Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The evolution of the Cadia 40-foot SAG mill to treat the Cadia East orebody: a case study of incremental change leading to operational stability

    By J Seppelt, B Akerstrom, A Rice, J Bubnich, T Waters

    The Concentrator 1 plant at Cadia transitioned from Cadia Hill open pit to the Cadia East block cave ore body in 2013. As a result of this change, major plant upgrades were required to achieve the des

    Aug 29, 2018

  • AUSIMM
    The Wapolu gold deposit, Papua New Guinea: discovery to development

    Gold mineralisation was first noted in 1983 at the Wapolu Point area of Fergusson Island, Papua New Guinea (PNG) during a follow-up regional reconnaissance program. Subsequent exploration programs thr

    Jan 1, 1994

  • AUSIMM
    Mount Carlton comminution circuit design, start-up and optimisation

    By B Putland, I Lovatt, D Schwann, A Cervillin

    The Mount Carlton project in Queensland's North East sits on a high-sulphidation epithermal style deposit rich in gold, copper and silver. Mt Carlton is an open pit mining operation with ore proce

    Aug 29, 2018

  • AUSIMM
    Barium Dispersion in Drainage Sediments in Arid Climatic Regimes

    By Bush P. R, Hale M, Dixon C. J, Wheatley M. R

    Barium anomalies in drainage sediments can act as indicators of barite mineralization and path- finders for lead-zinc mineralization. Their detection in an arid climate has been investigated in t

    Jan 1, 1988

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • AUSIMM
    Bio-oxidation Heaps and AMD from Waste Rock Dumps - The Importance of the Intrinsic Oxidation Rate

    By A I M Ritchie

    The pyrite oxidation rate is a process central to both the performance of bio-oxidation heaps, used in the pre-treatment of some refractory gold ores, and to the levels of pollution in acid rock dra

    Jan 1, 1994

  • AUSIMM
    Water Conservation at Construction Projects

    By B Hannah, M Uriarte, F Labarca, C Madore, G Ganapathi, L Martin, T Haase

    BechtelÆs Mining and Metals projects across the globe are executed in remote arid and semi-arid countries where providing even basic water supplies impose considerable challenges. Opportunities for wa

    Nov 26, 2013

  • AUSIMM
    Water Supply at the Warrego Mine, Tennant Creek, Northern Territory

    By G Ride

    The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in arid areas of Austra

    Jan 1, 1971

  • AUSIMM
    Coal Drying of Greenvale Nickel Lateritic Ore

    Nickel laterite approximately 40% of the remainder caning deposits. ores are the source of the world's nickel with from sulphide ore Although laterite ores are near the surface and cheap to

    Jan 1, 1987

  • AUSIMM
    Thiosulphate as an Alternative to Cyanide for Gold Processing ù Issues and Impediments

    By M G. Aylmore

    Thiosulphate is an attractive alternative reagent to cyanide for processing gold ores. It is relatively cheap and non-toxic, forms relatively strong gold and silver complexes, and readily leaches gold

    Jan 1, 2002

  • AUSIMM
    Recovery of Monazite from the Beach Sand Deposits of Eastern Australia

    By Blaskett K. S

    The physical properties of monazite and the minerals with which it is associated in east coast beach sands are studied and discussed. Possible means for improving recovery are examined. In particular,

    Jan 1, 1958

  • AUSIMM
    Bauxite Deposits of the Kimberley, Western Australia

    By Zani J. A, Jackson W. D

    Bauxite was discovered in the Kimberley in 1965 by an Amax field crew. Reserves of 230 million tons, of bauxite. averaging 47% total alumina on Mitchell Plateau and 980 million tons averaging 36%

    Jan 1, 1973

  • AUSIMM
    Economy in a basket: multi-purpose use of gabions at the Porgera Gold Mine

    By Thompson M

    The humble gabion basket is to mine development what the light bulb and safety pin are to eir-ryday life. Gabions provide a flexible, easy to assemble and cost efficient solution for "101" mine and ci

    Jan 1, 1994

  • AUSIMM
    Presidential Address, 1978 Disposing of the Mullock

    I feel a little like the Parson delivering his Sunday Sermon, chastizing his parishioners for not coming to Church. Those who need to hear me are absent.Nevertheless, I hope that if you agree with wha

    Jan 1, 1978

  • AUSIMM
    Sinking the New Broken Hill Consolidated Circular Airshaft

    The New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the

    Jan 1, 1940

  • AUSIMM
    Microorganisms in Flotation and Flocculation ù Future Technology or Laboratory Curiosity?

    By M Miettinen

    That microorganisms, both living and dead, and products derived from the organisms, can function as flotation agents and flocculation agents is abundantly clear. They can modify the surfaces of minera

    Jan 1, 2005

  • AUSIMM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimisation on a Milling Circuit

    By G T. Jemwa, F Rousseau, F J. Wolfaardt, J A. M Rademan, P W. Smit

    Mining companies are increasingly faced with the challenge of reducing operating costs while maximising throughput and profitability. At the same time, the grade and quality of treated ores are becomi

    Sep 26, 2013

  • AUSIMM
    A Microprocessor Based Information and Control System for Essential Services on a South African Gold Mine

    The application of cheap robust microprocessor based units to achieve monitoring and control in an underground mining environment is described. The functional layout of the programmable controller and

    Jan 1, 1985

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    Real-Time Image Analysis of Size and Shape Distributions of Rock Fragments

    An image analysis system has been built which automatically digitizes camera input of rock fragments, analyses the digitised data to determine the sizes and shapes of the rock fragments, and outputs

    Jan 1, 1988