    Treated Round Wood Piling Specifications

    By James S. Graham

    Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a

    Jan 1, 1992

  • DFI
    Minipiles And Jet-Grouting: A Strong Foundation In Parma, Italy

    By Bruno Gemmi

    The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid

    Jan 1, 2011

  • DFI
    Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - Summary

    By Bengt H. Fellenius

    The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe

    Jan 1, 1999

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014

  • DFI
    Deep Foundations In The Challenging Geology Of Central Florida

    By Gary Kuhns

    Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo

    Jan 1, 2003

  • DFI
    Diaphragm Walls, Recent Developments to Improve Reliability

    By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen

    "Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual

    Jan 1, 2014

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load Testing

    By Tatsunori Matsumoto

    In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were

    Jan 1, 2006

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • DFI
    A Pile-Supported Mat Foundation For A 27-Story Building In Milwaukee, Wisconsin (USA)

    By Alan B. Wagner

    The River Tower is a proposed 27-story condominium building in the heart of downtown Milwaukee, Wisconsin (USA). The tower will be over 100 m tall, and will have a ground area measuring 15 m by 40 m.

    Jan 1, 2002

  • DFI
    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • DFI
    Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead Signs

    By Roy H. Borde

    The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio

    Jan 1, 1988

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • DFI
    Doyle Drive - Extreme Pile Installation

    By Peter Faust

    The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha

    Jan 1, 2011

  • DFI
    Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction

    By D. Michael Holloway

    The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-

    Jan 1, 1995

  • DFI
    International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997

    This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja

    Jan 1, 1997

  • DFI
    Stress Analysis Of Reinforced Earth Bridge Abutment ? Synopsis

    By S. D. Zhang

    The first reinforced earth railway bridge abutment in China has been successfully constructed of September, 1985 under the supervision of the Reinforced Earth Researth Group of Shanghai Institute of R

    Jan 1, 2010

  • DFI
    Design & Construction Of Pile Foundations For A Building Complex - A Case History

    By S. K. V. Avasarala

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c