Search Documents

  • AUSIMM
    Hierarchical Clustering Algorithm for Block Aggregation in Open Pit Mines

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. Various mixed integer linear programming (MILP) formulations have been used for production scheduli

    Dec 6, 2010

  • AUSIMM
    Kalgoorlie Geology Re-Interpreted

    By Miller F. S

    The famous Golden Mile of Kalgoorlie in Western Australia was, between 1888 and 19ft, one of the richest and most important gold camps in the world. Annual production, which reached a peak of nearly 1

    Jan 1, 1937

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    Traditional dilution control systems range from computer modeling, use of physical markers on the field as polypipes to a technology that marks some control points where displacement is measured. The

  • AIME
    Minerals Beneficiation - Separation Efficiency

    By Norman F. Schulz

    The technical excellence of separation achieved in a mineral concentration process, or any other process where two constituents of any kind are physically separated from each other, is expressed uniqu

    Jan 1, 1971

  • SME
    Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway

    By Chris Bennett, Drupad Desai, Kirit Mevawala

    INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg

    Jan 1, 2005

  • AUSIMM
    Western Lode Structures and Southward Extensions of the Boulder Mining Belt

    An intensely sheared and mineralized zone occurs in the quartz dolerite greenstone (or younger greenstone) mass on the western limb of the Kalgoorlie syncline. This zone comprises the western part of

    Jan 1, 1964

  • SME
    Studies On Water-Injection Cyclone For Processing Iron Ore Fines

    By U. B. Kodukula

    Attempts are made to evaluate the feasibility of using a water-injection cyclone for the concentration of iron ore fines. The separation characteristics of clay fines, containing large amounts of alum

    Jan 1, 2008

  • DFI
    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989

  • SAIMM
    Simulated Rockburst Experiment: Development Of A Numerical Model For Seismic Wave Propagation From The Blast, And Forward Analysis

    By M. W. Hildyard

    A blast was engineered close to a tunnel in a deep-level mine with the purpose of studying the wave interaction with the tunnel. Numerical modelling of seismic wave propagation was used in both the fo

    Jan 1, 2001

  • AUSIMM
    Innovations and State-of-the-Art Technologies Employed in the Continuous Casting of Slabs and Beam Blanks

    By Zajber A, Kulchen R, Letzel D, Weyer A, Schwellenbach J

    The search for modem casting plant concepts today focuses more and more on the harmonisation and optimisation of overall concept lines to obtain a continuous quality control and reduce the cost of

    Jan 1, 1999

  • SME
    Reflections on ilmenite roasting and magnetic separation

    By N. R. Allen, J. D. Steenkamp

    Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of

    Jan 1, 2005

  • SME
    Uetliberg Tunnel?Soft Ground Excavation And Premiere Of New Tunnelling Machine: World?s First Tunnel Bore Extender Excavated BY Undercutting

    By S. Maurhofer

    The Uetliberg Tunnel in Switzerland is the longest tunnel in Zurich?s new Western Bypass Expressway, connecting the Birmensdorf bypass in the west with the existing Zurich-Chur national motorway in th

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing

    By J. Osterberg

    A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward

    Jan 1, 1989

  • SME-ICGCM
    Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical Modeling

    By Slawomir Bock

    One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s

    Jan 1, 2009

  • IIMP
    Sistemas de información aplicados a la seguridad e higiene minera

    By Fernando Altamirano

    Dado que en las unidades mineras existen problemas respecto al manejo de la información relacionada a la seguridad, salud e higiene tales como que los reportes enviados a las autoridades competentes (

    Aug 25, 2002

  • SME
    Foreign coal is a threat, but US producers are finding ways to compete

    By Steve Kral

    Competition from foreign coal producers could displace as much as 9 Mt/a (10 million stpy) of US coal bound for power plants located near waterways. But, according to a Maryland-based coal consultant,

    Jan 1, 1986

  • DFI
    Connecting Railway Lines In Vienna With Underground Structures - Synopsis

    By Rüdiger Wunsch

    The new high speed Vienna - St.Pölten line and the Lainzer tunnel are to be connected to the existing Western railway line in Vienna. This involves building an underground cut and cover branching tunn

    Jan 1, 2000

  • CIM
    Deformation and Structural Controls on Gold Mineralization in the Clarence Stream Shear Zone, Southwestern New Brunswick, Canada

    By K. G. Thorne, D. R. Lentz, A. F. Park

    "The Main zone of the Clarence Stream gold deposit is hosted by a shear zone adjacent to the Saint George batholith in southwestern New Brunswick. The mineralization history relates to progressive def

    Jan 1, 2008