    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?

    By Richard W. Hanford

    The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an

    Jan 1, 2001

  • DFI
    Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange

    By Mark Maday

    As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o

    Jan 1, 2011

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    Dynamic Monitoring Program Results Indicator Pile Tests -I-880 - Introduction

    By D. Michael Holloway

    The realignment of Interstate 880 replaces the double-decked (Cypress) viaduct collapsed in Oakland, California during the 1989 Loma Prieta Earthquake. The California Department of Transportation (CAL

    Jan 1, 1996

  • DFI
    Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis

    By Yvone Franco Crosato

    The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat

    Jan 1, 2000

  • DFI
    Deep Foundations In Hong Kong - Synopsis

    By Martin Pratt

    This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr

    Jan 1, 2000

  • DFI
  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • DFI
    The Merits Of Polymeric Fluids As Support Slurries

    By J. J. Beresford

    The primary function of a support slurry is to provide stability during excavation. Today foundation structures can be designed around the additional friction afforded by the absence of the filter cak

    Jan 1, 1989

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Present To Future Design Considerations Of Deep Foundations ? 1. Introduction

    By William S. Gardner

    It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac

    Jan 1, 1991

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • DFI
    Small Diameter Piling System Used In Australia

    By P. J. Yttrup

    Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods

    Jan 1, 1989

  • DFI
    Practical Aspects Of Compensation Grouting ? Synopsis

    By Philip J. H. Ball

    The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial

    Jan 1, 2000

  • DFI
    Performance Based Seismic Retrofit Design of Brooklyn Basin Wharf

    By Sam Yao, Ali Naeem, Sara Barrett

    Brooklyn Basin Project is a multi-billion-dollar development of the former Port of Oakland 9th Avenue Terminal located along the Oakland Estuary of California. A centerpiece of the development is the

    Jan 1, 2018

  • DFI
    Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava

    By J. Stacho, Frankovská. J.

    "Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on

    Jan 1, 2014

  • DFI
    Preserving The Foundations Of Some Of Boston?s Oldest Buildings

    By Michael J. Atwood

    Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood