Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Townsville Harbour Multi-Purpose CraneThe port of Townsville is situated on the main north/south rail system of the Queens- land Government Railways and is the eastern terminus of the east/west rail link from Towns- ville to Mount Isa.
Jan 1, 1974
-
Application of Synthetic Rainfall Data to Long-term Modelling of a Rehabilitated LandformBy G R. Hancock, D Verdon-Kidd, M J. Saynor, J B. C Lowry, T J. Coulthard
The ability to simulate the stability of post-mining landscapes over time scales ranging from decades to millennia is a critical element in the assessment of closure designs for uranium mines. Landsca
Jun 28, 2016
-
The Osborne CencentratorBy Hall K
The Osborne copper gold mine, 100 per cent owned by Placer Pacific Limited, is situated 195 kilometres south east of Mount Isa. The orebody is broadly categorised into three main ore zones; oxide, t
Jan 1, 1997
-
Introduction to the ProjectThe mining activities on the North Mine leases have, over the years, followed the orebody from the shallower depths at the southern end of the lease as it continued northwards at progressively increas
Jan 1, 1957
-
Explosion in A B.O.S. FurnaceOn Wednesday 11th November, 1970, a series of violent explosions occur-- red within No.1 Basic Oxygen Steelmak- ing (B.O.S.) furnace at the Whyalla Works of the Broken Hill Proprietary Co. Ltd., (B.
Jan 1, 1975
-
Charge Flow in Pulp LiftersEfficient performance of pulp lifters to discharge ground rock is critical to the effective performance of SAG and AG mills. The paper covers developments in the design of pulp lifters and associated
Jan 1, 2004
-
Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHASBy Thompson D, Burgess G. C
Subsequent to large scale trials in 1987, the installation of a submerged lance Sirosmelt furnace system was approved in late-1988 for the cupellation of retort bullion to dore silver. Commissioning
Jan 1, 1992
-
The impact of rip lines on erosion at the Ranger Mine SiteBy M J. Saynor, J B. C Lowry
The Ranger Uranium Mine is located in the wet-dry monsoonal tropics approximately 250 km east of Darwin in the Northern Territory of Australia (Figure 1). Mining of open-cut ore bodies commenced in 19
Jul 25, 2018
-
Mineralogical Studies at Mount Morgan, QueenslandDetailed studies of mineral paragenesis, isotope and trace-element geochemistry, and physical mineralogy at Mount Morgan are compatible with deductions by Geopeko Ltd geologists concerning field r
Jan 1, 1974
-
Improvements in Fine Coal Recovery at the Moura Mine of Theiss Dampier Mitsui Coal Pty. Ltd.By Rosentreter N
Difficulties with froth flotation recovery and vacuum de- watering equipment for the treatment of fine coal have been investigated. Mechanical alterations to cyclone desliming banks, and flotation
Jan 1, 1978
-
The Recovery of Gold from Ores by Ion Exchange ResinsIon exchange resins are an attractive alternative to activated carbon in both column and resin-in-pulp processes for the recovery of gold from cyanide solution. Resins are widely used for this purpose
Jan 1, 1984
-
Development Rates Using Conventional Continuous Miner Technology in Deep Underground Mines in AustraliaBy Misra A
The development of roadways in underground mines in Autralia is by conventional continuous miner technology. The rate of development achieved using this technology is improved by modifications to this
Jan 1, 1991
-
Designing the Optimal Flotation Circuit - The Prominent Hill CaseBy P J. Colbert, P D. Munro
OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl
Jan 1, 2009
-
Development of Drilling and Blasting Practices at The Vickery Coal MineBy Conley R, Payne I
The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation a
Jan 1, 1992
-
The Port Hedland Hot Briquetted Iron ProjectBy Bensley C. N
In June 1995, BHP announced that it would build a Hot Briquetted Iron (HBI) plant and associated beneficiation, materials handling and infrastructure facilities at Port Hedland, Western Australia. T
Jan 1, 1996
-
Project ManagementMining and metals projects have tended to increase in both scope and cost to a point where many projects are Droperly designated as superprojects. Specialist engineer- constructors have developed or
Jan 1, 1980
-
Development Of Open Stope Drilling Methods At The Selcast Mine, W. A.This paper looks at the various stages of development of open stope drilling techniques. Due to the structural nature of the orebodies mined by open stoping it has been necessary to review mining
Jan 1, 1977
-
Magnesia from Magnesite by Calcination/Carbonic Acid Leaching: Comparison of Several Australian MagnesitesBy Moorrees C, Koh P. T L, Tsambourakis G
Examination of Ihe calcination and carbonic acid leaching behaviour of a number of Australian magnesites shows that there are substantial differences between the massively crystalline and the cryptocr
Jan 1, 1985
-
Process-Data Acquisition in HydrometallurgyBy Canterford JH
Current and future methods of data acquisition in hydrometallurgy are reviewed. Hydrometallurgical operations involve a wide range of chemical and physical processes for the recovery of metals and oth
Jan 1, 1985
-
Mining Operational Effectiveness ù A Large Open Pit Mine Case StudyBy M D. Kuruppu
Fleet operational effectiveness is fundamental to any operation, becoming highly topical in mines experiencing less than optimal output from their fleets. It is an all encompassing aim to identify tho
Jan 1, 2003