Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reliability Engineering and Replacement Theory -Aids to Maintenance DecisionsBy E. B. Wilson
"Although the Operations Research technique of Reliability Theory has been applied with marked success in many fields, including the Apollo spaceship programs, the concept of reliability has not been
Jan 1, 1970
-
An Overview of Inco's Copper Cliff OperationsBy J. R. Donald, K. Scholey
"Nickel has been mined and processed from the Sudbury basin for over 100 years. During this period, the process has evolved into what is one of the largest and most complex mining and metallurgical fa
Jan 1, 2005
-
Estimating Loading on Rebar Bolts Using Distributed Optical Sensing TechnologyBy D. Beneteau, L. Feldman, D. Milne, A. Hyett, G. Snell
"Behaviour of rebar bolts subjected to combined shear and bending in underground potash mining applications is not well understood. An experimental investigation compared load applied to resin-grouted
Jan 1, 2019
-
Thermodynamic Modeling of the Fe-RE Systems for the Application of RE in Fe-Nd-B Permanent MagnetBy I-H. Jung, J. Kim, B. Konar
"The usage of FeNdB permanent magnet, containing Rare earth elements (REEs), is steeply increasing with its demand for wind-turbine and electrical vehicle. The improvement and recycling of the permane
Jan 1, 2012
-
Optimizing the Design of Flotation CircuitsBy T. J. Bruce, G. E. Agar, R. Stratton-Crawley
"A technique by which the design of a flotation circuit may be optimized is described and examples of the application of this methodology are given.Three interrelated criteria are defined and the appl
Jan 1, 1980
-
Development of Corrosion-Resistant Low Alloy Steels for CommercializationBy B. Voyzelle
The deterioration of highway and bridge infrastructure has received considerable attention in recent years because of the billions of dollars needed for repair and rehabilitation. A major factor contr
Jan 1, 2005
-
Estimating Rock Mass Properties and Seismic Response Using Higher Order, Discontinuous, Finite Element ModelsBy D. A. Beck
The load-deformation response of discontinuous rock under static and dynamic loading conditions has been simulated using Explicit Finite Element models. The intent of the analysis was to investigate t
May 1, 2009
-
Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin FlonBy J. M. Cooper
The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick qu
Jan 1, 2007
-
An Initial Investigation into the Effect of Fe (III) Concentration on the Product Characteristics of Fe (III) Oxyhydroxide Precipitates during Lime PrecipitationBy Jochen Petersen, Alison Lewis, Cledwyn Mangunda
Run-off and waste water streams high in dissolved metal content are generated in all mining operations. The metals pose a threat to life due to their persistent bio-accumulative toxic (PBT) characteri
Jan 1, 2016
-
Atmospheric Fines Drying (AFD)By Nav Dhadli
Tailings from Oil Sands MiningWhat are they? Challenges Solutions Regulatory Environment Definition of the AFD Tailings Treatment Process 2010 AFD Pilot/Demonstration ProgramTechnical challenges
May 1, 2011
-
Advanced Control of Pressure Hydrometallurgical PlantsBy R. K. Jonas
"Pressure leaching and pressure oxidation in autoclaves are important alternatives in the extractive processing of gold, copper and nickel ores. The application of advanced control to pressure leach a
Jan 1, 2012
-
Increase of Productivity in a Magnesite Flotation Operation by Means of Selective MillingBy A. P. Yovanovic, P. Bonadia, M. N. Moraes, C. F. Matos
"The magnesite flotation operation of Magnesita Refractories, in Brumado – Brazil, has four parallel ball mills working in closed circuit with hydrocyclones to grind the ore for the reverse flotation
Jan 1, 2016
-
Effect of Ammonium, Sodium and Potassium Sulphates and Chlorides in the Pressure Acid Leaching of Western Australian Nickel Laterite OreBy B. I. Whittington
This paper examines the effect of cation type (i.e. NH4+, Na+ and K+) and anion type (i.e. SO42- and C1-) on the extraction of nickel during the pressure acid leaching of a Western Australian laterite
Jan 1, 2004
-
Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes
"The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat
Jan 1, 2017
-
Long Hole Blasting Practices in a Narrow Vein Deposit ? Experience from Agnico-Eagle?s Lapa MineIn most instances, the preferred mining methods in steeply dipping narrow vein deposits are selective methods such as cut and fill or shrinkage. The main advantage of these methods lies in the higher
Aug 1, 2013
-
Trends in Mercury Management in Gold ProcessingBy N. Ahern, M. Barbanell
Mercury is often present in gold ores and can be released during processing. In view of health and environmental concerns related to mercury, the mining industry takes leadership in the responsible ma
Jan 1, 2014
-
The Hydraulic Air Compressor ? a forgotten solution for mineral processing?By Dean Millar
Clean, green, cheap compressed air can be produced efficiently and renewably by modernization of a 19th century technology ?The hydraulic air compressor has no moving parts ?After commissioning, th
May 1, 2013
-
Giant's Milling OperationBy H. E. Pawson
Giant Yellowknife is located 600 air miles north of Edmonton on the north shore of Great Slave Lake in the Northwest Territories. In its 24 years of operation some 7,730,000 tons of ore have been trea
Jan 1, 1973
-
Ore Estimation Problems in an Erratically Mineralized OrebodyBy Gary Raymond
The Similkameen Division of Newmont Mines Limited operates a low-grade open-pit copper mine in southern British Columbia. The copper mineralization is extremely erratic.As a result, over seven years o
Jan 1, 1979
-
Pseudo-Equilibrium Coatings: An SRZ-Less Bond Coat System for a 5th Generation Nickel-Base SuperalloyBy K. Kawagishi, J. Ang, A. Sato, H. Harada
"We have recently proposed a new ""EQ Coating"" bond coat system to solve the problem of secondary reaction zone (SRZ) formation caused by bond coats applied on the hot section components of modem jet
Jan 1, 2006