Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Project Management For Dummies, Or “How To Improve Your Project Success Ratio In the New Millenium”

    By R. J. Hickson

    From 1993 through 1999 Cyprus Amax Minerals Company successfully completed eight major construction projects around the world. Six greenfield mines were brought into production, an ongoing operation w

    Jan 1, 2000

  • SME
    Flotation Monitor Improves Copper Recovery at Bagdad

    Phelps Dodge Mining’s Bagdad, AZ copper facility uses a large series of cone crushers and ball mills to reduce copper ore to very fine particles. The solids are mixed with water to create a slurry

    Jan 1, 2005

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013

  • SME
    Performance Analysis Of Different Estimation Methods On Conditionally Simulated Deposits (0cbc8d79-eac1-4ce3-b58c-f46ab73f673b)

    By A. Arik

    An accurate estimation of mining block grades continues to be a challenging task for ore reserve practitioners. Two of the factors that affect the accuracy of the estimates are the estimation method u

    Jan 1, 2000

  • SME
    Effect Of Microwave Treatment On The Flotation And Magnetic Separation Properties Of Pyrite, Chalcopyrite, Galena And Sphalerite

    By N. M. Can

    The effects of microwave treatment on the floatabilities and magnetic susceptibilities of some sulfide minerals, namely, pyrite, chalcopyrite, galena and sphalerite, were studied. Pure mineral samples

    Jan 1, 2007

  • SME
    Pebble Crushing Practice at Cyprus Bagdad

    By Bruce Clements

    The Bagdad mill, located near Bagdad, AZ, was built in 1977 with a designed mill capacity of 36.3 kt/d (40,000 stpd). An autogenous mill-ball mill crusher (ABC) grinding circuit was chosen. The or

    Jan 1, 1992

  • SME
    Effectiveness of a water curtain utilized for dust control on continuous miner sections

    The Mine Safety and Health Administration (MSHA) conducted a respirable dust survey to evaluate the effectiveness of a water curtain utilized for dust control on continuous miner sections. The purpose

    Jan 1, 2009

  • SME
    Methane Emissions And Airflow Patterns On A Longwall Face

    By S. J. Schatzel

    Coal mine longwall face ventilation is an important component of the overall mine ventilation system. Increases in the production rate due to higher capacity mining equipment tend to increase methane

    Jan 1, 2012

  • SME
    Development Of A High Blow Energy Hydraulic Impactor

    By Wm. Ross Wayment, Innes P. Grantmyre

    INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor

    Jan 1, 1976

  • SME
    Stress Analysis and Design of Tunnel Linings

    By Ching L. Wu, Joseph Penzien

    An analytical procedure is presented for evaluating the stresses in linings of bored tunnels caused by kinematic soil-lining interaction. Three cases of interaction as produced by the following condi

    Jan 1, 1997

  • SME
    Construction of an Underpass Crossing in Proximity of a Railway Track

    By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi

    "1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is

    Jan 1, 2016

  • SME
    Raw Water Tunnel Condition Assessment

    By Rafael C. Castro

    As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In

    Jan 1, 2008

  • SME
    GMSG Guideline: Determining the Bond Efficiency of Industrial Grinding Circuits

    "Use of the Bond Work Index to size industrial grinding equipment was widely known. Bond also described its application for measuring grinding circuit efficiency. Bond Work Index efficiency has been w

    Jan 1, 2016

  • SME
    Promoting Cooperation Between Small- and Large-Scale Miners in Ghana

    By C. Anim-Sackey, R. K. Amankwah

    Some large-scale mining companies in Ghana have adopted proactive management strategies in dealing with small-scale (galamsey) miners who have encroached on their concessions. This has been mainly ac

    Jan 1, 2004

  • SME
    Membrane Vs. Chemical Treatment To Remove Mine Water Contaminants ? Determining Which Process Works Best For Mine Water Treatment Needs ? Introduction

    By H. C. Liang

    Reverse osmosis (RO) and nanofiltration (NF) are widely regarded as being best available technologies (BATs) for removing contaminants of concern from water. In recent years, NF or RO treatment has i

    Jan 1, 2012

  • SME
    Technology News – Automated-Plow Longwall Ordered for Chinese Coal Mine

    German manufacturer DBT signed a contract to supply a sixth automated-plow long-wall system to Shenyang Coal in Liaoning province in northeastern China. This most recent order occurred just weeks aft

    Jan 1, 2004

  • SME
    Development Of An On-Line Coal Washability Analysis System Using X-Ray Computed Tomography

    By G. T. Adel, J. D. Miller, C. L. Lin

    Washability analysis determines the maximum separation efficiency that can be achieved in the operation of coal preparation plants. Unfortunately, there are no on-line techniques for determining this

    Jan 1, 2000

  • SME
    Collection Of Hydrophobic Particles In The Froth Phase

    By N. Ahmed

    The collection of hydrophobic particles in the froth phase in flotation has been studied. A continuous flotation cell was developed, in which the froth phase could be isolated from the pulp zone. Hema

    Jan 1, 2001

  • SME
    Narrow Vein Long Hole Stoping

    Due to deposit shape and dimension, narrow vein makes reserve modeling, geological control, stope design, drill and blasting more challenging. It needs high standard quality control as errors can be c

    Jan 1, 2012

  • SME
    Probable Cost Estimating and Risk Management

    By John Reilly

    Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti

    Jan 1, 2008