Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Criteria for the Engineering and Construction by TBM of a Tunnel Under the Torre Annunziata (Italy) Built Up Area

    By Turco E, Pelizza S, Vona A

    Within the project against pollution in the Gulf of Naples (Italy) it was envisaged to build a sewage collection tunnel whose tunnelling section is about 30 m2 and whose length is over 4 km. The fo

    Jan 1, 1987

  • AUSIMM
    Tracking Hardness and Size: Measuring and Monitoring ROM Ore Properties at Highland Valley Copper

    By Dance A

    Highland Valley Copper recently implemented a system of measuring run-of-mine (ROM) ore properties and monitoring their effect on both mine and mill performance. These properties are principally ore

    Jan 1, 1998

  • AUSIMM
    Influence of the Sloping of Ground Surfaces on Mine Subsidence

    By Bhattacharyya AK

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the

    Jan 1, 1992

  • AUSIMM
    Technical Aspects of Reopening Gold Mines in Victoria

    By McCarthy PL

    Widespread interest in reopening Victorian gold mines, regenerated by increased gold prices, has highlighted the technical problems prevailing. A combination of historical lease legislation, minim

    Jan 1, 1982

  • AUSIMM
    A Model to Assess the Economic Characteristics of Base Metal Investment in Canada

    By Bilodeau M. L

    The paper describes a model which has been developed to assess the economic charac- teristics of base metal investment in Canada and the effects of past, present and possible future sharing systems,

    Jan 1, 1977

  • AUSIMM
    Monitoring of A Railway Tunnel Excavated Through Bouldery Soil

    By Thomson S, Eisenstein Z

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • AUSIMM
    A Review of Tower Milling at Hellyer

    By Anderson RJ

    Tower Mills are used at Aberfoyle's newly commissioned Hellyer base metal sulphide concentrator. Hellyer ore is particularly fine grained. To achieve adequate liberation fine grinding is necess

    Jan 1, 1991

  • AUSIMM
    Purification of Pressure Leach Liquor for Zinc Electrowinning - A Comparison of the Hematite and Magnetite Process for Iron Removal

    By Dixon D. R, Sparrow G. J

    Pressure leach liquors from the pressure oxidation of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore were treated to remove iron, either by pressure oxidation (the Hemat

    Jan 1, 1989

  • AUSIMM
    Mine closure bonds (financial assurances) – the ‘how much?’ conundrum

    By G Byrne, A Bowden

    There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha

    Jul 25, 2018

  • AUSIMM
    Geostatistical Study of a Lower Proterozoic Iron Orebody in the Pilbara Region of Western Australia

    By Shrivastava P

    The iron orebodies of the Pilbara region are formed by supergene enrichment of banded iron formation and rarely do such processes produce orebodies with uniform grade distrib- utions. The orebodies

    Jan 1, 1977

  • AUSIMM
    Discovery, Exploration, and Investigations of Phospate Deposits in Queensland

    Broken Hill South Limited's discovery of phosphate deposits in the northwest of Queensland in 1966 prompted intensive exploration which has proved phosphate rock in excess of 2,000 million tons a

    Jan 1, 1971

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    Milling Practice at Emperor Combined Mill

    The primary object of this paper is to describe the present metallurgical practice of the Emperor Combined Mill, wherein ores from the adjoining and Associated Mining Companies, Emperor Gold Mining Co

    Jan 1, 1953

  • AUSIMM
    Some Problems in Deep Open Cut Mining and their Solution by Goldsworthy Mining Limited

    The iron ore mining operations carried out by Goldsworthy Mining Limited at Golds- worthy, Shay Gap and Sunrise Hill, in the Pilbara region of the North-West of Western Australia, are unusual insofa

    Jan 1, 1979

  • AUSIMM
    Some Aspects of Longwall Ventilation in Australian Coal Mining

    By Savidis G

    The characteristics of 'Z' (Back-over run) and 'R' (Reverse) ventilation systems are dis- cussed in relation to their suitability for longwall mining. Experience in European mines

    Jan 1, 1983

  • AUSIMM
    A Positive Effect on Productivity - The Introduction of Breast Mining Techniques to Emperor Gold Mining Company Ltd, Vatukoula, Fiji

    By Harmse C

    Gold mining in Vatukoula had been a low tonnage/high grade operation for much of its 55-year life. During 1991 it became clear that a change in direction was needed if the mine was going to continue t

    Jan 1, 1993

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016