Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Influence of Structural Stress Concentration and Structural Irregularity on Longwall Gateroad Roof ControlBy Daniel Su
Following several roof falls in the E3 longwall development of a Consol Pennsylvania Coal Company underground coal mine, an underground roof geology reconnaissance program consisting of twenty-nine 20
Jan 1, 2002
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple SeamsBy Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017
-
Study of the Behavior for Backfilling Material in Room-and-Pillar Coal MiningBy Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes
"Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results
Jan 1, 2010
-
Truss Bolting On-Cycle in Jane Mine Lower Freeport SeamBy Ken Barish
Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The
Jan 1, 1984
-
Assessment of Ground Conditions Near a Mine Portal Using Ground Penetrating RadarBy Michael Trevits
The NIOSH Lake Lynn Laboratory (LLL) is a unique research facility, located about 50 miles southeast of Pittsburgh, Pennsylvania, that is designed to provide a full-scale mining environment for testin
Jan 1, 2005
-
Laboratory Strength Testing of Coal from Selected Illinois SeamsBy E. Bane Kroeger
For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un
Jan 1, 2004
-
Chemical Consolidation For Roadway Surrounding Rock - It's Theory And ApplicationsBy Jinhua Wang
Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con
Jan 1, 1996
-
Suspension Designs Required in the Logical FrameworkBy Ross W. Seedsman
The logical framework recognises that a coal mine roof can be intrinsically stable or may collapse in one of four ways. Suspension of the immediate roof is one of fundamental ground control strategie
Jan 1, 2014
-
An Alternative To A Manual Torque Check On Roof BoltsBy Joseph A. Cybulski
In response to the mining of reserves with increasingly adverse round conditions and the roof support recommendations of current rock mechanics theories, roof support systems have continued to improve
Jan 1, 1990
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the OverburdenBy Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
Development of Road Header Roof Bolting ModuleBy Sean C. Farrell
In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P
Jan 1, 2014
-
Evaluation Of Mobile Roof Support TechnologiesBy Hamid Maleki
This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l
Jan 1, 2001
-
The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone MinesBy Simon H. Prassetyo
Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre
Jan 1, 2011
-
A New Approach to the Integrity Testing of Ground AnchoragesBy Andrew Starkey
Ground anchorage systems in the form of rock bolts are used extensively throughout the world as supporting devices for civil engineering structures such as bridges and tunnels. It is widely recognized
Jan 1, 2001
-
Assessment Of Wood And Alternative Materials For Supplemental Roof Support ConstructionBy Thomas M. Barczak
The engineering of a support system is driven largely by economics. The goal is to provide effective support at minimal cost. For this reason, wood has been extensively used as a support material for
Jan 1, 1994
-
Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture RadarBy Jessica M. Wempen
Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface
Jan 1, 2014
-
Analysis of Panel Stability for Post-Mining Slurry InjectionBy Tim Ross
Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces
Jan 1, 1998
-
Longwall Production, Maintenance, And Roof Control SystemBy W. Mark Hart
The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position
Jan 1, 1994
-
FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field TrialBy H. Yavuz
A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T
Jan 1, 2001
-
Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian ConditionsBy Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was
Jan 1, 1999