Lateral Earth Pressure On Lagging In Soldier Pile Wall SystemsBy Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
Measured And Predicted Response Of Laterally Loaded Piles - SynopsisBy K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation SupportBy Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree
A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)
Jan 1, 2018
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Trends In Deep Foundations In Europe ? SynopsisBy R. Stenne
This paper presents the trends in deep foundations in Europe, both in terms of design and construction. Eurocode 7 which is a design code for geotechnical engineering will be introduced in the Eur
Jan 1, 2000
-
High Stress Pile Testing At Soldier FieldBy Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002
-
The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? SynopsisBy M. Tominaga
An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco
Jan 1, 2010
-
Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In MarlBy Gregory J. Canivan
Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and
Jan 1, 2002
-
Vibration Environmental Effect Of Construction Operations - SynopsisBy Mark R. Svinkin
Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel
Jan 1, 2000
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft InteractionBy Hessam Yazdani
In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations
Jan 1, 2013
-
Improved Pile Economics: High Design Stresses And Remote Pile TestingBy Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Crane Boom Loadings From Pile DrivingBy Alan G. MacKinnon
Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s
Jan 1, 1986
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge PiersBy Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Mitigating Settlement with Pile-Supported Approach SlabsBy Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
Piling The Gateway To EuropeBy Howard Roscoe
Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su
Jan 1, 2002