Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computer-Based Resource Estimation in Accordance with the 1999 JORC CodeBy P Hanna
Following the Busang fiasco, more detailed guidelines were appended to the latest revision of the JORC Code released in September 1999 (JORC, 1999). Although the definitions and terminology essentiall
Jan 1, 2000
-
Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western TanzaniaBy M J. Nugus
The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF
Aug 22, 2011
-
TBM Design and Performance of Today - A Rapid Development - Where Will it End?The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more
Jan 1, 1993
-
Gold Room Procedure at Lake View and Star, Ltd.Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des
Jan 1, 1948
-
The experimental study on propagation of pressure wave in underground mine ventilation systemBy Y Shougu
Many mine accidents will affect the mine ventilation system when they occur. At present, there is a lack of monitoring means to capture the occurrence of accidents in time by monitoring the ventilatio
Oct 12, 2022
-
Influence of Shot Design Parameters on FragmetationBy Smith N. S, Rholl S. A, Otterness R. E
The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra
Jan 1, 1990
-
Broker's Rules of Thumb for Mineral Valuation: A Focus on Gold EquitiesBy Dodd SF
Valuation of mining companies and their underlying assets prepared by brokers' analysts are, by necessity, approximations. The reliability of the valuations is entirely proportional to the qua
Jan 1, 1994
-
Dynamic Simulation of Size Reduction Operations from Mine to MillBy Pate W. T
This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone
Jan 1, 1998
-
Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologiesBy E Amini, N Beaton
Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre
Nov 10, 2020
-
Modelling Blast Movement for Grade Control at an Open Cut Gold MineBy E J. Sellers, A Cocker
Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref
Aug 18, 2014
-
Paste Backfill for Enterprise MineBy D Morrison, P Goodman
The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur
Jan 1, 1998
-
Mining Scenario Analysis and Mine Variable ValueBy B E. Hall, J Poniewierski, A J. Hills
Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea
Mar 24, 2014
-
The Design and Operation of a New Ventilation System at the Zinc Corporation Limited and New Broken Hill Consolidated LimitedIn 1948, it became clear that the ventilation system of The Zinc Corporation Limited and New Broken Hill Consolidated Limited mines, would be inadequate for future operations. The,paper describes in d
Jan 1, 1956
-
Is Measuring pH Enough?By J Kinal, I Mitchell
Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased
Jan 1, 2006
-
AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years onBy J Missen, P Currie, J Bohan, D Clark
AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates
Jun 22, 2016
-
What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?By D Connelly
Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi
Jul 13, 2015
-
A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’By P Revell, B Adair, D King, L Keeney
Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection
Nov 10, 2020
-
Problems Associated with Sampling and Assaying for Gold in Mill Feed at Peko Mines Ltd.Prior to 1972, Peko Mines Limited at Tennant Creek used a central mill at Peko, which consisted of a gravity circuit, flotation and cyanidation of tailings, to treat their gold ore from surroundin
Jan 1, 1978
-
Sampling and blending in geoenvironmental campaigns – current practice and future opportunitiesBy A Parbhakar-Fox, S C. Dominy
The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact
May 9, 2017
-
Coal Resources of Western AustraliaDespite the large areas of sedimentary basins in Western Australia, the coal resources are very meagre., This is a serious problem for the State, which-at present-lacks any other alternate source o
Jan 1, 1964