  • CIM
    Using Millmapper ™ to Reduce Milling Costs and Improve Performance

    By Tom Gabardi, Peter Clarke

    "MillMapperTM is a new 3D laser scanning technology that has only recently been introduced into the North American mining industry. It enables mill operators to gain a much more complete understanding

    Jan 1, 2012

  • SME
    Building Better Haul Roads: Designing For Structural Strength

    The structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo

    Jan 1, 2011

  • SAIMM
    Plenary Speaker-Technical Aspects Of Closed Loop Cooling Water, Associated With The Pebble Bed Modular Reactor Demonstration Power Plant

    By Carl Havemann

    [PAPER PRESENTED AT THE 8thINTERNATIONAL CORROSION CONFERENCE HELD AT THE SA NATIONAL MUSEUM OF MILITARY HISTORY, SAXONWOLD JOHANNESBURG DURING 14-15 NOVEMBER, 2006.]

    Jan 1, 2006

  • SME
    Groundwater Control For Two-Pass Soft Ground Tunneling

    By Cary Hirner, David Stacey, William A. Rochford

    Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T

    Jan 1, 2007

  • SME
    Rock Melting Subterrenes--Their Role In Future Excavation Technology

    By Charles A. Bankston, John C. Rowley, Robert J. Hanold, Joseph W. Neudecker

    The basic concepts and processes of soil and rock melting as applied to excavation technology are reviewed. The electrically heated, small diameter prototype penetrator development sequence is present

    Jan 1, 1974

  • CIM
    The Lonmin Floatability Characterization Test Rig (FCTR) experience

    By E. V. Manlapig, K. R. Rahal, J-P Franzidis

    "The Floatability Characterisation Test Rig or FCTR is a highly instrumented, mobile flotation pilot plant built by Baker Process (now EIMCO) for the AMIRA P9 Project for use in flotation plant modell

    Jan 1, 2002

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • AUSIMM
    Discriminating hematite/magnetite via scanning electron microscope–mineral liberation analyser in the - mesh size fraction of iron ores

    By M Shaffer, D C. Grant, D J. Goudie, P Sylvester, C Voisey

    Scanning electron microscope–Mineral Liberation Analyser SEM-MLA can be used to discriminate between hematite/magnetite in iron ores, but achieving backscattered electron (BSE) segmentation between th

    Jul 24, 2017

  • DFI
    Building Response To Construction Activities

    By Marco D. Boscardin

    Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have

    Jan 1, 2003

  • AUSIMM
    Characterisation of Ore Crushability Using Petrophysical Properties

    By P Fullagar

    Automated multi-sensor core loggers (MSCL) measure petrophysical properties of diamond drill cores, including gamma density, P-wave velocity, electrical conductivity and magnetic susceptibility. A Geo

    Jan 1, 2009

  • ISEE
    Blasting Claims 101: An Introduction to the Defense of Claims

    By Joshua A. Bennett

    "Lawsuits where owners allege their property has been damaged by nearby blasting routinely costblasting companies, explosives engineers, and others in the field both time and money. When ownersfeel th

    Jan 1, 2016

  • ISEE
    Analysis of, Mining Explosion Performance with Multiple Sensor Data and Physical Models

    By Robert Martin, Brian W. Stump, David P. Anderson

    2We use field measurements to quantify physical processes that accompany different types of mining explosions. The data sets collected include three-component ground motion, acoustic, video and high s

    Jan 1, 1998

  • SME
    Accelerated Weathering Of Limestone For CO2 Mitigation: Opportunities For The Stone And Cement Industries

    By William H. Langer

    Large amounts of limestone fines co-produced during the processing of crushed lime-stone may be useful in the sequestration of carbon dioxide (CO2). Accelerated weathering of limestone (AWL) is propos

    Jan 1, 2009

  • ISEE
    Understanding Ground Vibrations and the Effects of Delay Intervals on Amplitude and Frequency

    By Randall M. Wheeler

    The measurement and analysis of blast-induced ground vibrations are more complex than ever before. This is primarily due to the advancements made in microchip technology, mass storage utilities and th

    Jan 1, 1992

  • AUSIMM
    Continuing Professional Development for the Mining Industry - A Suggested Agenda for Action by the AusIMM

    By Pullen G, Rose M

    Continuing Professional Development (CPD) is not just a catch-cry. It is an essential component of every-day life in many professions, including accountancy, law and public administration. Without

    Jan 1, 1989

  • SME
    New Test Methodology For Estimating The Abrasiveness Of Soils For TBM Tunneling

    By F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen

    Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes

    Jan 1, 2007

  • AUSIMM
    Paringa Clean-up Practice

    The purpose of this paper is to describe briefly the clean-up procedure adopted at the treatment plant of Paringa Mining & Exploration Co. Ltd. at Kalgoorlie, Western Australia.A clean-up is carri

    Jan 1, 1941

  • SME
    Adeco As An Alternative To NATM: How It Works, WHY It Works

    By Fulvio Tonon

    And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st

  • NIOSH
    IC 9472 - Wearing Hearing Protection Properly: A 3-D Training Aid For Drillers

    By Edward A. Barrett, Roberta A. Calhoun

    Introduction This Instructor’s Copy contains most of the information needed to use the Wearing Hearing Protection Properly 3-D training reel. It offers practical suggestions on how to use the r

    Jan 11, 2004

  • SME
    Elm Road Generating Station Water Intake Tunnel

    By Brendan Reilly, Jon Isaacson, Paul McDermott

    Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.