Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Research on supporting technology for production level roadways of block caving in Pulang Copper MineBy X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu
Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the
Nov 30, 2018
-
Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the CongoBy M G. Millad, M Zammit
The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa
Aug 18, 2014
-
Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock typeBy W F. E Ouedraogo
This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g
Jun 22, 2022
-
Thermodynamic Studies of Liquid Iron Alloys by a Mass Spectrometer Equpped with a Newly Developed Ion Current Measuring SystemBy Yamada K, Abe H
Magnetic scanning type mass spectrometers have been given improved sensitivity with a large dynamic range and considerable resolution by the addition of a computer-controlled electric equipment. A
Jan 1, 1980
-
Hellyer tailings – complex mineralogy but higher grade than many ore bodiesBy M Barden, G Lane, B Quilliam
NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing
Nov 21, 2018
-
Coarse processing of South African banded iron formation (BIF)By N Maistry, C Carelse, A Singh
Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are mainly composed of iron oxides (hematite and magn
Sep 18, 2023
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
The Underground Fire, Sealing and Subsequent Recovery of Liddell State Coal MineOn Monday, October 25th, 1971 at approximately 12.15 a.m. the night shift proceeding underground discovered smoke at No.1 and No-3 cut throughs on the eastern side of the belt heading and in close
Jan 1, 1972
-
Planning for Access to the Deep Copper Orebodies at Mount Isa Mines LimitedBy Slater R
The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The
Jan 1, 1982
-
A short review – hydrogen reduction of copper-containing resourcesBy M I. Pownceby, M A. Rhamdhani, D M. Fellicia, S Palanisamy, R Z. Mukhlis
The trend of global copper production has prospectively increased over time. Based on typical mined ore grades, 1 t of copper ore generates approximately 6–10 kg of copper, which requires much energy,
Jun 19, 2024
-
Extraction of gold from Stibnite OresBy Yan D. S
The removal of antimony from a refractory gold-bearing stibnite ore by roasting and selective chlorinating roasting was investigated. The influence of roasting temperature, roasting time, roasting a
Jan 1, 1995
-
The Legacy of Underground Coal Mining – Mine Subsidence: Ipswich Coal Measures Case StudyBy B W. Ham
The legacy of underground coal mining may be a land surface which, in parts, may be unstable in the long term. A case study analysis has been undertaken to explain some of the hazards and how the risk
Jul 16, 2014
-
Creating meaningful and measurable lead indicators for safetyBy A Gibbs
The mining sector has been a leader in investing in safety improvement initiatives, yet relatively few mining organisations can accurately track the positive effects of these initiatives or identify a
May 5, 2022
-
Mineralogical and Chemical Profile of a Gold RoasterBy Aylmore M. G
Samples have been taken from a two-stage industrial gold roaster treating a pyrite/pyrthotite/arsenopyrite concentrate, in order to describe the mineral- ogy, composition and surface area of the calc
Jan 1, 1991
-
Can robots break the drill and blast bottleneck in underground roadway development in hard rock?By M Berner, N A. Sifferlinger, E Fimbinger
Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p
Sep 1, 2024
-
Prediction of Roof Collapse for Rectangular Underground OpeningsBy A M. Suchowerska, J P. Carter, J P. Hambleton
"In order to effectively predict the roof collapse of underground openings using continuum models, it is imperative that a realistic failure criterion is used to represent the rock mass. However, for
Nov 5, 2014
-
Perspectives on the Canadian Mining IndustryBy D McKeon
In July 2006, ten Mining Engineering students and Associate Professor David Laurence from the University of New South Wales (UNSW) participated in the universityÆs inaugural overseas mining field trip
Jan 1, 2007
-
Occurrence of Outbursts at West Cliff CollieryBy Griffith L, Lama RD
West Cliff Colliery mines Bulli Seam occurring at a depth of approximately 480 m. The Seam is intersected by a number of small shear zones and faults. While the faults have caused displacement of t
Jan 1, 1980
-
The Marvel Loch Crusher Product Sampling SystemThe Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting
Mar 1, 2010
-
A New Approach to Flexible Open Pit Optimisation and SchedulingBy A Galli
Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee
Sep 26, 2011