Search Documents

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • SME
    Alternative Contracting Methods

    By John Reilly

    Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),

    Jan 1, 2007

  • DFI
    Prediction And Performance Of Drilled Shafts Constructed Under Slurry

    By Clyde N. Baker

    The paper describes procedures used to predict the settlement performance of drilled shafts constructed under slurry through water bearing deposits to a dense bearing strata, considering both side res

    Jan 1, 1991

  • SME
    Image Issues Could Hurt Canadian Oil Sands Plans

    While the United States and the rest of the world struggles with record-setting oil prices Canadian oil sands producers are ramping up production to meet demand for oil while also fighting against a h

    Jan 1, 2008

  • RMCMI
    A Few of the Adverse Conditions Encountered in Mining Coal in the Utah Field

    By J. B. Forrester

    In the operation of the coal mines in Utah few adverse conditions confront us. Physical conditions for the economical extraction of the coal are as near perfect as it is possible for them to be. Still

    Jan 1, 1921

  • SAIMM
    Optimization of mill performance by using online ball and pulp measurements - Synopsis

    By B. Clermont

    Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min

    Jan 1, 2010

  • NIOSH
    RI 3246 Smelting in the Lead Blast Furnace - Handling Zinciferous Charges. XIV.- Methods of Charging The Blast Furnace: Their Effect on Furnace Operation

    By G. L. Oldwright, Virgil Miller

    "The data presented in this paper were collected at the smelter of the Consolidated Mining & Smelting Co. of Canada Limited, Trail (Tadanac), Brithish Columbia. The authors are greatly indicated to S.

    Dec 1, 1934

  • DFI
    Threading Piles Past Underground Assets In Central London

    By Alexander Nikolic

    The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra

    Jan 1, 2011

  • AUSIMM
    Reopening the Tasmania Mine

    The project to reopen the Tasmania Mine has centred around efforts to reopen the Hart Shaft to access the high grade reef remaining below the old workings, which extend down to 457 in. Efforts in 1

    Jan 1, 1989

  • AUSIMM
    Methods of Restoring New Zealand Native Forests after Mining

    By C Ross

    This paper uses the results of research trials by Landcare Research and Forest Research Institute and assessments of reclamation plantings at mines and other drastically disturbed sites to describe me

    Jan 1, 1995

  • CIM
    Integrating meso- and micro - textural information into mineral processing: an example from the Ernest Henry Iron-Oxide Copper-Gold deposit, Queensland, Australia

    By Maya Kamenetsky, Khoi Nguyen, Natalee Bonnici, Steve Walters, Claire McMahon, Julie Hunt, Ron Berry

    "The analysis of meso- and micro-scale textural attributes has been undertaken on ore samples from the Ernest Henry iron oxide-copper-gold (IOCG) deposit in NW QLD. Quantified textural data including

    Jan 1, 2009

  • SAIMM
    Stope deformation measurements as a diagnostic measure of rock behaviour: a decade of research - Synopsis

    By D. F. Malan

    This paper presents an overview of work conducted over several years to investigate the continuous stope closure profiles recorded in tabular excavations and the use of this data as a hazard indicator

    Jan 1, 2007

  • AUSIMM
    Field Performance of Fully Encapsulated Reinforcement during Violent Failure Events

    By E Villaescusa, C Drover

    Fully resin encapsulated threaded bar and cement grouted cable bolts are common forms of reinforcement for underground mining excavations constructed at great depth. These elements are frequently inst

    May 9, 2016

  • SAIMM
    Safety Considerations When Handling Metal Powders - Synopsis

    By J. M. Benson

    Metal powder compaction offers unique advantages in the manufacture of net-shape components using techniques such as laser sintering, conventional press and sintering, metal injection moulding, direct

    Jan 1, 2012

  • SAIMM
    Internal Corrosion Of Slurry Pipelines Caused By Microbial Corrosion: Causes And Remedies (823fbe7e-37bc-47a1-8382-1714937f7253)

    By C. Ringas

    Pipelines are used extensively in industry to convey various products. Internal corrosion of pipelines can lead to perforation and leakage of the product. A growing problem, not often accurately recog

    Jan 1, 2007

  • SAIMM
    Process Mechanisms In Ilmenite Smelting

    By J. H. Zietsman

    It has previously been observed that industrial high-titania slags display a compositional invariance, remaining close to stoichio-metric M3O5. The present study focuses on this invariance and the phe

    Jan 1, 2004

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • AIME
    Minerals Beneficiation - Correlation of Product Size, Capacity and Power in Tumbling Mills

    By U. N. Bhrany, N. Arbiter

    Over the last one hundred years the problem of assessing the efficiency of energy consumption in producing rock breakage has been studied by many investigators from a variety of viewpoints. Their cont

    Jan 1, 1961

  • AUSIMM
    Past and Future Trends for Gold in New Zealand

    As in other countries, gold mining inNew Zealand has been cyclic in character. Looking at these cycles may provide insights as to what may occur in the future and that is the basis for this study. &nb

    Jan 1, 1994