Search Documents

  • SME
    Extensible Conveyor Systems For Long Tunnels Without Intermediate Access

    By Dean Workman

    Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel

  • SME
    Ice-Cemented Backfill For Underground Support In Arctic Mines

    By V. Izaxon

    Current practice in mining frozen, underground placers is to support the mine openings by leaving remnant pillars, which are kept frozen to maintain their stability. These pillars may be partially ext

    Jan 1, 2004

  • DFI
    Soil Plug in Open Ended Pipe Piles Embedded in Sand

    By Mohammed Y. Fattah, Wissam H. S. Al-Sudani

    "During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration

    Jan 1, 2014

  • DFI
    Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line

    By Suk han Jang

    This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This

    Jan 1, 2007

  • SME
    Industrial Minerals 2004 – Calcium Carbonates

    By J. Yuan

    Ground calcium carbonate (GCC) and chemically precipitated calcium carbonate (PCC) have become important mineral-based commodities in recent years. GCC manufacturing generally requires high purity and

    Jan 1, 2005

  • AUSIMM
    Broken Hill Vughs-Occurrence and Some Probable Causes

    Although these subterranean cavities are common to the Broken Hill big lode, yet the Broken Hill Proprietary is the most prolific in their occurrence, loud they have been found of various dimensions a

  • SME-ICGCM
    Characteristics of Coal Bursts in the North Fork Valley of the Gunnison River Valley, Colorado

    By Christopher Mark

    A coal burst is defined as the sudden, violent ejection of coal or rock into a mine opening. Coal mines in the North Fork Valley (NFV) of Colorado?s Gunnison River have a long history of coal bursts i

    Jan 1, 2012

  • SAIMM
    Recent Improvements In The Kumera Steam Dryer

    By J. Talja

    Keywords: drying, steam drying, concentrates, copper, lead During the past twenty years steam drying has become a prominent technology for drying of non-ferrous metals concentrate. This is mainly

    Jan 1, 2011

  • AUSIMM
    Cyclone Process for Heavy Metals Decontamination of Sediments

    Cyclone Process for Heavy Metals Decontamination of Sediments

    Sep 13, 2010

  • NIOSH
    Mechanical Concentration Of Gases - I. Introduction

    The problem of separating the constituents of a mixed gas has assumed increasing importance to chemical technology during the last several decades. Metallurgical practice, dealing mostly with the appl

    Jan 1, 1940

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • AUSIMM
    Heat Transfer Mechanism in Ignition of Nickel Sulphide Concentrate under Simulated Flash Smelting Conditions

    For small particles of niekel flotation eoncentrate (av. size 50 pm) the predominant heat transfer mechanism under suspension smelting conditions, prior to ignition, is conduction from the gas and not

    Jan 1, 1979

  • CIM
    Aspects of Tailings Reclamation in Ontario and Quebec

    By E. M. Watkin

    "Land directly disturbed by hard rock mining activities in Ontario and Quebec was surveyed in 1974 as part of a country-wide assessment, (Murray 1977). Some 15, 000 hectares, or 5 7 square miles, are

    Jan 1, 1980

  • ISEE
    Rapid Chemical Destruction of Explosives in Various Materials by MuniRem®

    By Charolett Hayes, A. L. Russell, Anthony J. Bednar, Jared Smith, Valentine A. Nzengung, Stephen L. Pilcher

    The manufacture of Energetics Materials (EM), including maintenance and demilitarization of munitions causes dangerously high levels of explosives residues to be harbored in building features. The two

    Jan 1, 2016

  • DFI
    Winter Marine Construction In Northern Alberta - Construction Of Baffle Walls Sundance Cooling Pond Expansion Sundance Generating Plant Wabamun, Alberta, Canada ? Introduction

    By Robert R. Morrison

    Alberta Piling Contractors very rarely are required to perform major marine construction in the prairies, so it became as a big surprise to AGRA Foundations Limited to be invited by Transalta Utilitie

    Jan 1, 1997

  • AUSIMM
    Pit Water Management in a Mine Planning Cycle, Olympic Dam Case Study

    By D Barclay, S Mercer, S Wright

    Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I

    Jan 1, 2009

  • CIM
    Root-Cause Analysis of the Lacy Copper Phenomenon

    By R. Ramírez, N. Aslin, G. Ríos, T. Bravo, A. R. Almansa

    Lacy copper has been an on-going concern at Atlantic Copper for at least 10 years and was first reported to Glencore Technology in mid-2010. Over the past 12 years, many of the plates were replaced du

    Jan 1, 2019

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011