Search Documents

  • SAIMM
    Ground Control At Leinster Nickel Operations (0c0084dd-072a-410b-a5aa-88a595999659)

    Leinster Nickel Operations, located in Western Australia, consists of an underground and three open pit mines in relatively adverse ground conditions. This paper reviews our ground control practices i

    Jan 1, 2006

  • SAIMM
    Modelling And Assessment Of The Long-Term Leachate Generation Potential In Deposits Of Ferro-Chromiun Slags

    The environmental impact of solid waste materials is closely linked to their potential to produce a hazardous leachate once deposited in a landfill. This potential is conventionally assessed with simp

    Jan 1, 2000

  • ISEE
    The Effects of Short Delay Times on Rock Fragmentation

    By Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson

    "Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements

    Jan 1, 2016

  • AUSIMM
    Technical Challenges in the Flotation of Molybdenite from Porphyry Copper Ores

    Technical Challenges in the Flotation of Molybdenite from Porphyry Copper Ores

    Sep 13, 2010

  • SAIMM
    Wsa-Dc ? Next Generation Topsøe Wsa Technology For Stronger SO2 Gases And Very High Conversion

    By Helge Rosenberg

    Up to now, Topsøe WSA (Wet gas Sulphuric Acid) plants have been in operation for almost 30 years, and close to 80 plants have been sold. In spite of its unique features and ability to treat gases with

    Jan 1, 2009

  • SAIMM
    WSA-DC ? Next Generation Topsøe WSA Technology For Stronger SO2 Gases And Very High Conversion (a4eeea25-ced5-4b18-8ba9-94a89f93e2d0)

    By Helge Rosenberg

    Up to now, Topsøe WSA (Wet gas Sulphuric Acid) plants have been in operation for almost 30 years, and close to 80 plants have been sold. In spite of its unique features and ability to treat gases with

    Jan 1, 2009

  • SAIMM
    The Risks Associated With Mines In Dolomitic Compartments

    By T. A. Ngcobo

    Paper written on project work carried out in partial fulfilment of BSc Eng (Mining)degree The purpose of this report is to assess the risks faced by mines in dolomitic compartments in particular Kl

    Jan 1, 2006

  • ISEE
    Controlling Vibrations Caused by Underground Blasts in LKAB Malmberget Mine

    By Z X. Zhang

    Ground vibrations from the blasts of the LKAB mine at the Malmberget town had reached 18-19 mm/s from year 2000 to 2002. From 2004 to 2010 the maximum vibrations had been reduced to 9 mm/s and most vi

    Jan 1, 2012

  • AUSIMM
    An Environmental Assessment of Lead and Zinc Production Processes

    By W J. Rankin

    A study was carried out to compare the environmental impacts of a number of process routes for lead and zinc metal production from sulphide ores using Life Cycle Assessment methodology and based on av

    Jan 1, 2002

  • SME
    Application Of Tunnel Boring Machines To Coal Mine Entry Development

    By Thomas J. Crocker, Douglas B. Uthus

    Tunnel Boring Machines (TBM) have gained worldwide acceptance in the construction field and are being employed in ever increasing numbers to drive underground transit lines, drainage systems, etc. How

    Jan 1, 1976

  • SAIMM
    Critical Factors For Sustainable Social Projects

    By C. S. Chenga

    Sustainable development is currently an extremely relevant concept worldwide, especially in developing countries like South Africa. Mining and metals companies are also directly affected by the sustai

    Jan 1, 2006

  • SAIMM
    Technological Breakthrough Of The Mintek Thermal Magnesium Process

    By A. F. S. Schoukens

    The Mintek Thermal Magnesium Process (MTMP) was successfully demonstrated in November 2004. The pilot plant was operated continuously for 8 days, during which about 30 tons of magnesium producing reci

    Jan 1, 2006

  • SME
    Determination Of The Practical Spacing Between Holes For The Expansive Mortars Utilization In Dimension Stone Quarries

    By E. Bakhtavar

    Finding a ?practical spacing between the holes? for use of the expansive mortars is an important problem in dimension stone quarries. Objective has been to first introduce a relationship between this

    Jan 1, 2011

  • CIM
    Factors That Affect Cemented Rockfill Quality in Nevada Mines

    By David M. R. Stone

    Underground mining in the gold industry is gaining popularity in Nevada, and with it the use of cemented rockfill is becoming mainstream. Even with today?s high metal prices, however, mining companie

    May 1, 2007

  • IIMP
    Mecanización del desatado y sostenimiento en Milpo

    By Lenin Salazar Dulanto

    La baja de precios en algunos minerales ha obiligado que las empresas mejoren su proceso productivo a través del uso de equipos de última tecnología en los procesos de mecánica, hidráulica, electricid

    Jul 31, 2003

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • SME
    EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City Project

    By Hiroshi Yamazaki

    The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass

  • SAIMM
    Pilot-Plant Solvent Extraction Of Cobalt And Nickel For Avmin?s Nkomati Project

    By A. Feather

    Avmin have developed a flowsheet for the refining of copper, nickel and cobalt from Nkomati concentrates. Cobalt is recovered from calcium-saturated solution using Cyanex® 272. Nickel is subsequently

    Jan 1, 2002

  • SME
    Enhancement Of Bacterial Iron And Sulfate Respiration For In Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study (9e023564-700d-405d-941a-989b38ed4fb9)

    By A. A. Bilgin

    The prevention of acid mine drainage (AMD) in situ is more attractive than down-gradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the m

    Jan 1, 2007

  • TMS
    Robotic Automation Of The Fire Assay Process For Rapid Quantitative Measurement Of Platinum Group Elements In Mineral Concentrator Plants

    By Keith S. McIntosh

    The fire assay process for the quantitative recovery of platinum group elements (PGE?s) prior to subsequent analysis traditionally is a time-consuming process. Samples derive from various ore types an

    Jan 1, 2006