Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms

    A major problem in open pit mine planning is to determine the optimum pit limit of the mine. The optimum pit limit is the one with maximum discounted net profit and satisfies technical conditions. A n

    Dec 6, 2010

  • AUSIMM
    Mesozoic Metallogeny in East China and Their Geodynamic Processes

    By G Q. Xie, J W. Mao, Y B Cheng

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The East China Mesozoic metallogenic province hosts the world’s largest resources of tungst

    Mar 18, 2015

  • AUSIMM
    Economic Impact Evaluation of Spoil Dump Reshaping Practices (Australia)

    By W C. Burton, J S. Kuszma, T O. Aspinall

    The environmental impact of mining and evolving environmentallegislation has received increased attention worldwide in the last two decades (Bradfield, Shultz and Stone, 1996). The potential impacts a

    Jan 1, 2000

  • AUSIMM
    Study on the Mineral Processing Technology of Low-Grade Refractory Lead-Zinc Oxide Ores Containing Argillaceous and Carbonated Gangue in Yunnan

    Study on the Mineral Processing Technology of Low-Grade Refractory Lead-Zinc Oxide Ores Containing Argillaceous and Carbonated Gangue in Yunnan

    Sep 13, 2010

  • AUSIMM
    Geochemical Studies in the Coromandel Peninsula - The Use of Calcium in Stream Sediments as a Guide to Alteration

    Acid soluble calcium is depleted in drainage sediments from hydrothermal alteration centres in the Coromandel Peninsula. The routine analysis of acid-soluble calcium on drainage samples is an economic

    Jan 1, 1979

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    A review of ventilation and gas management in underground mines

    By A Self, B Robertson

    During 2015 and 2016, the authors conducted a number of surveys, workshops and reviews of ventilation and gas management practices in Australian underground coalmines. The study was funded by ACARP wi

    Aug 28, 2017

  • AUSIMM
    The Role of Mineral Processing in the Development of Cement with Low Carbon Emissions

    The Role of Mineral Processing in the Development of Cement with Low Carbon Emissions

    Sep 13, 2010

  • AUSIMM
    The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South Australia

    Geotechnical conditions in the Lochiel Deposit are somewhat unusual, and thus geotechnical and hydrological investigations have assumed a high priority. The cost of mining the deposit has been sho

    Jan 1, 1986

  • AUSIMM
    Copper Skarn Deposits in Eastern China

    In eastern China, most of the copper skarn deposits occur in folded troughs which are controlled by the EW-trending faulted fold systems (the Pal-Asian geotectonic domain), and the NNE-trending rift o

    Jan 1, 1995

  • AUSIMM
    Planning of Open Cut Mining

    The increased cost of imported oil fuels, coupled with our understandable reluctance to commit ourselves to the use of nuclear energy, has resulted in a renewed reliance on coal as a primary source of

    Jan 1, 1976

  • AUSIMM
    Economic Potential of Basement Tertiary Quartz Gravels in the Upper Manuherikia Valley

    As the theme of the conference is ære-discover Otago' from the minerals point of view, it is also timely. Of the eight million ounces of gold recorded produced from Otago, perhaps a quarter of th

    Jan 1, 1992

  • AUSIMM
    Reason Analysis of Impurity Containing and Technology Discussion of Quality Improvement for Low-Quality Iron Concentrate

    Reason Analysis of Impurity Containing and Technology Discussion of Quality Improvement for Low-Quality Iron Concentrate

    Sep 13, 2010

  • AUSIMM
    Iron Concentrate Synthesised from Waste Ferrous Sulfate Produced in Titanium White Preparation

    Iron Concentrate Synthesised from Waste Ferrous Sulfate Produced in Titanium White Preparation

    Sep 13, 2010

  • AUSIMM
    The Australian Equity Market as a Source of Capital for Pacific Basin Mineral Development

    One of the major changes in the resource industry in the nineties has been the re- internationalisation of the industry. The history of the resource business has been one of companies from the develop

    Jan 1, 1995

  • AUSIMM
    Steel and Iron Ore Scenario - An Indian Perspective

    India is on fast economic growth. Even in the turbulent years of global crisis, it could achieve a growth of over eight per cent. In recent past, Indian Government has been contemplating a faster grow

    Dec 6, 2010

  • AUSIMM
    Copper Refining and Production of Semi-fabricated Products at Copper Refineries Ltd

    Within CRLÆs lifetime there have been a number of products that have proceeded through their life cycles. In each case market forces and technological advances have forced the cessation of the product

    Jan 1, 1998

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    Spectroelectrochemical Investigation of Hydroxamate Reagents on Copper Oxide Minerals

    Spectroelectrochemical Investigation of Hydroxamate Reagents on Copper Oxide Minerals

    Sep 13, 2010