Search Documents

  • SME
    Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

    By Samuel J. Gambino

    Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p

    Jan 1, 2008

  • ISEE
    Borehole Inspection with the HRS-1 Video System

    By Tom Palangio, Ralph M. Olmstead

    Video inspection of boreholes with cameras developed specifically for the mining industry is now possible. These designs are reliable, cost effective, and have the flexibility to be used in other appl

    Jan 1, 1998

  • SME
    MADIQ Tunnel, Lebanon: TBM Tunneling Vs. Karst Geology

    By William D. Leech

    Lebanon used a TBM for the firsttime to excavate a tunnel in the country. A main beam TBM, built in 1979, bored the 3.8 m (12.5-ft) diameter by 4,020 m (2.5-miles) Madiq Tunnel. The TBM bored through

  • CIM
    The Texasgulf Concentrator Expansion

    By A. M. Hill

    "This is an account of the expansion of Texasgulf's Timmins concentrator by the building of a fourth circuit.The original capacity of the mine and concentrator was 3.6 million tons per year of ore. In

    Jan 1, 1979

  • SME
    Recovering Gold From Carbon Fines By Gold Transfer Process

    By E. M. Hill, H. K. Lin, J. L. Oleson

    When activated carbon is used for recovering gold in gold industry, carbon fine materials are generated in stripping, acid-washing and kiln regeneration circuits. The carbon fines at the Fort Knox mi

    Jan 1, 2002

  • NIOSH
    Fatal Injuries In The Mining Industry: Census Of Fatal Occupational Injuries

    An examination of the Census of Fatal Occupational Injuries (CFOI) data for the period 1992-1995 shows that 659 fatalities occurred in the mining industry as defined by the SIC. Oil and gas accounted

    Jan 5, 2000

  • SME
    Future Supply Of Silver And Gold

    By Gordon M. Miner

    When I was originally invited to speak to this audience on the subject of the future supply of precious metals I was somewhat apprehensive and suggested that the Program Chairman select someone with m

    Jan 1, 1980

  • SME
    Statistical Methods Of Estimating Mining Costs

    By K. R. Long

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and

    Jan 1, 2011

  • AUSIMM
    Modern Asset Pricing - A Valuable Real Option Complement to Discounted Cash Flow Modelling of Mining Projects

    By R Garzon

    For resources projects with healthy net present value (NPV) and low cash flow volatility, conventional discounted cash flow (DCF) analysis will continue to provide the dominant investment decision-mak

    Jan 1, 2007

  • SME
    Ventilation On Demand - Study For Room And Pillar Mining In Flat Seams

    By S. Noll

    Ventilation is an essential part of any underground mining operation. It provides fresh air for workers and machinery, keeps up an adequate mine climate and dilutes and dissipates noxious gases. Possi

    Feb 27, 2013

  • AUSIMM
    Drilling Equipment for Difficult Coring Conditions A New Type Core Lifter and Triple Tube Core Barrel

    Considerable improvements in diamond drilling equipment have been made since the early 1950s. A recent drilling programme, however, at Williamtown, near Newcastle, carried out by the Joint Coal Board

    Jan 1, 1967

  • ISEE
    Trench Blasting in Close Proximity to Existing Utilities in Ultra Metamorphic Rock (705d7ae2-b943-4f91-9b2f-b06e02816eba)

    By Tom Treleaven, Andrew Williams

    Several contracts were let in Greenwich, Connecticut, for the installation of a sanitary sewer. The majority of the excavation was in rock and involved numerous challenges due to the following condit

    Jan 1, 2003

  • ISEE
    Speedwave - A New, Multichannel, High Resolution, High-Speed Blast Monitor for Near and Far Field Monitoring Applications

    By Christopher Cloete Uys, Luis Manuel Poinha Valentim

    The purpose of this workshop is to describe and demonstrate the use of SPEEDWAVE, a high speed data recorder, its VOD enhancements, and the software which binds the system together. The system was des

    Jan 1, 1995

  • NIOSH
    Methods For Controlling Explosion Risk At Coal Mine Working Faces

    By Fred N. Kissell, Jerry C. J. Tien, Edward D. Thimons

    At coal mine working faces, simultaneous application of three basic elements reduces the methane explosion hazard: (1) adequate ventilation, (2) regular monitoring of gas concentrations, and (3) the e

  • AUSIMM
    Transformation of Iron Oxide By-products During the Becher Process

    By Muir DM, Ritchie IM, Gibbons SL

    Fundamental studies on the transformations of iron oxides have been carried out and related to the solution conditions in the Becher Process. The results show that a number of iron oxide interconve

    Jan 1, 1989

  • SME
    Moly Plant Design Considerations - Preprint 09-136

    By P. Amelunxen

    This paper presents the authors? personal experiences in the design and operation of moly separation circuits in copper-moly concentrators. Topics discussed include column cells versus mechanical cel

    Jan 1, 2009

  • CIM
    A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration Process

    The construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent

    Jan 1, 1979

  • AUSIMM
    Williamstown Industrial Mineral Deposits - A New Lease of Life

    By Olliver J. G

    Over 400,000 tonnes of kaolin, sillimanite, mica, kyanite, feldspar and rutile have been mined from the unique Williamstown orebodies since their discovery in the early 1900's. Numerous compan

    Jan 1, 1989

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995

  • CIM
    The development of process mineralogy at Falconbridge Limited and application to the Raglan Mill

    By J. S. Stickling, P. J. Whittaker, N. O. Lotter

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002