Search Documents

  • SAIMM
    Getting The Balance Right ? Some Practical Design Considerations For Solvent Extraction Circuits

    By G. Laing

    On scheduled commissioning and effective operation of a solvent extraction circuit relies on getting the design of both the core contact equipment and the peripheral plant right. Experience has shown

    Jan 1, 2002

  • SAIMM
    An Overview Of Current Manganese And Chromium Ferroalloy Production In Russia

    By V. I. Zhuchkov, L. A. Smirnov, E. I. Arzamastsev, A. A. Babenko

    A brief analysis is given for state-of-the-art of manganese and chromium ferroalloy production in Russia and their consumption by metallurgy plants. The main causes of low output of manganese an

    Jan 1, 2004

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • SME-ICGCM
    Seismic Tomography For Longwall Stress Analysis

    By E. C. Westman

    Anomalous geologic or stress-induced conditions can create a hazardous working environment for underground miners. Seismic attenuation tomography provides a valuable tool for understanding static and

    Jan 1, 1996

  • CIM
    High-pressure direct injection of natural gas in a diesel engine for high performance/low emissions (ace69f9b-8abb-4cd4-9306-9db2c42ce4ca)

    By K. B. Hodgins, P. Ouellette

    "The North American mining industry faces challenging emissions regulations in the coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, indu

    Jan 1, 2005

  • IIMP
    Technical Evaluation of batch process and continous process for the production of cemented pasted backfill

    By Emmanuel Portilllos

    Every paste backfill system is typically unique, this being due to the particular tailings characteristics, the backfill recipe and requirements of mine planning. Key to successful transport to the un

    Sep 9, 2007

  • SME
    Simulation Modeling Validates Load and Haul Requirements at Cortez Gold Mines

    By W. L. Jacobsen, T. L. Dyer

    Cortez Gold Mines completed a feasibility study for a new openpit gold mine in north central Nevada. The production schedule calls for a peak in material movement. This schedule is based on current op

    Jan 1, 2007

  • NIOSH
    CO Dispersion From A Coal Fire In A Mine Entry

    By R. A. Franks, G. F. Friel, J. C. Edwards, L. Yuan

    Five mine fire experiments were conducted in a 2.08m high and 2.90m wide, ventilated mine entry in the National Institute for Occupational Safety and Health (NIOSH)'s Safety Research Coal Mine (S

  • AUSIMM
    Structures and Field Relations of Epidiorite Dykes in the Broken Hill Orebody

    A study of literature on the epidiorite dykes which transgress the Broken Hill lode and its wall rocks reveals a considerable diversity of thought regarding the time of emplacement of such dykes. In t

    Jan 1, 1968

  • AUSIMM
    The History of Ore Treatment Processes in Broken Hill

    WHEN mining and treatment first started at Broken Hill only oxidised ores were available. These ores were rich in silver and lead-the silver mainly existing as chloride and the lead as carbonate.Treat

    Jan 1, 1928

  • ISEE
    Application of the Blast Fragmentation Models in a Sandstone Quarry

    By Türker Hüdaverdi, Özge Akyildiz

    "In this research, image analysis technique, Kuz-Ram and KCO Models were used to examineefficiency of the quarry blasts. Investigations were performed in Cendere region, Istanbul. As a firststep, imag

    Jan 1, 2016

  • AUSIMM
    Deep Well Pumping as an Aid To Shaft Sinking at Mount Isa Mines Limited

    The association of deep well turbine type pumps with metal mining is by no means a new one, though undoubtedly each application has certain features of interest, conformable with attendant circumstanc

    Jan 1, 1939

  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017

  • DFI
    Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?

    By J. A. Hayes

    For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d

    Jan 1, 2003

  • SME
    Contact Angles Of Powders From Heat Of Immersion

    By I. Yildirim

    Water contact angles of talc powders were determined from the values of the heats of immersion measured using a flow microcalorimeter. The results were used to calculate the contact angles using a ri

    Jan 1, 2001

  • SME
    Field-Scale Investigation Of Pulverized Coal Mill Power Consumption

    Twenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study

    Jan 1, 2008

  • NIOSH
    IC 8654 The Bureau Of Mines Minerals Availability System And Resource Classification Manual

    This Information Circular describes the Bureau of Mines Minerals Availability System (MAS), presents the Resource Classification Manual used for information input to a computer file, and discusses the

    Jan 1, 1974

  • AUSIMM
    Nucleation and Early Growth Pertinent to Near Net Shape Casting

    By Dippenaar R, Evans T

    Twin-roll continuous casting technology is rapidly approaching commercialisation. Fundamentally different than conventional continuous casting, heat transfer and hence solidification during twin-rol

    Jan 1, 1999

  • CIM
    Enhancing Cobalt Recovery from Copper/Nickel Matte Producing Smelters

    By V. I. Lakshmanan

    Process Research ORTECH Inc. (PRO), with its in-depth knowledge on cobalt behaviour in nickel matte smelters and its novel mixed chloride hydrometallurgical processing, is developing a hybrid process

    Jan 1, 2019

  • IIMP
    Adopción tecnológica integral en la gestión de Atacocha

    By Francisco Gallo

    La transformación de una empresa no solo depende de la capacidad de compromiso y cambio de la alta gerencia, sino se relaciona con la adopción de una tecnología iexitosa que transmita a la organizació

    Sep 13, 2001