Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geology of the Grand Lake CoalfieldBy W. J. Wright
Summary Statement The following notes on the geology of the Grand Lake coalfield are intended to be introductory to a second paper being read at this meeting, which paper will describe the earlier an
Jan 1, 1935
-
A Review of the Proposed Changes in the Alberta Mines ActBy George Kellock
Introductory The Alberta Provincial Government has contemplated a revision of the Mines Act for some time past, and it is understood that a definite decision has now been made to do this at the nex
Jan 1, 1929
-
Best Practices In Drying And Calcining Of YellowcakeBy S. Kashani Nejad, M. Bellino, K. Collins, C. Tovee, J. Godwin
Motivated by safety considerations, logistical issues, transportation cost savings, product diversification, and marketing preferences, several uranium producers are revisiting their business models a
Jan 1, 2020
-
Centrifugal Extraction Machine and Application of the Equipment in Extraction of Rare EarthsBy T. Xu
"The CTL-500 centrifugal extraction machine, which was independently developed by Baotou Shibo Rare Earth Extraction & Equipment Co., Ltd., is presented in this article. The machine is based on centri
Jan 1, 2012
-
On the Post-Peak Fluid-Driven Damage of Rock-Like Material by Controlling Hollow Cylindrical Circumferential Strain Associate with Nodestructive Techniqe of Acoustic EmissionBy L. H. Chen, Y. C. Chen, Leo Benyamin, W. C. Chen
"To investigate the evolution of fluid-driven fracture of rock-like material subjected to borehole fluid pressure and its consequential damage with regard to post-peak stabilization, micro-seismic act
Jan 1, 2015
-
Some Problems in the Treatment of Gold OresBy The Staff
Introduction In this paper it is proposed to discuss briefly some of the problems confronting the management of a gold mine in choosing a method of milling to recover the gold from various classes of
Jan 1, 1931
-
Mining Education at the CrossroadstThe Shortage of Mining and Metallurgical Engineers I N many parts of the Western World attention has recently been drawn to the acute shortage of mining and metallurgical engineers produced by the uni
Jan 1, 1965
-
No. 2 Shaft Raise, Aunor Gold Mines, Ltd.By G. H. Montgomery
THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the
Jan 1, 1957
-
An Improved Elasto-Plastic Model for Underground ExplosionsBy M. Jiang, X. Fan, W. X. Chen, Z. K. Guo, H. H. Zou
"Some improvements are carried out for elasto-plastic model by taking the shear dilation effects and relaxation effects of deep rocks into accounted. The high pressure equations of states with Mie-Grü
Jan 1, 2015
-
Multiple machines – Single drill operator on Surface at INCO’s Stobie MineBy P. V. Golde, R. A. Poole, G. R. Baiden
"The results being presented in this paper are those obtained during 1996 on a drilling automation project at Stobie mine. This project has successfully demonstrated that the remote operation of multi
Jan 1, 1997
-
Triboelectric Belt Separator for Beneficiation of Fine MineralsBy James D. Bittner
Separation Technologies, LLC (ST) has developed a processing system based on triboelectric charging and electrostatic separation that provides the mineral processing industry a means to beneficiate fi
Aug 1, 2013
-
Recycling of Nickel, Copper, Cobalt, and VanadiumBy Clemens Kuhnert
"Nickelhütte Aue GmbH is specialized in the recycling of waste materials containing non-ferrous metals. We treat nickel, copper, cobalt, vanadium, molybdenum and precious metal containing materials li
Jan 1, 2017
-
Implementation of an Advanced Thickener Underflow Density Control at Loulo Gold Mine, MaliBy D. Sagara, V. G. Makhado
"A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the
Jan 1, 2017
-
Local Content: Policy, Practice, and Emerging IssuesBy A. M. Esteves
This paper offers an overview of local content policies and practice in the mining sector. Specifically, the paper aims to answer the question of how national and regional governments, industry and ci
Aug 1, 2013
-
Microstructure and Mechanical Properties of AZ91D/SiC Mmc Produced by Compocasting Using an Inclined Cooling PlateBy R. G. S. Mussi
An inclined cooling plate is utilized as a modification in the compocasting process of magnesium alloy and the mechanical properties of the composites obtained are studied in this work. Based on cryst
Jan 1, 2006
-
Alstom Seawater FGD TechnologyBy M. Sagedahl
The off gas from a smelter is cooled and dust removed in an electrostatic precipitator before approximately 95% of the sulphur dioxide (S02) is converted to sulfuric acid. However, the tail gas may ne
Jan 1, 2007
-
Evaluation of On-Line Particle Size Distribution Measurement for Oil Sands Tailings TreatmentBy E. Sharifi, B. Komishke, R. Heffel, D. Schwartz
"The oil sands resources in Canada are one of the world’s largest hydrocarbon deposits. Processing of oil sands uses hot water to extract bitumen. The process generates tailings slurry that must be se
Jan 1, 2018
-
The Square-Set Method of Stoping at ButteBy J. B. Mawdsley
From the view point of the mining engineer, the square-set method of stoping as practised at Butte, Montana, is one ?of the outstanding features of well conducted mining operations in that camp. The f
Jan 1, 1925
-
Modules for the Underground MineBy O. Lundhede
Today, systems and machinery usually are designed to meet only one specific customer?s requirements. One reason for this is that underground automation and smart functions are often developed tightly
Aug 1, 2013
-
Application of Structural-Thermal Modelling to Negate the Need for Movement Joints within a Frozen Mine ShaftBy A. Pearson, Auld. F. A., S. O. Colbeck
"To minimise mine shaft maintenance over the long-term, some potash mine shaft sinking projects have required the provision of a continuous fully welded waterproof steel liner over a substantial depth
Jan 1, 2019