Search Documents

  • AIME
    Geophysics - Geophysical Activities in 1945 and the Geophysicists' Part in the War

    By C. A. Heiland

    THIS year's review of geophysical activities has a somewhat different complexion than usual. With the ending of the war, the time seems opportune to supplement the customary report on operations

    Jan 1, 1946

  • NIOSH
    Machine Injury Prediction by Simulation Using Human Models (0111a15c-4251-44e2-bc90-9d29854de8ad)

    By Dean H. Ambrose

    This paper presents the results of a study using computer human modeling to examine machine appendage speed. The objective was to determine the impact of roof bolter machine appendage speed on the li

    Jan 1, 2003

  • AUSIMM
    Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone

    By D Hill

    In the Ngakuru area zeolite deposits occur in late Quaternary lacustrine vitric tuffs of the Ngakuru Formation and two of the deposits are being mined. The Ngakuru Formation overlies the Ohakuri Ignim

    Jan 1, 2005

  • AUSIMM
    Presidential Address, 1969 The Australian Coal Industry - Present Status and Position in the National Economy

    My selection of the Australian coal industry as the theme of this Presidential Address arose from the fact that it is one of our most important mineral industries. The industry is presently prospering

    Jan 1, 1969

  • DFI
    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014

  • IIMP
    Technical Evaluation of batch process and continous process for the production of cemented pasted backfill

    By Emmanuel Portilllos

    Every paste backfill system is typically unique, this being due to the particular tailings characteristics, the backfill recipe and requirements of mine planning. Key to successful transport to the un

    Sep 9, 2007

  • SME
    Planning to meet the required DPM concentration levels in underground mines ? a calibration model

    By k. Osei-Boakye

    This paper presents the calibration of a real-time aerosol monitor, the TSI DustTrak?, to the NIOSH 5040 method being used by the Mine Safety and Health Administration (MSHA) for compliance enforcemen

    Jan 1, 2009

  • SME
    Enhancement Of Bacterial Iron And Sulfate Respiration For In-Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study

    By James M. Harrington, A. Azra Bilgin, JoAnn Silverstein

    The prevention of AMD in situ is more attractive compared to subsequent downgradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the micr

    Jan 1, 2005

  • SME
    The effects of ventilation controls and environmental cabs on diesel particulate matter concentrations in some limestone mines

    By J. D. Doll

    MSHA has promulgated a rule to limit the exposure of underground metal/nonmetal miners to diesel particulate matter (DPM). In May 2008, the final personal exposure limit will be lowered to 160 µg/m3 t

    Jan 1, 2009

  • SME-ICGCM
    Seismic Tomography For Longwall Stress Analysis

    By E. C. Westman

    Anomalous geologic or stress-induced conditions can create a hazardous working environment for underground miners. Seismic attenuation tomography provides a valuable tool for understanding static and

    Jan 1, 1996

  • SAIMM
    Annual Report - For The Year Ended 30th June, 1999

    Council for 1999/2000 President J.R. Dixon President Elect M.H. Rogers Vice Presidents Senior Dr L.A. Cramer Junior A.A.B. Douglas Immediate Past President R.P. Mohring Ho

    Jan 1, 1999

  • SAIMM
    A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.

    By Simon St J Tose

    The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t

    Jan 1, 2006

  • AUSIMM
    Multi and Synchroblasting – maximising operational productivity

    By G Wyartt

    Systems such as Davey Bickford’s Daveytronic® SP blast initiation system and electronic detonators have been an integral part of drill and blast activities in Australia for over a decade, with th

    Jul 24, 2017

  • CIM
    Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber Structures

    By Olaf Andersen

    Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d

    Oct 1, 2003

  • DFI
    Economic Foundation Design For Tall Buildings

    By Frances Badelow

    This paper describes a design process for piled raft foundations supporting high-rise buildings. The design process comprises an initial stage of geotechnical site characterization using the results o

    Jan 1, 2006

  • AUSIMM
    Structures and Field Relations of Epidiorite Dykes in the Broken Hill Orebody

    A study of literature on the epidiorite dykes which transgress the Broken Hill lode and its wall rocks reveals a considerable diversity of thought regarding the time of emplacement of such dykes. In t

    Jan 1, 1968

  • ISEE
    Rapid Raising

    By Jim Peterson

    Raising equipment that is commonly used include handheld drills such as Jacklegs or Stopers, Alimak raise climber also using handheld drills, drop raises using long-hole drills whether top hammer or I

    Jan 1, 2014

  • SME
    Hydrocyclone Modelling: Large Eddy Simulation CFD Approach

    By Jose A. Delgadillo

    The hydrocyclone problem has been a challenging task for the last 30 years. In the 80’s and 90’s Computational Fluid Dynamics solution to this problem began to appear. These were unsuccessful due to o

    Jan 1, 2005

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • AUSIMM
    The History of Ore Treatment Processes in Broken Hill

    WHEN mining and treatment first started at Broken Hill only oxidised ores were available. These ores were rich in silver and lead-the silver mainly existing as chloride and the lead as carbonate.Treat

    Jan 1, 1928