grade upon cost performance, most evident

    Oct 16, 2017

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • AUSIMM
    Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter Monitoring

    By H W. Wu, T Harvey

    An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th

    Jan 1, 2008