Search Documents

  • ISEE
    Quarry Blasting is Boring

    By Darcey Baker

    Quarry Blasting is usually boring, and that is how we like it. By this, boring means routine, straightforward, meat and potatoes blasting. Quarries typically will not utilize cast blasting, coyote tun

    Jan 1, 2009

  • SME
    China Featured at the Minnesota Conference

    By William R. Yernberg

    The combined 79th Annual Minnesota Section of SME Meeting and 67th Annual University of Minnesota Mining Symposium was held April 11 and 12, 2006, in Duluth, MN. About 300 mining professionals attend

    Jan 1, 2006

  • TMS
    Effect of EAF Slag Carryover on Slag-metal Equilibrium Calculations for Ladle Degassing Process

    By H. Doostmohammadi

    During the tapping of liquid steel from Electric Arc Furnace (EAF), some slag is carried over into the ladle. High levels of FeO and MnO in slag carryover increase the oxygen activity in steel melt le

    Jan 1, 2009

  • CIM
    Maboumine Process: A Promising Process for Developing a Polymetallic Ore Deposit - Focus on the Downstream Part of the Process: Rare Earth Recovery

    By S. Belair, V. Weigel

    As a growing mining company, ERAMET is looking for new positions on the strategic metals market. In this context, the Gabonese Maboumine pyrochlore deposit is currently being studied for the recovery

    Jan 1, 2014

  • ISEE
    A Practical, Yet Technically Sound, Design Procedure for Pre-Split Blasts

    By William Hustrulid

    Pre-split blasting is a primary technique for creating slopes with a minimum amount of unwanted damage to the remaining rock mass. Rock slopes created in such a way have both safety-related and econom

    Jan 1, 2007

  • NIOSH
    Characteristics Of Mining-Induced Seismicity Associated With Roof Falls And Roof Caving Events

    By M. C. Chapman, P. L. Swanson, A. T. Iannacchione

    The National Institute for Occupational Safety and Health (NIOSH) evaluated microseismic activity from three field sites to compare and contrast the characteristics of microseismic emissions from very

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • AUSIMM
    Notes on the Phillips River Gold and Copper Field

    THE Phillips River gold and 'copper field is situated on the south coast of Western Australia, about 200 miles east of Albany, 180 miles west of Esperance, and: 250 miles south of Southern Cross,

    Jan 1, 1917

  • IMPC
    Improving Mine and Metallurgical Performance Using: Data Unification and Measurement Management

    By Osvaldo A. Bascur, J. Pat Kennedy

    "The profitability of mining and metallurgical operations continues to lag behind that of other industries despite the technical advances that have occurred in recent years. A primary reason for poor

    Jan 1, 2003

  • AUSIMM
    And Still we did not get a Permit

    This paper reviews recent positive developments in Europe on the regulation of gold mining. However, it also examines the problem that while gold projects may be bankable and technically and environme

    Jan 1, 2007

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • CIM
    Suivi non-destructif de l?évolution de la résistance mécanique des remblais cimentés en pâte: application de la résistivité et de la micro-sismique en laboratoire

    By Serge Ouellet

    Résumé Six modèles métriques de remblai cimenté en pâte (RCP) ont été suivis durant 120 jours par l?utilisation de deux méthodes géophysiques non-destructives : la résistivité et la micro-sismique.

    Feb 1, 2008

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • SME-ICGCM
    Developments of a Prototype Borehole Profilometer to Estimate Roof-Bolt Anchorage Capacity from Borehole Roughness Measurements-Laboratory Tests

    By Mark K. Larson

    Researchers at the National Institute for Occupational Safety and Health?s (NIOSH) Spokane Research Laboratory are developing a borehole profilometer to dynamically measure the roughness pro-file of b

    Jan 1, 2007

  • DFI
    An Innovative Approach To Load Testing Of High Capacity Piles

    By P. Bermingham

    A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma

    Jan 1, 1989

  • CIM
    An Evaluation of Flotation Reagents at the Majdanpek Copper Mine

    By P. V. Avotins, I. Djurkovic, D. R. Nagaraj, M. Grunjic, A. Day

    "As part of a major reconstruction and expansion of the Majdanpek Copper Mine, an investigation and optimization of the flotation collector regime was undertaken. The flotation response of the major m

    Jan 1, 1992

  • SME
    Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone Technology

    By R. Bokotko, J. D. Miller, J. Hupka

    Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption

    Jan 1, 2002

  • NIOSH
    IC 6956 Coal-Mine Explosions In Ohio, 1874-1936 - Introduction

    By C. W. Owings

    The number of major coal-mine explosions occurring annually in the United States is decreasing, due mainly to fuller recognition of explosion hazards in coal mines and knowledge of methods to prevent

    Jan 1, 1937

  • SME
    Advances In The Practical Implementation Of Indicator Geostatistics

    By Clayton V. Deutsch

    Indicator Kriging (IK) is being commonly applied to mineral resource assessment problems. More recently, indicator simulation has also been used for sensitivity analysis and difficult change of suppor

    Jan 1, 1992

  • AUSIMM
    Science Technology and the Mineral Industry Mines and Universities û A Vital Link

    Engineering education has become a matter of national concern, at last, so I would like to talk about the links between the mining industry, the universities and technological developments. The Austra

    Jan 1, 1989