Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computerised Geological Information for Mine Planning at Mt ISA MineCopper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or
Jan 1, 1985
-
Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, QldBy Hare S. M, Lumsdaine I, O&apos
Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe
Jan 1, 1993
-
Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)An effective production control system should maximise recovery of economic material from the resource. To do this, internal waste must be accurately delineated and efficiently removed. Achieving
Jan 1, 1986
-
The Role of Rock Mechanics Models in Maximising Orebody RecoverySelection of mining methods, stope dimensions and stoping sequences is usually based on comparisons with other similar orebodies or rocktypes. Rock mechanics principles assist the process, which c
Jan 1, 1986
-
Fragmentation MechanicsThe mechanisms of fragmentation in homogeneous materials and structured rock mass are reviewed. A method previously used to predict vibration damage to the remaining rock is extended and shown to be
Jan 1, 1990
-
Evidence for, and Implications of,a Genetic Relationship Between MVT and SEDEX Zinc-Lead DepositsMssissippi Valley-type (MVT) and sedimentary-exhalative (SEDEX) zinc-lead deposits represent about half to three-quarters of the world's production and reserves of lead and zinc. The two deposi
Jan 1, 1993
-
Strategic Production Planning - The Economics of Managing Multiple Ore SourcesKambalda Nickel Mines (KNM) currently have eight operating underground mines, three on care and maintenance and other orebodies at various stages of development. Each operation differs greatly in sc
Jan 1, 1995
-
Metallurgical Operation at GunpowderGunpowder Copper Limited processes 1,000 tonne/day of Mammoth ore in a conventional flot- ation concentrator. Run of mine ore is prepared for flotation by three stages of crushing and two stages of
Jan 1, 1974
-
Manganese Changes in the Market PlaceBy Bourke J. H, Ashcroft T. B
Many changes have occurred in the world market for manganese over the last five years. Among these, the emergence of divided steel processes for the hot metal refining of pig iron is affecting the u
Jan 1, 1988
-
Experimental GalleriesThere is no other effective way for study ing firedamp and coaldust explosions than to produce controlled explosions in a pre-monitor- ed environment - either mine openings kept for the purpose, or
Jan 1, 1981
-
Museum Station -ConstructionBy Withington J. T
The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include
Jan 1, 1981
-
The distribution of gold between bullion, speiss, and slag during zinc-lead smeltingBy Holliday R, Floyd JM
A laboratory investigation was carried out to determine the distribution of gold between the products of lead-zinc concentrate smelting in the Imperial Smelting Furnace (ISF). Bullion, speiss and
Jan 1, 1986
-
Perimeter Blast Design at Mt Whaleback Mine, Newman, Western AustraliaThe Mt Whaleback open cut mine South Wall is, in part, developed as an unbenched dip slope. The remainder of the rock slope consists of asymetrical overturned folds which have been locally truncated
Jan 1, 1989
-
Measurement and Prediction of PbO Activities in Industrial Lead Smelting SlagsPbo activities have been measured in conventional blast furnace and direct smelting type slags at 1200¦C. Much higher activity coefficients than previously measured have been obtained and attribut
Jan 1, 1984
-
Application of Vertical Centrifugal Screen (V3 Separator) in Two-stage, Closed-Circuit Crushing System (CPC Process)In sizing of wet coal by the horizontal vibrating screen, screen openings to be used is much restricted, because coal is sticky and its bulk density is little. The electrically heated screen and o
Jan 1, 1984
-
Control of Product Variability in a Large Open Pit Iron MineBy Shrivastava P, Humphreys M, Guibal D, Deraisme J
Customer requirements concerning the final products of iron mines are extremely stringent. Because of this, there is an ever-increasing need for mine operators to monitor and strictly control the qu
Jan 1, 1994
-
Coolgardie Gold NL - William Ford Decline: Narrow Vein Sub-Level Up-Hole Mechanised Stoping and Long Hole Rise Blasting PracticesBy Will D
This presentation is to outline the current practice of mechanised stoping a one-metre wide, gold bearing ore body to optimise fragmentation, minimise dilution and reduce stoping costs.Coolgardie unde
Jan 1, 1993
-
OMEN - An Approach to the Optimisation of Methane Drainage SystemsBy Schofield D, Denby B, Stout F, Moli A
This paper documents the development of a user-friendly computational program, which has been constructed to assist the mine ventilation engineer in the optimal design and operation of methane drain
Jan 1, 1995
-
Geological mapping and logging at HellyerThe Hellyer deposit, hosted in the Cambrian Mt Read Volcanics, displays features typical of volcanogenic massive sulphide orebodies. These include a well developed stringer zone, metal zonation within
Jan 1, 1990
-
The Discovery of Cold - Silver Mineralisation at Binebase, Sangihe Island, IndonesiaBy Alwan M
At Binebase mineralisation is hosted within an andesitic Neogene volcaniclastic succession on Sangihe Island, Indonesia. Two major alteration types occur; an initial widespread phyllic assemblage of q
Jan 1, 1990