Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Technical and economic comparison of continuous and discontinuous loading in underground ore production and tunneling

    By Egon Berger

    "In recent years the trend in underground metal mining has been toward ever increasing blasts (often in excess of 100 000 tonnes per blast). The Canadian mining industry has been in the forefront of t

    Jan 1, 1989

  • CIM
    An Update on the Geology of the Lupin Gold Mine, Nunavut, Canada

    By P. A. Geusebroek, N. A. Duke

    Abstract - The Lupin mine, located in the central Slave province just east of the western boundary of Nunavut Territory, is a world-class example of a Neoarchean-aged banded iron formation (BIF)-hoste

    Jan 1, 2004

  • CIM
    In-the-hole drilling at Heath Steele Mines Limited

    By Errol Ladner

    The application of large-diameter bore holes in underground operations at Heath Steele was first tried in February, 1975. Since that time, 90,000 feet of 6-l/2-inch holes have been drilled, primarily

    Jan 1, 1979

  • CIM
    Safety Leadership in Tough Times (People)

    Safety Leadership The management and leadership of a mining operation is a challenge at all times. The pressure to make production, safety, and environmental goals is intense. At some point mini

    May 1, 2009

  • CIM
    Anomalies des propriétés de la matière organique et des assemblages argileux associés au gîte de Pb-Zn de Gays River, Nouvelle-Ècosse, Canada

    By Y. Héroux, A. Chagnon, M. M. Savard

    "Résumé - Le gite de Pb-Zn de Gays River s'accompagne d'anomalies des propriétés de la matière organique (MO) et des assemblages de minéraux d'argile (AMA). L'association entre la

    Jan 1, 1994

  • CIM
    Toward a gender-free mining industry

    By M. Phylli Bray

    "Mining has the reputation of being a very ""macho"" industry. Recently, wider educational opportunities for women in nontraditional occupations and changes in mine technology have combined to make mi

    Jan 1, 1995

  • CIM
    Co-Extruded Al4.5mg and Rapidly Solidified Al4.5mg1ag – Structure and Properties

    By C. J. Simensen, R. Østhus, H. J. Roven, K. G. Skorpen, H. Kalager

    "This work encompasses co-extrusion of alloy Al4.5Mg at the core and rapidly solidified Al4.5Mg1Ag forming the surface layer. The goal is to produce a multi-material by co-extrusion having a relativel

    Jan 1, 2018

  • CIM
    The Influence of Underground Voids on the Stability of Pit Wall Slopes ? A Probabilistic Approach

    By Kamran Esmaieli

    Open Pit Mining Through Underground Voids: Challenges Main Challenges/Hazards: Unexpected collapse of the pit floor and/or pit walls; The loss of equipment and/or people into underground voids;

    May 1, 2013

  • CIM
    The leachability of radium from uranium ores

    By K. E. Haque

    "Radium is selectively leachable from uranium ores with various types of lixiviants. Among a number of lixiviants tried on Midwest Lake uranium ore, KCl provided the highest per cent of radium extract

    Jan 1, 1987

  • CIM
    Simulation of Methane Distribution and Ventilation in Underground Mines: Potential for a Novel Intermittent Airflow System

    By J. C. Kurnia

    Methane is recognized as one of the prime causes of underground mine disasters around the globe. A cost-effective mine ventilation system and methane control is required to ensure a safe and productiv

    Aug 1, 2013

  • CIM
    Coxheath Copper Mine, Cape Breton, N.S.

    By W. W. Beaton

    The Coxheath copper mine is situated on the north side of the Coxheath hills and opposite the French Vale, at a distance of about 10 miles southwest of Sydney, Cape Breton county. The deposit was disc

    Jan 1, 1930

  • CIM
    Effect of Heat Treatments on Au ? Fe Oxide Catalysts for Low Temperature CO Oxidation

    By Matthew S. Hall

    Gold/iron oxide catalysts have been prepared and their catalytic performance evaluated for low temperature CO oxidation. The method and temperature used to dry the sample has a significant effect on t

    Oct 1, 2003

  • CIM
    Heat Balance Control Changes- Further Steps and Safety Issues

    By T. Kho, W. Zhang, M. E. Reed

    The control of flash furnace heat balances is critical. Suspension smelting control and stability comes from stable operation of the heat balance, and this leads to a stable reaction shaft exit temper

    Jan 1, 2019

  • CIM
    Expérience de la Mauritanie en matière d?environnement dans le secteur minier :1999 ?2010

    By Yolaine le Beau

    Plan de la présentation Le contexte mauritanien La situation de l?environnement en 1999 L?évolution de 1999 à 2010 Bilan La situation de l?environnement en 2011 Le contexte mauritanien Pays d

    May 1, 2011

  • CIM
    Geology of the Stratmat Boundary and Heath Steele N-5 Zones, Bathurst Camp, Northern New Brunswick (a6701408-1e86-4e3a-8ae3-4dfe8644a28d)

    By Art Hamilton

    The Zn-Pb-Cu-Ag ore deposits of the Boundary and N-5 zones near Bathurst, New Brunswick, occur in a polydeforrned volcano-sedimentary sequence that is part of the Ordovician Tetagouche Group. Massive

    Jan 1, 1992

  • CIM
    Conflict Impact Assessment Between Objects in a BIM System

    By Yi-Chun Lin

    Mechanical/Electrical/Piping (MEP) systems, due to their complexity and diversity, are the most intricate part of building construction. This being the case, Combined Services Drawings (CSD) and Struc

    Aug 1, 2013

  • CIM
    Ground geophysical investigations over the Casmo molybdenite deposit

    By A. Sacit Saydam

    "Induced polarization/resistivity and magnetometer surveys have been carried out over the Casmo molybdenite deposit in mountainous terrain of northern British Columbia. Molybdenite occurs in quartz-be

    Jan 1, 1983

  • CIM
    Stope development for raise mining at the Namew Lake mine

    By D. Madsen, B. Salamondra, A. Moss, D. Etienne

    "Raise mining at the Namew Lake Nickel Mine in Manitoba uses 3 m diameter bored raises driven at 45 to 50 degrees dip for stope access and drilling. These raises are developed within the orebody on 20

    Jan 1, 1991

  • CIM
    Reinforcement of Concrete Brick with Marble Waste

    By Zainelabdin Khalid Zainelabdin Elfaki

    The influence of partially replacing cement with marble waste on the workability and compressive strength of concrete bricks was investigated. Three replacement percentages, 10%, 20% and 30% weight ma

    Jan 1, 2014

  • CIM
    Large Flotation Cell Operation at Falconbridge Copper Limited – Opemiska Division

    By J. R. Maxwell

    In 1970 expansion was completed increasing mill capacity from 2,000 to 3,000 T.P.D. Actual grinding capacity is 3,400 T,P,D. at a grind of 60% -200 mesh,The ore bodies are vein type, containing about

    Jan 1, 1974