Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A New Integrated Workflow to Increase Drilling Accuracy using Post Process Kinematics(PPK) Drones and Smart Drills

    By Ravi Sahu, Kris Jeremiah

    This paper aims to study the benefits of using Post Processed Kinematics(PPK) surveying methodology combined with Drone photogrammetry to achieve highly precise positioning (X, Y, Z) of drill holes b

    Feb 1, 2020

  • ISEE
    Cast Blasting Advances and Challenges at Arco's Black Thunder Mine

    By Robert L. Martin, Brian W. Stump

    "The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO

    Jan 1, 1997

  • ISEE
    Rock Specific Breakage Energy Functions Derived from Lab Scale Blast Experiments

    By Peter Moser, Andreas Grasedieck

    In modern rock blasting it is becoming more and more important to achieve a certain specified fragmentation. This means that the rock particles formed as a result of the blast should conform to a desi

    Jan 1, 2004

  • ISEE
    The Science of Blasting

    By Andrew Ritter, Victor I. Montenyohl, Stephen R. Winzer

    Thirty-seven open pit production blasting operations have been monitored using high-speed cameras running between 500 and 7000 frames per second. Analysis of the resulting films reveals irregularities

    Jan 1, 1979

  • ISEE
    Seismic Modelling Control Of Blasts In A Nuclear Power Plant

    By Alain Blanchier, Pascal Bernasconi

    Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati

    Jan 1, 2008

  • ISEE
    Mechanisms of Linear Shaped Charge Cutting - A New Explanation

    By Paul Worsey, Braden Lusk, Seokbin Lim

    This paper discusses the theory and experiment involved in the discovery of the mechanisms of Linear Shaped Charges, which are much different from those for Conical Shaped Charges. Linear Shaped Charg

    Jan 1, 2005

  • ISEE
    Instrumental Detection of a Climatologically-Induced Cosmetic Crack in Wall Covering

    By Pierre-Alexandre Abeel, Charles Dowding, Justin Lueker

    When blasting is eliminated as a cause of cosmetic cracking, often someone will ask, “If blasting didn’t cause the crack, then what did?” This paper describes detection by remotely operated instrument

    Jan 1, 2015

  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln (8311e31c-6f16-4a2a-8cda-6570ebbd2b33)

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lime Companys new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910

    By W. L. Saunders

    RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift

    Jan 1, 2011

  • ISEE
    Peak Particle Velocity versus Gravitational Acceleration as a Stability Criterion for Earth Retaining Walls Subjected to Production Blast Vibrations

    By Dale Preece, Joergen Pilz, Zavis Zavodni

    An overland conveyor was constructed at a surface coal mine to reduce the truck haul distance and make the operation more efficient. An important element in this system is a truck dump facility to tra

    Jan 1, 2010

  • ISEE
    Comparison of Traditional Signature Hole Technique and Monte Carlo Approach

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    Time-retarded Chemistry Tweaks Shock/heave Ratio

    By Michael Wieland

    Work-principle computations for explosions underwater or in rock reveal the way the thermodynamic characteristics of surrounding material influence the resulting shock and heave. To reach total thermo

    Jan 1, 2008

  • ISEE
    A Blast Design Analysis for Optimizing Productivity at INCO Limited's Thompson Open Pit

    By Nan H. Lee, Christopher J. Hunter, Stephen H. Chung

    Several factors affect the productivity of mining operations. The geological structure of a mineral deposit and the fragment size of blasted material are considered to be most influential. It is well

    Jan 1, 1991

  • ISEE
    Underwater Energy Measurements for Aluminized and Nonaluminalized Emulsion and Watergel Type Commercial Explosives

    By Oldrich Machacek, Gary R. Eck

    The underwater detonation test method has been long recognized as a useful tool for the evaluation of the energy release and relative effectiveness of commercial explosives. In this study, underwater

    Jan 1, 1990

  • ISEE
    Modeling VOD and Initiation Effects on Blast Vibration PPV Using Nonlinear Charge Weight Scaling and Variable Time-window for Charge Elements

    By Mathias Jern, Ruilin Yang

    A blast vibration model has been developed that simulates effects of almost all blast design parameters on the blast vibration peak particle velocity (PPV) from a production blast with multiple blasth

    Jan 1, 2019

  • ISEE
    High-Order Numerical Methods and Reaction Rate Law for Non-Ideal Detonation Modeling

    By Eduardo Lozano, Vilem Petr

    This study demonstrates the ability of high-order, shock-capturing methods to simulate detonation wave propagation in right circular cylinders of non-ideal explosives. 2-D axisymmetric, reactive Euler

    Jan 1, 2019

  • ISEE
    Preblast Surveys and a Look at Today's Seismographs: A General Look

    By Randall M. Wheeler

    Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a

    Jan 1, 1992

  • ISEE
    The Use of Numerical Modeling to Enhance Fines Predictions

    By A. S. Tawadrous

    Fines are produced in any blasting application. Depending on the application, fines may or may not be a desirable product of the blast. In most quarry and construction applications, fines are consider

    Jan 1, 2012

  • ISEE
    Flyrock Range & Fragment Size Prediction

    By Cameron McKenzie

    Flyrock is a complex issue involving interaction between the charging crew, the blast design, and the local geology, and once conditions on the shot meet certain criteria, the probability of a flyrock

    Jan 1, 2009

  • ISEE
    A Method to Measure Detonation Front Curvature of Emulsion Explosives

    By Nikolaos Petropoulos, Ulf Nyberg, Ulf Stenman, Daniel Johansson, Håkan Schunnesson

    The optimization of the explosive performance is of great importance since blasting is extensively used in civil projects and mining industry. An improved understanding of how the energy from the deto

    Feb 1, 2020