Search Documents

  • CIM
    Self-optimizing Grinding Control for Maximising Throughput while Maintaining Cyclone Overflow Specifications

    By Eduardo Nunez, Asim Tuzun, Dan Graffi, Glenn MacPherson

    "In preparation for the milling of a new nickel and copper mine ore, Nickel Rim South, Xstrata’s Strathcona Mill is undertaking numerous process improvement projects. Within the grinding circuit, seve

    Jan 1, 2009

  • AUSIMM
    Paper No. 132. Milling And Treatment of Auriferous Ores in New Zealand.

    In dealing with the pulverization and treatment of auriferous ores, it may be stated that there is not one system of treatment applicable to all classes. In the southern portion of New Zealand the ore

    Jan 1, 1903

  • SME
    A Rock Mass Classification Scheme For The Planning Of Caving Mine Drift Supports

    By Z. T. Bieniawski, E. H. Skinner, R. A. Cummings, F. S. Kendorski

    INTRODUCTION Caving Mine Drift Support Design The support of production drifts remains a high-cost item facing the developer or operator of an underground caving mine. Support costs are incurre

    Jan 1, 1983

  • SME
    Record Production Of Industrial Rocks And Minerals In Utah

    By B. Tripp

    Utah produces a wide variety of industrial rock and mineral commodities, valued in 2005 at a record $758 million (21 percent of the total non-fuel mineral production of Utah). Major commodities produ

    Jan 1, 2007

  • DFI
    Instrumentation Of Construction Vibrations

    By Mark R. Svinkin

    Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c

    Jan 1, 2002

  • SME
    Bulk-scale laboratory experiments of re-entering a sealed heating

    By W. K. Hitchcock

    Anecdotal evidence suggests that re-entering a sealed heating poses a significant hazard, whereby the original heating is rejuvenated at an accelerated rate forcing withdrawal and re-sealing of the ar

    Jan 1, 2009

  • TMS
    New Casting Moulds For Anode Copper

    By Torben Edens

    Norddeutsche Affinerie?s (NA?s) primary smelter continually increased production in the past decade. The smelter?s concentrate capacity was expanded from 500,000 in 1993 to 1,000,000 t/a dry concentra

    Jan 1, 2005

  • DFI
    Use Of Controlled Modulus Columns In Retail & Industrial Development Projects

    By Frederic Masse

    With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f

    Jan 1, 2011

  • DFI
    Tentative Guidelines For Design Of Stone Columns- G. H. Approach - Synopsis

    By A. R. Katti

    The stone columns are widely used in the improving the bearing capacity of weak soils mostly for supporting flexible foundation systems. The load carrying capacity of a stone column is complex in natu

    Jan 1, 1996

  • AUSIMM
    Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New Zealand

    Vein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro

    Jan 1, 2002

  • NIOSH
    IC 8862 Land Utilization And Reclamation In The Mining Industry, 1930-80

    By Wilton Johnson

    The Bureau of Mines study indicates that land utilized by the mining industry for mineral extraction and processing from 1930 through 1980 amounted to 5.7 million acres, or 0.25 percent of the land ma

    Jan 1, 1981

  • DFI
    Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA

    By P. B. Kelleher

    Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,

    Jan 1, 1989

  • DFI
    Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis

    By B. N. Hira

    A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t

    Jan 1, 1996

  • SME
    Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer Tunnels

    By Richard A. Cubeta

    Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and

    Jan 1, 2008

  • ISEE
    Economics of Blasting around Steep Dipping Coal Seams at the Mt. Owen Mine

    By Trevor Howie, Mal Edwards

    "Thiess Contractors Pty Ltd. designed and operate the Mt Owen Mine in the Hunter Valley of NewSouth Wales, Australia on behalf of the owners of the mine, BHP Coal Pty Ltd. The mine is a multiseam open

    Jan 1, 1997

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • AUSIMM
    The Heavy Media Separation Coal Washing Plant at Lidsdale, New South Wales

    The Heavy Media Separation plant operated at Lidsdale siding, eight miles from Lithgow, by the N.S.W. Mining Co. is a product of the Western Machinery Company, of D.S.A.This mill, designed to use fine

    Jan 1, 1954

  • AUSIMM
    Removing Overburden at Golden Ridges Mine, New Guinea

    The Golden Ridges Mine, one of the properties of New Guinea Goldfields Limited, is situated on the right bank of Nami Creek, not far from the township of Wau, in the Territory of New Guinea.The proper

    Jan 1, 1934

  • ISEE
    A New and Reliable Technique for Safely Removing Underground Rock Hang-ups

    By Brian Micke, Mick Gavrilovic

    The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h

    Jan 1, 1999

  • AUSIMM
    An Analysis of the Performance of a Ball Mill Rake Classifier Comminution Circuit

    An extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope

    Jan 1, 1967