Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Characterisation of Microstructure and Mechanical Properties of Structural Mortar of Glass Insulators Employed in Transmission Lines

    By C K. Suzuki, J A. Yanaguizawa, D M. F de Santana, L R. P Leite, A H. Shinohara

    In the present work, the microstructure and mechanical properties of structural mortar from glass insulators were studied by X-ray fluorescence, X-ray diffraction, infrared spectroscopy, microhardness

    Jan 1, 2008

  • AUSIMM
    PITOPTIM: A New High Speed Network Flow Technique for Optimum Pit Design Facilitating Rapid Sensitivity Analysis

    By Carras S, Kelsey P, Caccetta L

    An important problem in open pit mine planning is that of detennining the optimum ultimate pit limits of the mine. These limits are that contour which is the result of extracting the volume of materia

    Jan 1, 1991

  • AUSIMM
    The Plant Process Audit, Mineral Electrodes and Metals Recovery

    By P Lamberg, M Lyyr, S Heimala, J Liipo

    Since the introduction of froth flotation for industrial practice, the process has long been developed and improved by making cultivated guesses or by using trial and error methods to a varying degree

    Jan 1, 2005

  • AUSIMM
    Vertical Crater Retreat Pillar Mining-A Case Study

    The Vertical Crater Retreat (VCR) mining method was used to mine two rib pillars at New Broken Hill Consolidated Limited (NEHC) mine at Broken Hill. Experience gained in a trial VCR pillar stope w

    Jan 1, 1983

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Effect of alkaline roasting conditions on the dephosphorisation of high-phosphorus iron ore

    By A Batnasan

    The main techniques for removing phosphorus as an impurity element in iron ores are physical separation (eg magnetic separation, flotation) and chemical separation (acid leaching, alkaline leaching an

    Aug 22, 2022

  • AUSIMM
    Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the Pit

    By D Gerrard, J Begelhole, J Gerber

    The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir

    Jul 13, 2015

  • AUSIMM
    After Blast Re-Entry Time for a Room and Pillar Operation

    By A Agasty, O Langefeld, MáKellner, E Clausen

    The lowering of the pollutant concentration limits at the workplace subjects the mining industry to higher requirements for dilution; this situation is worsened with the current discussions within the

    Jul 1, 2013

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Sampling for the percentage moisture in the iron ore industry

    By M Fritz, B Ziegelaar

    "For moisture samples, the International Standard for iron ore sampling states the following: Moisture samples shall be processed as soon as possible and test portions weighed immediately. If this

    May 9, 2017

  • AUSIMM
    Titanium Research at the University of Melbourne

    By Worner H. K

    The paper briefly summarises the work of the Titanium Research Section in the Metallurgy Department of the University of Melbourne and mentions the development of a new electrolytic process for titani

    Jan 1, 1956

  • AUSIMM
    New Life for the Argyle Diamond Mine – Block Cave Style and Beyond

    By D C. Ford

    The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation

    Aug 22, 2011

  • AUSIMM
    ROES® – Automated Rock Extraction

    By I Gipps

    A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur

    Nov 22, 2011

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Research Organization

    In considering the organization of research, it is necessary to know just what research is, what objects are in mind when setting out to conduct research, and what are the functional units which are r

    Jan 1, 1950

  • AUSIMM
    Managing mining fatality risk

    By P Nissen, T Jenke, M Ralph, M Cattani, M Quinlan

    The West Australian Government hold an annual ‘Mines Safety Roadshow’ around the State’s regions and the capital city, Perth. Each year presenters provide an update on legislation and safetyrelated th

    Apr 16, 2024

  • AUSIMM
    Dealing with uncertainties on mining equipment fleet planning and usage

    By I R. Souza

    At the mining industry, there are several uncertainties that may affect the mobile mining equipment fleet sizing and usage, such as commodity supply and demand, which impacts the mineral price, enviro

    Nov 8, 2021

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015