Search Documents

  • ISEE
    Regulation Compliance: Security in Manufacturiing, Transportation, Storage and Use of Commercial Explosives

    By John Capers

    •The IME is the Safety and Security Association of the commercial explosives industry in the United States and Canada. •Founded in 1913 •Board of Governors •5 Standing committees- 1. Technical 2. Envi

    Jan 1, 2006

  • SME
    MinExpo 2008: The Biggest Ever

    From the massive equipment that moves the earth, to the parts that keep the equipment moving, it was all on display for more than 35,000 people who at-tended MinExpo 2008 at the Las Vegas Convention C

    Jan 1, 2008

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • CIM
    Arching Effects and Sillmat Behaviour

    By Euler De Souza

    This paper presents a study conducted to assess sillmat behaviour during undercut mining and to provide a comprehensive understanding of the effects of arching and sillmat thickness on stability. The

    May 1, 2002

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • CIM
    How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive Programs

    By A. Tylczak, C. Norman, C. Shook, S. Loif

    "There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m

    Jan 1, 2015

  • NIOSH
    Forecasting Roof Falls with Monitoring Technologies – A Look at the Moonee Colliery Experience

    By John L. Edwards, Anthony T. Iannacchione

    There has been a persistent need to forecast roof falls so that miner’s exposure to hazardous underground environments can be minimized. Several monitoring techniques have been developed and are used

  • ISEE
    Use of Signature Hole Analysis for Blast Vibration Control at the Highvale Mine

    By Ron J. Elliott, Dylan Wedgewood

    A series of five signature holes were blasted at the Highvale Mine and the resultant seismic data was analyzed to make recommendations on how best to address neighbour complaints regarding blast vibra

    Jan 1, 2018

  • SAIMM
    Mortimer Smelter: Operations Description

    By C. Sima, M. Legoabe

    Keywords: Pyrometallurgy, furnace, platinum Mortimer Smelter is one of the three smelting operations in the Anglo Platinum Group. It is located in the Limpopo Province, approximately 100 km north

    Jan 1, 2006

  • DFI
    Response to Load for Four Different Types of Bored Piles

    By Mario Terceros H., Bengt H. Fellenius

    "ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore

    Jan 1, 2014

  • SAIMM
    Practices And Design For Extending The Hearth Life In The Mittal Steel Company Blast Furnaces

    By W. Carter, P. Chaubal, K. Spaleck, M. Schoeman, J. Bobek, W. Seegers

    Keywords: Pyrometallurgy, steel, hearth, blast furnace The Mittal Steel Company operates about 36 blast furnaces on four continents. Furnaces range from 1100 m3 to 4800 m3 inner volume. The focu

    Jan 1, 2006

  • NIOSH
    RI 7779 The Spectral Growth Of Expanding Flames - The Infrared Radiance Of Methane-Air Ignitions And Coal Dust-Air Explosions

    By M. Hertzberg

    Results of a comprehensive study of the absolute spectral radiance of the infrared emissions from methane-air explosions are reported. The spectral growth of these expanding flames were recorded with

    Jan 1, 1973

  • ISEE
    Impact of Open-Pit Blasting on the Multi-Seam Workings of Adjoining Underground Coal Mine

    By Ajoy K. Singh, B Mohanty, P K. Singh

    A study was conducted to investigate the damage potential to underground multiseam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal exp

    Jan 1, 2011

  • IIMP
    Sistema de control. Supervisor experto para el manejo de gases

    By Jorge Meza

    Uno de los objetivos principales del proyecto de la modernización de la Fundición SPCC es capturar y procesar el gas generado de la reacción exotérmica del proceso de fusión de los sulfuros del conce

    Sep 19, 2006

  • CIM
    Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy

    By J. Châteauneuf, R. Dupéré, D. Mrabet

    "In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a

    Jan 1, 2016

  • SME
    Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line B

    By Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert

    INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM

    Jan 1, 2007

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • SME
    CART?: A Fundamental Tool For Process Circuit Design

    By A. Noble

    The design of separation circuits can be a complex, labor-intensive and costly process. While the engineer?s experience along with extensive data sets and simulation are crucial tools for determining

    Feb 27, 2013

  • SME
    Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? Introduction

    By Geoffrey Hughes

    The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive

    Jan 1, 2008