Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Conditional Bias of Geostatistical Simulation for Estimation of Recoverable Reserves

    By Jason A. McLennan

    Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we

    May 1, 2002

  • CIM
    ZincexTM Technology: Recent Industrial Operations

    By D Martín, G. Díaz, F. Cubeddu, A. B. Mejias

    The Modified ZINCEXTM Process (MZP), developed by Técnicas Reunidas, is an industrially proven flexible process. It can handle a wide range of primary and secondary raw materials, producing SHG zinc.

    Jan 1, 2014

  • CIM
    Lithogeochemistry and Hydrothermal Alteration at the Halfmile Lake South Deep Zone, a Volcanic-Hosted Massive Sulfide Deposit, Bathurst Mining Camp, New Brunswick

    By L. K. Mireku

    "Abstract - The Halfmile Lake South Deep zone, Bathurst Mining Camp, New Brunswick, was discovered by Noranda Inc. (Exploration) as a result of a 3-D seismic survey in 1998 and the subsequent drilling

    Jan 1, 2006

  • CIM
    Age Dating and its Geodynamic Implications for the Gangdese Porphyry Cu-Mo belt, Tibet

    By Gaoming Wang

    Outline 1. The Gangdese porphyry Cu-Mo belt 1.1 Regional geological background 1.2 Cu-Mo-bearing porphyries 1.3 Mineralization and alteration 2. Dating methods and results 2.1 Qulong porphyry 2

    May 1, 2004

  • CIM
    Development of Fail-Safety system for Building Wall Cleaning Robot

    By J. Huh

    Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu

    Aug 1, 2013

  • CIM
    Selected Methods for Shaft Lining Repairs in Polish Coal Mines

    Shafts are the most important workings in the underground mines. Their technical state to a large extent determines the safety and efficiency of mining operations. However, in many cases periodically

    Aug 1, 2013

  • CIM
    Determination of a Friction Angle for an Alkaline Igneous Rock

    By John E. Udd

    The stability of a rock mass is influenced by the presence of discontinuities. In assessing stability, it is required that one should know the frictional and cohesive properties of these contained wea

    Jan 1, 1979

  • CIM
    Assessment of slag backfill properties for the Noranda Chadbourne Project

    By Norman Lecuyer, Jacque Nantel

    "The Chadbourne Project, located within the limits of the town of Noranda, Quebec, will make use of backfill materials to fill the voids left by the mining of stopes and pillars. A series of tests wer

    Jan 1, 1983

  • CIM
    Corefco Refinery - Review of Operations

    By R. Krentz, P. D. Cordingley

    The nickel-cobalt sulphides produced from limonitic laterite ores by Moa Nickel S.A. in Cuba are refined at the Corefco nickel-cobalt refinery in Canada. Major changes to the refining process were req

    Jan 1, 2005

  • CIM
    Automated Continuous Mining at Sylvite

    By W. G. Schultz

    "Sylvite's potash mine, which produces 8,000 tons of ore per day, probably ranks as one of the most highly mechanized and automated mining operations in the world. Employing, on a normal 10-hour produ

    Jan 1, 1973

  • CIM
    An analysis of AL-60 airleg maintenance data

    By R. Frank Chiappetta, E. B. Wilson

    "The maintenance records for AL-60 airlegs at Falconbridge Ltd. are used to demonstrate some of the procedures for the analysis of such data.The data are not representative of pure failure s of one ty

    Jan 1, 1985

  • CIM
    An overview of wear-resistant alloys for the mining industry

    By J. B. C. Wu, B. McKee

    "Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is

    Jan 1, 1997

  • CIM
    Re-Thinking Underground Hard Rock Mining

    By Alex Henderson

    The underground hard rock mining industry has had little change since the mobile equipment era began in the 1970s. Equipment has become larger and faster but has not kept pace with the following chall

    May 1, 2011

  • CIM
    Canadian Exploration Incentive Program

    By Robert B. Parsons

    "The Canadian Exploration Incentive Program (CEIP), which was announced by the federal government on May 3, 1988, promises to maintain the viability of flow-through shares as a financing mechanism whi

    Jan 1, 1988

  • CIM
    Process for the Complete Utilization of Oil Sands Fly Ash

    By T. H. Etsell, P. C. Holloway

    The fly ash produced by oil sands operations in northern Alberta represents a large, high-grade, potential resource for vanadium production in Canada. After extensive batch testing at the University o

    Jan 1, 2004

  • CIM
    Ion Exchange For Electrolyte Purification In Copper Electrowinning And Electrorefining

    Ion Exchange is finding a greater role in copper processing, and hydrometallurgy in general, both as a technique for removing impurities and as a means of adding value through the recovery of secondar

    Jan 1, 2007

  • CIM
    Prognosis and maintenance management system for applications to aircraft engines

    By Raj Thamburaj, Li. Ping, Prakash C. Patnaik

    "An effective prognosis system for aircraft engines may involve the application of a wide range of technologies and methodologies, which may include: - On-line, real-time and in-situ non-destructive i

    Jan 1, 2004

  • CIM
    CIM Guidelines for the Reporting of Diamond Exploration Results (2003)

    "These guidelines, implemented in 2003, were recommended by the Diamond Exploration Best Practices Committee established by the Canadian Institute of Mining, Metallurgy and Petroleum. The guidelines a

    Jan 1, 2003

  • CIM
    Designing for Closure And Beyond: The Perspective from Financial Institutions

    WHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris

    May 1, 2006

  • CIM
    An Innovative Approach to Shaft Sinking Stage (Galloway) Design

    By J. Holder

    "A key barrier to vertical mineshaft construction is the construction access required for workers. A suspended work stage is used to provide this access for the mechanical, electrical and structural a

    Jan 1, 2019